CE Projects-Central Head Office Projects Details Total Projects : 234 |
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
202-09-N-E-W-B-FO-028 |
|
Construction of samudaya bhavana in J.P.Colony at Yelahanka |
2 |
095-10-N-E-E-R-AS-001 |
|
Construction of footpath Asphalting at 17 th main road Muneswara layout |
3 |
089-10-N-E-E-R-AS-004 |
|
Construction of footpath Asphalting at 4th cross road R.P.C.layout Vijaynagar 2 nd stage |
4 |
089-10-N-E-E-R-AS-003 |
|
Construction of footpath Asphalting at 5 th main road R.P.C.layout |
5 |
089-10-N-E-E-R-AS-002 |
|
Construction of footpath Asphalting at I st main road and pipe line road Vijaynagar |
6 |
089-10-N-E-E-R-AS-001 |
|
Construction of footpath Asphalting at 9 th main road and 3rd cross road Vijaynagar |
7 |
068-08-N-J-I-R-GS-001 |
|
Consultancy Services For Preparation of DPR For Construction of Grade Seperator at Kormangala Inner Ring Road in Ward No.68 |
8 |
063-09-MSED-IM-001 |
|
Impts of SWd from B. Road up to Tavarekere Road Via Bhavaninagara and Krishnamurthy Layout and Reconstruction of Bridge a cr SWD Balajinagar 2nd Main Rd in WNo. 63 |
9 |
062-06-N-K-P-G-FO-001 |
|
Development of Lakkasandra Quarry Sports Complex |
10 |
060-08-N-J-I-R-AS-003 |
|
Asphalting to 11th main road from Pai vijay circle via Arvin marg to 45th cross raod Jayanagar |
11 |
059-08-N-J-I-R-AS-003 |
|
Asphalting to Main Road from MM Industrail Estate to Monotype Road |
12 |
059-08-N-J-I-R-AS-002 |
|
Asphalting to KR Road from Garadi Appprtments to MM industrial estate |
13 |
057-08-N-J-I-R-AS-001 |
|
Asphalting to 11th Main road from 45th cross to 15th crossJP Nagar via Shanthisagar |
14 |
046-10-M-G-E-AS-005 |
|
Re-asphalting of damaged tar surface and Reconstruction of Culverts drain in Ramaiah Garden Siddarth layout Shankar Dikshith Colony and Patalamma layout in Kadugudi |
15 |
037-09-M-G-H-P-MN-001 |
|
Construction of two Loops to the Existing Flyover at Silk Board Junction Bangalore (NH7 & Ring road junction) |
16 |
015-09-M-G-T-E-MN-001 |
|
A.M.C. of Electrical Installation by engaging Electrician wire men Helper Operator DG Set A C Aditorium pumpset and BBMP office etc at Rajajinagar shopping complex. |
17 |
000-10-N-P-R-E-AS-005 |
|
Consultancy Services for Preparation of DPRTender Documents for Underpass in Bangalore City in Puttenahalli Junction |
18 |
000-10-N-P-R-E-AS-003 |
|
Detailed estimate for Asphalting of Old Airport road from Suranjandas road to HAL Helicopter division Ch: 5.6 to 7.0 Km |
19 |
000-10-N-P-R-E-AS-002 |
|
Detailed estimate for Asphalting of Old Airport road from Domlur fly over to Suranjandas road Ch: 3.0 to 5.6 Km |
20 |
000-10-N-P-R-E-AS-001 |
|
Detailed estimate for Asphalting of Old Airport road from Trinity circle to Domlur fly over Ch:0.0 to 3.0 Km |
21 |
000-10-N-P-P-R-PC-006 |
|
Construction of cement concrete pavement at NR Road-part F(chainage C 700 to C 900mt) |
22 |
000-10-N-P-P-R-PC-005 |
|
Construction of cement concrete pavement at NR Road-part E(chainage C0 to C700 mt) |
23 |
000-10-N-P-P-R-PC-004 |
|
Construction of cement concrete pavement at NR Road-part D(chainage C350 to C550mt) |
24 |
000-10-N-P-P-R-PC-003 |
|
Construction of cement concrete pavement at NR Road-part B(chainage C0 to C200mt) |
25 |
000-10-N-P-P-R-PC-002 |
|
Construction of cement concrete pavement at NR Road-part C(chainage C200 to C350mt) |
26 |
000-10-N-P-P-R-PC-001 |
|
Construction of cement concrete pavement at NR Road-part A(chainage B0 to B360 mt) |
27 |
000-10-N-P-P-R-F-O-003 |
|
Proposed construction of Service road on Outer Ring Road from Mysore road junction to Hosakerehalli road junction( Ch: 0.00km to 1.70 km- Right side) |
28 |
000-10-N-P-P-R-F-O-002 |
|
Proposed construction of Service road on Outer Ring Road from Mysore road junction to Hosakerehalli road junction( Ch: 0.00km to 1.70 km- Left side) |
29 |
000-10-N-P-P-R-CO-001 |
|
Proposed construction of Cement Concrete road at Kothanur Dinne Baangalore South Constituency 2nd Phase Bangalore. |
30 |
000-10-N-P-P-R-AS-029 |
|
Asphalting to Bugal rock main road from KR road to Bull temple road in ward no 51 . |
31 |
000-10-N-P-P-R-AS-007 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 7010.00 to 7770.00 Mts |
32 |
000-10-N-P-P-R-AS-006 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 5890.00 to 7010.00 Mts |
33 |
000-10-N-P-P-R-AS-005 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 4760.00 to 5890.00 Mts |
34 |
000-10-N-P-P-R-AS-004 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 3570.00 to 4760.00Mts |
35 |
000-10-N-P-P-R-AS-003 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 2380 to 3570.00 Mts |
36 |
000-10-N-P-P-R-AS-002 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 1180.00 to 2380 Mts |
37 |
000-10-N-P-P-R-AS-001 |
|
Proposed Construction of Footpath Asphalting at Varthur Road Bangalore Package 1 from Chainage 0.00 to 1180.00 Mts |
38 |
000-10-N-P-P-O-MI-133 |
|
Prpn of Feasibility report and DPR for the Comprehensive development of Bellary road & construction of Elevated rd from High Ground Police station to 5 Flyover |
39 |
000-10-N-P-P-O-MI-068 |
|
Consultancy services for the work of Construction of RUB/ROB at L. C. near Nayandana halli |
40 |
000-10-N-P-P-O-MI-067 |
|
Consultency servicess for the work of Construction of ROB/RUB at Railway level crossing in Horamavu main road |
41 |
000-10-N-P-P-O-MI-065 |
|
Consultancy services for the work of Construction of RUB/ROB at Boopsandra |
42 |
000-10-N-P-P-O-MI-063 |
|
Consultancy services for the work of Construction of RUB at Nagenahalli |
43 |
000-10-N-P-P-O-MI-062 |
|
Consultancy services for the work of construction of ROB/RUB at Jakkur at L.C.no 11 |
44 |
000-10-N-P-P-O-MI-061 |
|
Consultancy servicess for the work of construction of ROB/RUB at Narasimaiah compound |
45 |
000-10-N-P-P-O-MI-059 |
|
consultency servicess for the work of Construction of RUB/ROB at K G halli |
46 |
000-10-N-P-P-O-MI-032 |
|
Consultancy services for Consruction of grade seperator integrating Vatalnagraj rd Shivanagar & Basaveshwara nagar rd. |
47 |
000-10-N-P-P-O-MI-027 |
|
Consultancy services for preparation of preliminary reports and documents for construction of Grade separator integrating Konanakunte road and Uttarahalli road on Kanakapura main road. |
48 |
000-10-N-P-P-O-MI-026 |
|
Prpn of Preliminary report and documents for the construction of Grade Separator integrating Hampinagar 1st main road and Vijayanagar pipeline road |
49 |
000-10-N-P-P-O-FY-001 |
|
Construction of Fly over at Kittur Rani Channamma circle Bangalore |
50 |
000-10-N-P-P-G-CD-003 |
|
Construction of Indoor and Outdoor sports complex at RBI Layout JP Nagar 7th & 8th Phase Bangalore |
51 |
000-10-N-P-P-G-CD-002 |
|
Development of playground at Begur |
52 |
000-10-N-P-P-G-CD-001 |
|
Development of playground and Auditorium at Subramanyapura |
53 |
000-10-N-P-P-B-FO-002 |
|
Proposed Construction of Pedestrain subway at Rajbhavan road infront of Nehru Planitorium Bangalore |
54 |
000-10-N-P-P-0-MI-061 |
|
Consultancy services for the work of Construction of RUB/ROB at R.K.Hegde Nagar Byatarayanapura. |
55 |
000-09-N-Y-P-R-AS-007 |
|
Asphalting to Ring Road from Mysore Rd Junction to Silk Board Junction via J.P.NagarBTM Layout Ch.13.25 to 14.00Km |
56 |
000-09-N-Y-P-R-AS-006 |
|
Asphalting to Ring Rd from Mysore Rd Junction to Silk Board Jnct via J.P.NagarBTM Lyt Ch.11.30 to 13.25km Left Side Carriageway(Northern Side) |
57 |
000-09-N-Y-P-R-AS-005 |
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 7.40 km to 9.80 km left side |
58 |
000-09-N-Y-P-R-AS-004 |
|
Asphalting to Ring Road from Mysore Road Junction to Silk Board Junction via J.P.NagarBTM Layout from Ch:13.50Km to 14.00Km.Right Side Carriageway Southern Side |
59 |
000-09-N-Y-P-R-AS-002 |
|
Asphalting to Ring Rd from Mysore Rd Junction to Silk Board Junction via JP Nagar BTMLyt from Ch8.80 km to 10.00 & 11.30km-11.80 km Right side carraigeway southern side |
60 |
000-09-N-Y-P-R-AS-001 |
|
Asphalting to Ring Road from Mysore Road junction to Silk Board junction via J.P.Nagar B.T.M.layout from Ch: 7.10 km to 8.80 Km Right side carriage way (Southern side) |
61 |
000-09-N-P-P-OMI-049 |
|
Consultancy services for preparation of DPR for construction of Rigid pavement at UB City & Vittal Mallya Road |
62 |
000-09-N-P-P-OMI-049 |
|
Consultancy services for preparation of DPR for construction of Rigid pavement at N.R Road |
63 |
000-09-N-P-P-O-MI-055 |
|
Consultancy services for preparation of DPR for Construction of Elevated Corridor from Minerva circle to Hudson |
64 |
000-09-N-P-P-O-MI-017 |
|
Preparation of Technical and Economic Feasibility Study Report for Construction of Underpass Using RCC Precast Elements at Hosmat Junction |
65 |
000-09-N-P-P-O-MI-008 |
|
Project Management Consultancy for Construction Supervision and Project Management of Asphalting Arterial/Sub Arterial Roads(12 Works) |
66 |
000-09-N-P-P-O-MI-006 |
|
Consultancy Services for Preparation of DPR for Construction of Elevated Road from Sirsi Circle Flyover To Kengeri on Outer Ring Road |
67 |
000-09-N-P-P-O-MI-005 |
|
Preparation of Technical and Economic Feasibility Study Report for Cnstrction of Underpass Usg RCC Precast Elements at junct of Bannerghata Rd and ApoloHospital |
68 |
000-09-N-P-P-O-MI-004 |
|
Preparation of Technical & Economic Feasibility Study report for Construction of Underpass Using RCC Precast Elements at Junct of Ring Rd & Rd Leading to Kumaraswamy Lyt. |
69 |
000-09-N-P-P-O-MI-003 |
|
Preparation of Technical & Economic Feasibility Study Report for Construction of Underpass Using RCC Precast Elements at Jnctn of Race Course Rd & Hare Krishna Rd |
70 |
000-09-N-P-E-O-MI-079 |
|
Consultancy services for preparation of Feasibility report for the proposed construction of 20m corridor from Hosur road to BTM layout junction. |
71 |
000-09-N-P-E-O-MI-043 |
|
Construction of retaining wall in Lakkasandra quarry pit in ward no 62 New-145 |
72 |
000-09-N-P-E-O-MI-027 |
|
Consultancy Services For Preparationof DPR For Construction of Grade Seperator at the Junction of Ring Road and 16th Main BTM Layout |
73 |
000-09-N-P-E-O-MI-026 |
|
Consultancy services for construction of Grade seperator and combination of both at Kanakpura Road and Ring Road Junction Integrating Banashankari Temple Junction |
74 |
000-09-N-P-E-O-MI-024 |
|
Consultancy Services for preparation of DPR for the proposed construction of Elevated road from Yeshwanthpur Circle to KM 10 of NH4 |
75 |
000-09-N-G-J-H-IM-010 |
|
Improvements to Junction at Giriyabhovi Palya Junction SD Road and JB Nagar Junction SD Road Michelpalya and CV Raman Nagar Junction Vishweshwaraiah College Junction. |
76 |
000-09-M-P-E-O-MI-002 |
|
Project Management Consultancy of Asphalting to RIng Road from Myosre Road Junction To Silk Board Junction via J.P.NagarBTM Layout In Bangalore City(15 Works) |
77 |
000-09-M-P-E-O-FY-001. |
|
Repairs to Sirsi Circle Flyover including Civil and Bituminous Works |
78 |
000-09-M-P-E-O-FY-001 |
|
Maintenance of Sirsi Circle Flyover Replacing Expansion Joints Mysore road Bangalore |
79 |
000-08-N-P-I-R-SV-001 |
|
Consultancy Services For Preparation of DPR For Study of Existing ROB and Proposed Improvements To ROB at IOC Gate Banaswadi |
80 |
000-08-N-P-I-R-AS-013 |
|
Asphalting to ring road from Mysore road jn to Silk board jn via J.P.Nagar B.T.M. Layout from Chainage 5.30km to 7.10km left side carriage way |
81 |
000-08-N-P-I-R-AS-012 |
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 0.00 km to 1.70km. Left side carriage way |
82 |
000-08-N-P-I-R-AS-011 |
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 0.00 km to 1.90 km. Right side carriage way |
83 |
000-08-N-P-I-R-AS-010 |
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 3.50 km to 5.30 km left side carriage way. (Norther Side) |
84 |
000-08-N-P-I-R-AS-009 |
|
Asphalting to ORR from Mysore road jn.to Silk board jn. via J.P.Nagar B.T.M. Layout from Ch: 1.70 km to 3.50km. Left carriage way (Northern side) |
85 |
000-08-N-P-I-R-AS-008 |
|
Asphalting to Ring Road from Mysore Road Junction to Silk Board Junction via J.P. Nagar B.T.M.Layout from Ch:5.90 km to 7.40 km Right side carraigeway (southern side) |
86 |
000-08-N-P-I-R-AS-007 |
|
Asphalting to Ring Rd from Mysore Rd Junction to Silk Board Junction via JP Nagar BTMLyt from Ch3.9 km to 5.9km Right side carraigeway (southern side) |
87 |
000-08-N-P-I-R-AS-006 |
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 1.90 km to 3.90 km. Right side carriage way |
88 |
000-08-N-P-I-C-FO-002 |
|
Consultancy servicess for Construction of Railway under bridge and Other Allied Works at Railway Level Crossing Near Allalsandra (LC No: 11A |
89 |
000-08-N-J-P-R-AS-002 |
|
Strengthening Resurfacing and improvements to Kengal Hanumanthaiah Road (Double Road) in Bangalore city from Mission road junction to Lalbagh North Gate. (Eastern side) |
90 |
000-08-N-J-P-R-AS-001 |
|
Resurfacing and improvements to Kengal Hanumanthaiah Road (Double Road) in Bangalore city from Mission road junction to Lalbagh North Gate. (Western side) |
91 |
000-08-N-J-O-UP--WRONG |
|
ABCDEFG |
92 |
000-08-N-J-I-R-UP-004 |
|
Project Management consultants for Construction of Underpass at Nagawara junction on ORR |
93 |
000-08-N-J-I-R-UP-002 |
|
Consultancy Services for Preparation of DPRTender Documents for Underpass in Bangalore City at Ring Road and Hennur Road Junction |
94 |
000-08-N-J-I-R-UP-001 |
|
Consultancy Services for Preparation of DPR for Construction of GradeSeperator or Combination of both at Hudson Circle |
95 |
000-08-N-J-I-R-GS-003 |
|
Consultancy Services for Preparation of DPRTender Documents for Underpass in Bangalore City at C.N.R.Rao Circle |
96 |
000-08-N-J-I-R-GS-002 |
|
Consultancy services for construction of underpass/grade seperator and combination of both at K.R.Circle in Bangalore city |
97 |
000-08-N-J-I-R-GS-001 |
|
Consultancy Services 4 Preparation of DPR for Constrction of Grade Seperator @ Chenama CircleLingarajpuramBannerghataMaharani's college circleKalyanNagar Road Jnctns |
98 |
000-08-N-J-I-R-AS-085 |
|
Detailed Estimate for Asphalting to road from IIPM Junction (ORR) to SWD (Vrishabhavathi valley) ch:400 to 825M. |
99 |
000-08-N-J-I-R-AS-084 |
|
Detailed Estimate for Asphalting to road from IIPM Junction (ORR) to SWD (Vrishabhavathi valley) ch:0 to 400M. |
100 |
000-08-N-J-I-R-AS-052 |
|
Asphalting to ORC road from ch 0 to 1000mtr |
101 |
000-08-N-J-I-R-AS-051 |
|
Asphalting to Mother Teresa road from Ch 0 to 1200mtr |
102 |
000-08-N-J-I-R-AS-036 |
|
Asphalting to Kumarakrupa road from RMB Aradya circle via Shivananda circle to sankey road junction ( opp to Windsor manor Circle) Bangalore |
103 |
000-08-N-J-I-R-AS-035 |
|
Asphalting to Harekrishna road from Madhava nagara RUB to Race course road junction |
104 |
000-08-N-J-I-R-AS-033 |
|
Asphalting to Subedar Chatram road and Sheshadripuram main road from Bellary road junction to link road junction along seshadripuram raod |
105 |
000-08-N-J-I-R-AS-032 |
|
Asphalting to Cresent road from Kumarakrupa junction to Hotel Bangalore international Via Gururaj Choultry |
106 |
000-08-N-J-I-R-AS-029 |
|
Asphalting to RRMR Road from Hudson Circle to Malya Hospital Junction |
107 |
000-08-N-J-I-R-AS-028 |
|
Asphalting to RRMR Road from Mallya Hospital Junction to Richmond Circle |
108 |
000-08-N-J-I-R-AS-025 |
|
Asphalting to KG Road from Mysore Bank cirlce to KG Circle |
109 |
000-08-N-J-I-R-AS-024 |
|
Asphalting to K.G.Road From Hudson Circle to Kaveri Building |
110 |
000-08-N-J-I-R-AS-023 |
|
Asphalting to Lalbagh Road from Subbaih Circle to Lalbagh Main Gate |
111 |
000-08-N-J-I-R-AS-021 |
|
Asphalting to Chamarajpet 1st main road in liew of asphalting to roads from anandrao circle to Goodshed road in front of City railway station |
112 |
000-08-N-J-I-P-AS-053 |
|
Asphalting to Mosque Road from Coles road to Railway line |
113 |
000-08-N-J-I-O-UP-003 |
|
Consultancy Services for Preparation of DPRTender Documents for Six Underpasses in Bangalore City(1)Kadirenahalli Junt |
114 |
000-08-N-J-I-O-UP-002. |
|
Project Management consultants for Construction of Underpass at Hennur Banasawadi |
115 |
000-08-N-J-I-O-UP-002 |
|
Project Management consultants for Construction of Underpass at Hennur Banasawadi |
116 |
000-08-I-P-I-R-CD-004 |
|
Construction of Concrete roads for Vulnerable reaches at K.H.Road Bangalore |
117 |
000-08-I-P-I-R-CD-003 |
|
Improvements to JC Road in Bangalore city from Minerva junction to Bharath Talkies junction H.Siddaiah Road from Bharath Talkies junction to Urvashi Talkies junction |
118 |
000-08-I-P-I-R-CD-001 |
|
Improvements to Jaya Chamarajendra Road in Bangalore city from Bharath Talkies junction to Kannada Bhavan Junction (From Ch: 300.00m to 900.00m) |
119 |
000-08-I-J-I-R-SV-005 |
|
Consultancy Services For Preparation of DPR For Connecting Two Loops To Existing Flyover At Silk Board Junction(NH-7 and Ring Road Junction) |
120 |
000-06-N-P-P-O-SU-004A1 |
|
Consultancy services for preparation of DPR for Construction of Subway at City Market |
121 |
000-06-N-P-P-O-SU-004 |
|
Construction of Subway at City Market |
122 |
000-06-N-P-P-O-SU-002 |
|
Construction of Pedestrian subway infront of Town hall |
123 |
000-06-N-P-P-O-FY-001A1 |
|
Consultancy services for preparation of DPR for Construction of Flyover at Yeshwanthpur circle |
124 |
000-06-N-P-P-O-FY-001 |
|
Construction of Flyover at Yeshwanthpur circle |
125 |
000-06-N-P-P-0-FY-002 |
|
Construction of underpass at malleshwaram circle |
126 |
000-06-N-P-0SU-004 |
|
Construction of Pedestrian Subway at City Market |
127 |
000-06-I-P-I-R-CD-002 |
|
Improvements to Jaya Chamarajendra Road Kannada bhavan junction to Hudson Circle (Ch 900 to 2000) |
128 |
|
|
RUB-Virupakshipura (Kodigehalli) |
129 |
|
|
RUB-Sampige Road Cross near Anjaneya swamy Temple Srirampuram |
130 |
|
|
RUB-R.P.C.layout Shamanna garden. L.C.No.4 |
131 |
|
|
RUB-Bapujinagar L.C.No.5 |
132 |
|
|
RUB near 10 Railway station near Cable Stay bridge |
133 |
|
|
RUB at Narasimhappa Compound |
134 |
|
|
RUB at Kasthuri Nagara |
135 |
|
|
RUB Allalasandra |
136 |
|
|
ROB-Nagavara |
137 |
|
|
ROB-Byappanahalli |
138 |
|
|
M.S.Ramaiah junction development regarding |
139 |
|
|
Construction RUB Sriramapura (Agra Gate) at LC No.6 |
140 |
|
|
Construction of Underpass at Railway level crossing in Singayyanapalya near Madevapura |
141 |
|
|
Construction of Underpass at Railway level crossing in Horamavu main road |
142 |
|
|
Construction of RUB/ROB at R.K.Hegde Nagar 26. |
143 |
|
|
Construction of RUB/ROB at L. C. near Nayandana halli |
144 |
|
|
Construction of RUB/ROB at K G halli |
145 |
|
|
Construction of RUB/ROB at 27 old town Opp. MES circle 27 Railway station |
146 |
|
|
Construction of RUB/ROB at Boopsandra |
147 |
|
|
Construction of RUB Jakkuru at LC No.11 |
148 |
|
|
Construction of RUB for light motor vehicles on Bangalore Mysore railway line near Kengeri railway station |
149 |
|
|
Construction of RUB at Nagenahalli |
150 |
|
|
Construction of RUB at Mysore lamp Malleswaram |
151 |
|
|
Construction of RUB at Ligarajpuram |
152 |
|
|
Construction of RUB at 18th cross Malleshwaram near Nirmala Rani school |
153 |
|
|
Construction of RUB at 11th cross Malleshwaram |
154 |
|
|
Construction of RUB / ROB at LC No. 134 B 10 near FCI Godden |
155 |
|
|
Construction of ROB/RUB near Sadaramangala |
156 |
|
|
Construction of ROB/RUB @Small railway gate near Kadugodi |
157 |
|
|
Construction of ROB/RUB @ Yeshwanthpura railway station |
158 |
|
|
Construction of ROB/RUB @ Thanisandra |
159 |
|
|
Construction of ROB/RUB @ Shivaram Karanth Layout |
160 |
|
|
Construction of ROB/RUB @ Munikolalu |
161 |
|
|
Construction of ROB/RUB @ Karmalaram |
162 |
|
|
Construction of ROB/RUB @ Kaggadaspura |
163 |
|
|
Construction of ROB/RUB @ Doddakannahalli |
164 |
|
|
Construction of ROB/RUB @ 5 Flyover |
165 |
|
|
Construction of ROB/RUB @ 18th Cross Kanakanagara |
166 |
|
|
Construction of ROB/RUB @ Chinnapanahalli |
167 |
|
|
Construction of ROB on Bangalore Salem Railway line across Bangalore Sarjapura road |
168 |
|
|
Construction of Elevated Corridor from Minerva circle to Hudson |
169 |
|
|
Construction of BBMP Hospital at Uttarahalli Bangalore |
170 |
|
|
Construction of Additional box near Binny mill |
171 |
|
|
Construction of RUB near Banasawadi IOC |
172 |
|
|
Consruction of grade seperator integrating Vatalnagraj rd Shivanagar & Basaveshwara nagar rd. |
173 |
|
|
Resurfacing to Roads infront of BBMP head office around N.R.Square Bangalore |
174 |
|
|
Prpn of Feasibility report and DPR for the Comprehensive development of Bellary road and construction of Elevated rd from High Ground Police station to Hebbal Flyover |
175 |
|
|
M.S.Ramaiah junction development regarding |
176 |
|
|
Estimate for the work of Mastic Asphalting to junctions Package1 |
177 |
|
|
Estimate for the work of Mastic Asphalting to Junctions Package-2 |
178 |
|
|
Consultantancy services for the work of Construction of ROB on Bangalore Salem Railway line across Bangalore Sarjapura road |
179 |
|
|
CONSULTANCY SERVICESS FOR THE WORK OF Construction of vehicular subway by boxpushing techniqe across bangalore -tumkur railway track at Srirampuram |
180 |
|
|
Consultancy servicess for the work of Construction of ROB/RUB at Railway level crossing in Singayyanapalya near Madevapura |
181 |
|
|
consultancy services for the work of remodalling of ROB/RUB at Thanisandra |
182 |
|
|
consultancy services for the work of multispeciality hospital and staff quarters at siddapura in mahadevpura constituency |
183 |
|
|
Consultancy services for the work of Construction RUB Sriramapura (Agra Gate) at LC No.6 |
184 |
|
|
Consultancy services for the work of Construction of RUB/ROB at Yalahanka old town Opp. MES circle Yelahanka Railway station |
185 |
|
|
consultancy services for the work of construction of RUB at Hebbal Flyover |
186 |
|
|
consultancy services for the work of construction of RUB at 18 th cross Malleshwaram near Nirmala rani school |
187 |
|
|
Consultancy services for the work of Construction of RPB/RUB at Shivaramakaranth layout |
188 |
|
|
Consultancy services for the work of Construction of ROB/RUB at Small railway gate near Kadugodi |
189 |
|
|
Consultancy services for the work of Construction of ROB/RUB at near Sadaramangala |
190 |
|
|
consultancy services for the work of construction of ROB/RUB at Kagadaspura |
191 |
|
|
consultancy services for the work of construction of ROB/RUB at Banaswadi IOC |
192 |
|
|
Consultancy services for the work of Construction of ROB/RUB at at Chinnapanahalli |
193 |
|
|
consultancy services for the work of construction of Elevated road on Lalbagh main road form Siddaiah road to Lalbagh fort road and Marrigowda road |
194 |
|
|
consultancy services for the work of construction of Addtional box near binny mill |
195 |
|
|
Consultancy Services for Preparation of DPR Tender Documents for Underpass in Bangalore City Ring Road and Nagavara Junction |
196 |
|
|
Consultancy Services for Preparation of DPR Tender Documents for Underpass in Bangalore City in Puttenahalli Junction |
197 |
|
|
Consultancy Services for Preparation of DPR Tender Documents for Underpass in Bangalore City at Ring Road and Hennur Road Junction |
198 |
|
|
Consultancy Services for Preparation of DPR Tender Documents for Underpass in Bangalore City at C.N.R.Rao Circle |
199 |
|
|
Consultancy Services for Preparation of DPR Tender Documents for Six Underpasses in Bangalore City(1)Kadirenahalli Junt |
200 |
|
|
Consultancy services for Grade Separator at Dr C.V raman road and M.S Ramaiah road junction Bangalore |
201 |
|
|
Construction of vehicular subway by boxpushing techniqe across bangalore -tumkur railway track at Srirampuram |
202 |
|
|
Construction of two Loops to the Existing Flyover at Silk Board Junction Bangalore (NH7 and Ring road junction) |
203 |
|
|
construction of RUB-Virupakshipura (Kodigehalli) |
204 |
|
|
Construction of RUB-R.P.C.layout Shamanna garden. L.C.No.4 |
205 |
|
|
Construction of RUB next to Cable stayed bridge at K.R. Puram |
206 |
|
|
Construction of RUB at LC No. 134 B K.R.Puram near FCI Godden |
207 |
|
|
Construction of RUB at Kasturi nagar between bayyappanahalli and channasandra railway station. |
208 |
|
|
Construction of RUB at Bapujinagar. L.C.No 5 |
209 |
|
|
Construction of RUB at 11th cross Malleshwaram |
210 |
|
|
Construction of Railway under bridge and Other Allied Works at Railway Level Crossing Near Allalsandra (LC No: 11A on Hindupura €“ Bangalore Line) Bangalore |
211 |
|
|
Construction of Railway under bridge and Other Allied Works at near kengeri railway station Bangalore-Mysore line Bangalore |
212 |
|
|
Construction of R.O.B. at Nagavara |
213 |
|
|
construction of R.O.B at Byappanahalli. |
214 |
|
|
Construction of New Alignment and Appurtenant Works between Fountain Circle and Okalipuram Junction Bangalore |
215 |
|
|
Construction of Elevated road fromalong Mysore road Bangalore. |
216 |
|
|
Construction of 20m Corridor from Hosur Road to BTM Layout junction on Madiwala Tank Bund. |
217 |
|
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 5.90 to 7.40 Km Southern Side |
218 |
|
|
Asphalting to ring road from Mysore road junction to Silk board junction via J.P.Nagar B.T.M. Layout from Chainage 0.00 km to 1.90 km. Right side carriage way |
219 |
|
|
A.M.C. of Electrical Installation by engaging Electrician wire men Helper Operator DG Set A C Aditorium pumpset and BBMP office etc at Rajajinagar shopping complex. |
220 |
303-11-000050 |
|
Construction Of Corridor From Okalipuram To Fountain Circle (Traffic Free) |
221 |
304-13-000140 |
|
Construction of Signal Free Corridor along Dr. Rajkumar Road from Okalipuram Junction to Government Soap Factory Junction |
222 |
304-13-000143 |
|
Construction of Grade Separator at the junction of West of Chord Road and Rajinagar 10th Cross |
223 |
133-14-00041 |
|
Pre cast Pre Tensioned cum RCC approach slab Ramp over existing bridge and re grading of road towards Mysore road near Gali Anjeneya Temple
|
224 |
303-11-00050 |
|
Construction of 8 lane corridor with loops under pass and road under bridges between Okalipuram junction and Fountain circle |
225 |
303-13-00059 |
|
Construction of running room for south western Railway at Railway premises in central railway station Bangalore |
226 |
303-14-00007 |
|
Construction of Four lane divided bi-directional Flyover along outer Ring road at Kittur Rani Chennamma circle, Bangalore |
227 |
303-14-00006 |
|
Construction of Animal Incinerator at approved changed place i.e. Beggars colony,Sumanahalli Magadi road, Bangalroe |
228 |
R-303-11-000034 |
|
Construction of 20m Corridor from BTM Layout to Hosur Road along Madiwala Tank Bund Road, Bangalore. |
229 |
304-13-000157 |
|
Construction of four lanes divided bi-directional underpass at the junction of Magadi and Basaveswaranagar road along Magadi road Bangalore |
230 |
303-14-000004 |
|
Construction of 75 Nos E-toilets in BBMP limits |
231 |
304-14-000299 |
|
Upgradation of five roads in Bangalore City as per Tender Sure Standards(Package-3) (Kempegowda road , Nrupatunga road,Modi Hospital Road,Siddaiahpuranik road,11th main Road, Jayanagar) |
232 |
303-13-000059 |
|
Proposed construction of Eight Lane corridor with loops, Underpass & Road Under Bridges between Okalipuram junction & Fountain circle. Running Room |
233 |
304-13-000142 |
|
Construction of Signal Free Corridor along Identified Stretches of Road from Vellara Junction to Hope Farm Junction (via Old Airport Road, Kundalahalli and Whitefield) in Bangalore City (on Lump Sum Turnkey Basis) |
234 |
303-16-000001 |
|
Construction of basement MLCP at Freedom Park Gandhi Nagar |