CE Major Roads Head Office Projects Details Total Projects : 1142 |
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
Workcode to be Given |
|
Procurement of RCC Precast Box segments of size 7.50m x 4.50m x 1.00m for Vehicular Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
2 |
Work Code to be Given s |
|
Improvements ans asphaltingof internal roads of EPIP and construction of Flyover/underpass @ Graphite India Jn. |
3 |
Work code to be Given o |
|
Procurement of Additional RCC Precast Box Segments Of 7.50m X4.50m X1.00m for Vehicular Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
4 |
Work Code to be given d |
|
Proposed Signal Free Corridor from Yeshwanthpura to Okalipuram Jn(3rd blk Bridge Stone Jn Navarang Jn and Asphalting to Corridors) |
5 |
Work code to be Given b |
|
Lowering of RCC Precast box segments of size 7.50mx4.50mx1.00m for Vehicular underpass Along Dr. Rajkumar Road at Okalipuram Junction. |
6 |
Work code to be Given a |
|
Providing Drainage facilities to Underpass along Dr. Rajkumar Road at Okalipuram Junction |
7 |
Work code to be Given 4 |
|
Procurement of RCC Precast Box SEgments of size 7.50mx4.50x1.00m for Vehicular Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
8 |
Work code to be Given 3 |
|
Procurement of RCC Pre Cellular Block of Size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
9 |
Work code to be Given 2 |
|
Construction of Retaining for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
10 |
Work code to be Given 1 |
|
Construction of approach road for Underpass and Other Allied works for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
11 |
Work code to be Given 01 |
|
Formation and construction of road from Magadi road to Rajajinagar Entrance side. |
12 |
Work Code To be Given |
|
Formation of Service Road and Concreting to Ramps for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
13 |
204-09-N-G-F-B-002 |
|
Construction of Water Bound Macadam Road for transportation of Municipal Solid Waste in transfer point in BBMP land in Sy.No.142 B.Narayanpura. |
14 |
203-09-N-S-E-R-WD-001 |
|
StrengtheningWidening and asphlting to Thirteen selected Arterial and Sub arterial roads in Byatarayanapura zone Dasarahalli zone and Mahadevapura zone under Package-II |
15 |
202-09-N-G-E-R-FO-001 |
|
Construction of footpth and decks from police station circle to NES circle. |
16 |
202-09-N-G-E-O-MI-009 |
|
Providing garbage transit plant in Kogilu Circle |
17 |
202-09-N-G-E-D-FO-001 |
|
Improvements and Construction of Drains to Coffee Board Layout in Amruthahalli Circle Limit |
18 |
202-09-MG-E-R-AS-005 |
|
Improvements to rods and drains and asphlting to Ambabhavani temple raod to Vodeyara halli lake of Yelahanka New Town. |
19 |
202-09-M-G-E-R-AS-031 |
|
Asphalting Road from N.H. 7 to JNRC via Jakkur Layout. CH: 1.70 K.M. to 2.50 K.M in Dasarahalli Sub Division. |
20 |
202-09-M-G-E-R-AS-030 |
|
Asphalting Road from N.H. 7 to JNRC via Jakkur Layout. CH: 0.90 K.M. to 1.70 K.M in Dasarahalli Sub Division. |
21 |
202-09-M-G-E-R-AS-029 |
|
Asphalting Road from N.H. 7 to JNRC via Jakkur Layout. CH: 0.00 K.M. to 0.90 K.M in Dasarahalli Sub Division. |
22 |
202-09-M-G-E-D-IM-017 |
|
Improvement to drain and main road of Venkatala from NH-7 opposite to MAruthinagara BB Bakery |
23 |
202-09-I-G-E-R-AS-016 |
|
Improvements and Asphalting to 2nd Main Road of Hegdenagar and Ramaiah Road to Arkavathi Layout |
24 |
202-09-I-G-E-D-CD-005 |
|
Improvements drain and asphalting to roads in Papanna layout. |
25 |
202-09- N-P-E-R-WD-056 |
|
Widening of Asphalted surface and construction of RCC Drain Utility Duct and formation of Footpath From NAGAVARA JUNCTION TO BELLAHALLI CROSS VIA Thanisandra. Chainage. |
26 |
202-09- N-P-E-R-WD-055 |
|
Widening of Asphalted surface and construction of RCC Drain Utility Duct and formation of Footpath From NAGAVARA JUNCTION TO BELLAHALLI CROSS VIA Thanisandra. Chainage. |
27 |
201-09-N-J-N-D-FO-030 |
|
Remodeling of SWD from Begur waste Weir to NH7 Bangalore Road from Ch:2500 to 3194 m in Bommanhalli |
28 |
129-10-M-G-H-P-IM-002 |
|
PROVIDING CHILDRENS PALY EQUIPMENT IN MARUTHI LAY OUT AND NAL LAYOUT PARKS IN WARD 64 |
29 |
128-10-N-G-H-P-FO-005 |
|
REPAIRS TO PATHWAYS AND OTHER WORKS IN PATTABHI RAMA NGARA PARK 18th MAIN IN WARD 58 |
30 |
127-10-N-G-H-P-IM-003 |
|
IMPROVEMENTS AND DEVELOPMENTS TO BHAVI PARK IN WARD 60 |
31 |
127-10-N-G-H-P-IM-002 |
|
IMPROVE MENTS TO CHILDREN PLAY AREA OF SWIMMING POOL PARK IN WARD 60 |
32 |
127-10-N-G-H-P-I.M-008 |
|
IMPROVE MENTS AND REPAIRS TO PATHWAY AT BHAVI PARK |
33 |
120-10-N-A-E-D-BS-001 |
|
Construction of Drains and Culverts at Kenchenahalli Village in RRNagara |
34 |
120-10-M-A-E-R-IM-003 |
|
Improvements to main roads and cross roads at BEML 4th Stage of Rajarajeshwarinagara sub division. |
35 |
120-10-M-A-E-R-IM-002 |
|
Improvements to main roads and cross roads at BEML 4th Stage of Rajarajeshwarinagara sub division. |
36 |
120-10-M-A-E-R-IM-001 |
|
Improvements to drains in main roads and cross roads around Devadiga Soudha of Rajarajeshwarinagara sub division. |
37 |
098-04-N-P-J-R-WD-001 |
|
Widening of Jayamahal Road from Mekhri Circle to Doordarshan |
38 |
066-09-M-S-H-P-IM-001 |
|
DEVELOPMENT WORKS IN THE PARK IN VENKATAPURA COLONY IN HSR LAYOUT IN WARD 66 |
39 |
066-08M-G-H-P-MN-003 |
|
providing benches and dust bins in hosur road park in ward 66 and in the Triangular park in ward 55 |
40 |
066-08-M-G-H-P-MN-004 |
|
REPAIRS TO BORE WELLL AND DELOPMENTAL WORKS IN JOGI PALY APARK IN WARD 66 |
41 |
065-09-N-G-H-P-RE-001 |
|
Repair to chain link fencing and pathways and providing painting in the NS palya in BTM constituency in ward 66 |
42 |
065-09-N-G-H-B-FO-001 |
|
CONSTRUCTION OF WATCH MAN QTS IN THE MAJOR PARKS OF BTM ASSEMBLY CONSTITUENCY |
43 |
065-09-M-G-H-P-IM-001 |
|
IMPROVEMENTS TO BHAVI PARK IN BTM LAYOUT 2ND STGEIN WARD NO 65 |
44 |
065-09-M-G-H-B-IM-002 |
|
Improvements to KUvempu park on 15 th main Road in BTM layout in ward 65 |
45 |
065-08-M-G-H-P-MN-008 |
|
REPIRS TO BORE WELL ANS OTHER INSTALLATIONS IN KAS OFFICERS L/O PARK |
46 |
065-08-M-G-H-P-MN-007 |
|
REPAIRS TO BORE WELL AND OTHER INSTALLATIONS IN kUVEMPU PARK IN WARD 65 |
47 |
065-08-M-G-H-P-MN-004 |
|
REPAIRS TO BORE WELL |
48 |
064-08-M-G-H-P-MN-005 |
|
REAIRS TO BORE WELL IN NAL LAYOUT PARKS |
49 |
064-08-M-G-H-P-MN-003 |
|
Repairs and developmental works in the NIMHANSL/O Park and in KEB L/Opark in BTM in ward 64 |
50 |
058-08-M-G-H-P-MN-006 |
|
REPIRS TO BORE WELL IN 8 THBLOCK JAYANAGARA PARK |
51 |
056-08-M-G-HP-MN-003 |
|
REPAIRS TO BORE WELL S AND OTHER INSTALLANTIONS IN DVGPARK |
52 |
054-09-N-G-E-R-AS-004 |
|
Aspahlting to Nehru road from 50 fet road to Girinagar II block Ch 0.00 to 500.00 m |
53 |
054-09-N-G-E-R-AS-003 |
|
Aspahlting to 80 feet road from 19th main road girinagar upto 14th cross road ( left side €“ 10m wide) Ch. 0.00 to 900.00 |
54 |
054-09-N-G-E-R-AS-002 |
|
Aspahlting to 80 feet road from 19th main road girinagar upto 14th cross road ( right side €“ 10m wide) Ch. 0.00 to 900.00 |
55 |
054-08-M-G-H-P-MN-002 |
|
REPAIRS OF BORE WELL . FOUNTAIN/PLAY EQUIPMENTS |
56 |
054-08-M-G-H-P-MN-001 |
|
REAPIRS TO BORE WELL AND ELCTRICAL FOUNTAIN FALLS AND PALY EQUIPMENTS IN ROCK GARDENS |
57 |
053-09-N-G-E-R-AS-005 |
|
Aspahlting to 10th main road from 80 feet road to Maruti circle Ch 0.00 to 600.00 m |
58 |
053-09-N-G-E-R-AS-004 |
|
Aspahlting to 22nd main road BSK 1st stge 2nd block from 80 feet to 50 feet road Ch.0.00 to 300.00 |
59 |
053-09-N-G-E-R-AS-003 |
|
Aspahlting to Ramanjaneya road from pipeline road to 13th main road Srinagar Ch 0.0 to 400.00 |
60 |
053-09-N-G-E-R-AS-002 |
|
Aspahlting to 50 feet road from PES college junction to Avalahalli BDA park ( dead end road ) Ch 900.00 to 1650.00 |
61 |
053-09-N-G-E-R-AS-001 |
|
Aspahlting to 50 feet road from PES college junction to Avalahalli BDA park ( dead end road ) Ch 0.00 to 900.00 |
62 |
052-09-N-G-E-R-AS-006 |
|
Aspahlting to Narayanaswamy circle to weavers colony dead end via Lakshmipura Vrindavana nagara and weavers colony Ch 1000 to 1300 m |
63 |
052-09-N-G-E-R-AS-005 |
|
Aspahlting to Narayanswamy circle to weavrs colony dead end via Lakshmipura Brindavannagar and Weavers colony Ch. 0.00 to 1000m |
64 |
052-09-N-G-E-R-AS-004 |
|
Aspahlting to Ramnjaneya main road from 3rd main road to Pipe line road Ch.0.00 to 750.00 |
65 |
052-09-N-G-E-R-AS-003 |
|
Aspahlting to 3rd main road from 50 feet road to Narayanaswamy circle Ch.0.00 to 600.00 |
66 |
052-09-N-G-E-R-AS-002 |
|
Aspahlting to Shivarama Karantha road from Maruthi h.0.00 to 650.00 |
67 |
051-09-N-G-E-R-AS-003 |
|
Aspahlting to Vidyapeetha Circle to C.T.Bed road Ch.0.00 to 750.00 |
68 |
051-09-N-G-E-R-AS-002 |
|
Aspahlting to Gangamma Gudi road Ch.0.00 to 500.00 |
69 |
051-09-N-G-E-R-AS-001 |
|
Aspahlting to South end road from Nagasandra circle to K.R.road Ch. 0.00 to 225 ( at Traffic Signal) |
70 |
042-09-M-G-E-R-AS-002 |
|
Rehabilitation and Strengthening of Nagarabhavi Road Govindarajnagara from 8th Cross MC Layout to Prashanthnagara Circle. Ch. 0 to 1.225 Km. |
71 |
041-09-N-G-E-R-CD-003 |
|
Name of the Work : Rehabilitation and strengthening of Deepanjali Nagara Main Road |
72 |
041-09-N-G-E-R-CD-002 |
|
Rehabilitation & strengthening of 3rd cross Timber Yard layout. |
73 |
041-09-N-G-E-R-CD-001 |
|
Rehabilitation & strengthening of 1st cross Timber Yard layout. |
74 |
041-05-N-H-P-R-FO-001 |
|
Construction Bridge road /junction improvement work near Gali anjaneya temple mysore road Bangalore. |
75 |
032-09-N-G-E-R-CD-001 |
|
Rehabilitation & strengthening of Kaddapaswamy Matta Road from K.P.Agrahara Railway station to Chaluvappa Garden & 5th main road Bhuvaneswari Nagara. |
76 |
021-09-N-G-E-R-CD-021 |
|
Rehabilitation & strengthening of road from Chandra layout circle to Gangondanahalli main road via Arundathingara Ch: 0 to 0.825Km. |
77 |
021-09-N-G-E-R-CD-020 |
|
Rehabilitation & strengthening of road from 80ft road Chandra layout to ring road via Vidyagiri layout Ch: 0 to 0.725Km |
78 |
021-09-N-G-E-R-CD-019 |
|
Rehabilitation & strengthening of road from Gangondanahalli 4th cross to Siddaganga school Ch: 0 to 0.675Km |
79 |
021-09-N-G-E-R-CD-018 |
|
Rehabilitation & strengthening of road from Railway gate to outer ring road via Nayindahalli Vinayaka layout Ch:0 to 1.95km. |
80 |
021-09-N-G-E-R-CD-017 |
|
Rehabilitation & strengthening of road from Outer ring road to 80ft Chandra layout road via Siddaganga school & Old Police station road Ch: 0 to 1.00Km |
81 |
021-09-N-G-E-R-CD-016 |
|
Rehabilitation & strengthening of road from Mysore road to via Gangondanahalli to Chandra Layout main road Ch: 0.81 to 1.65Km |
82 |
021-09-N-G-E-R-CD-015 |
|
Rehabilitation & strengthening of road from Mysore road to via Gangondanahalli to Chandra Layout main road Ch: 0.0 to 0.81 Km |
83 |
021-09-N-G-E-R-CD-014 |
|
Rehabilitation & strengthening of road from Nagarabhavi circle to Vrushabhavathi valley via Oxford school & Teachers layout Ch: 0 to 1.165Km |
84 |
021-09-N-G-E-R-CD-013 |
|
Rehabilitation and Strengthening of Road from Chandra layout Circle to Nagarabavi Circle Ch: 0.75 to 1.4 Km |
85 |
021-09-N-G-E-R-CD-011 |
|
Rehabilitation and Strengthening of 1st Main road Govindarajnagara from MC Layout to magadi Main Road Ch. 0 to 0.45 Km |
86 |
021-09-N-G-E-R-CD-010 |
|
Rehabilitation & strengthening of Nagarabhavi main road Govindaraj Nagara form 8th cross MC layout to Prashanth nagara circle Ch: 1.225 to 1.475Km. |
87 |
021-09-N-G-E-R-CD-009 |
|
rehabailitation and strenthening of Nagrabhavi main road Govindaraj nagara from 8th cross MC layout to Prashanthnagar circle Ch:0 to 1.225KM |
88 |
021-09-N-G-E-R-CD-008 |
|
Rehabilitation and Strengthening of Road from Chord Road (from Bunts Sangha Community hall ) to Chandra Layout Circle. Ch. 0.95 to 1.575 Km |
89 |
021-09-N-G-E-R-CD-007 |
|
Rehabilitation and Strengthening of Road from chord road to Chandra Layout Circle. Ch: 0.00to 0.95km |
90 |
021-09-N-G-E-R-CD-006 |
|
Rehabilitation and Strengthening of 1st .2nd .3rd &4th Main roads . and 4th Cross Road b/w 3rd & 4th Main road Industrial Estate. |
91 |
021-09-N-G-E-R-CD-005 |
|
"Rehabilitation and Strengthening of 1st 2nd 3rd 5th &6th cross roads Industrial Estate Rajajinagar. " |
92 |
021-09-N-G-E-R-CD-004 |
|
Rehabilitation and Strengthening of 4th main road. 4th & 5th cross road .Industrial Town. Rajajinagar. |
93 |
021-09-N-G-E-R-CD-003 |
|
"Rehabilitation and Strengthening of 3nd main road 4th cross road Industrial TownRajajinagar. " |
94 |
021-09-N-G-E-R-CD-002 |
|
Rehabilitation and Strengthening of 2nd main road. 1st &2nd cross road .Industrial Town. Rajajinagar. |
95 |
021-09-N-G-E-R-CD-001 |
|
" Rehabilitation and Strengthening of 1st main road and 7th cross road Industrial Town Rajajinagar. " |
96 |
00008IJIRSV002 |
|
Preparation of JNNURM Compliant DPR for High Quality upgraded road network in New zones in BBMP area Package-II Mahadevapura Zone |
97 |
000/10/N/P/J/R/MI/009 |
|
Providing Scientific Road Humps High Raised Pedestrian crossing and Medians in Sahakaranagar of Yelahanka Junction. |
98 |
000/10/N/P/J/R/MI/008 |
|
Providing High Raised Pedestrian Crossing in North and Central Traffic Sub Division. |
99 |
000/10/N/P/J/R/MI/007 |
|
Removal of Unscientific Humps and Providing scientific Road Humps in North and Central Traffic Sub-Division. |
100 |
000/10/N/P/J/R/MI/006 |
|
Providing High Raised Pedestrian Crossing in North East Traffic Sub- Division |
101 |
000/10/N/P/J/R/MI/005 |
|
Removal of unscientific Road and providing scientific Humps in North East Traffic Sub-Division. |
102 |
000/10/N/P/J/R/MI/004 |
|
Removal of unscientific Humps & Providing Scientific Road Humps in South-Traffic Sub-Division. |
103 |
000/10/N/P/J/R/MI/003 |
|
Providing High Raised Pedestrian Crossing in EAST & Audugodi Traffic Sub-Division. |
104 |
000/10/N/P/J/R/MI/002 |
|
Removal of unscientific Road Humps and providing scientific Humps as per standards in EAST and Audugodi Traffic Sub-Division Limited. |
105 |
000/10/N/P/J/R/MI/001 |
|
Construction of High Raised Pedestrian Crossing in Yeshwanthpur & Yelahanka Road |
106 |
000/10/N/P/J/R/CD/005 |
|
Comprehensive development to Uttarahally main road towards Nirmalagiri Metarnity Hospital Road |
107 |
000/10/N/P/J/R/CD/004 |
|
Comprehensive development to Uttarahally main road Uttarahally main road junction towards 11th cross Banashankari 6th stage |
108 |
000/10/N/P/J/R/CD/003 |
|
Comprehensive development to Uttarahally main road From Uttarahally main road junction towards BGS hospital |
109 |
000/10/N/P/J/R/CD/002 |
|
Comprehensive development to Uttarahally main road From Uttarahally main road junction towards BEML 3rd main road |
110 |
000/10/N/P/J/R/CD/001 |
|
Comprehensive development to Uttarahally main road From Savandharbar Ashrama uptoJ.S.S College |
111 |
000/10/N/P/J/O/MI/001 |
|
Providing Road Furnitures to Sheshadri Road and K R Circle Surrounding Area. |
112 |
000/10/N/P/J/O/IM/001 |
|
Providing U-Turn Infront of HMT Bhavan near Mekhri Circle |
113 |
000/10/M/P/J/R/MI/002 |
|
Painting work in Sadashivanagar Area |
114 |
000/10/M/P/J/R/MI/001 |
|
Painting work in Malleshwaram Area |
115 |
000/09/N/G/J/T/IM/051 |
|
Improvements to Junction at O Form Junction OM Road NGEF Junction. |
116 |
000/09/N/G/J/T/IM/050 |
|
Improvements to Junction at Uma Theatre Junction Briyand Square Junction. |
117 |
000/09/N/G/J/T/IM/049 |
|
Improvements to Junction at Ulsoor Gate Police Station Nagasandra Circle Yediyur Circle Sanjay Gandhi Hospital Junction (Carmel Convent). |
118 |
000/09/N/G/J/T/IM/048 |
|
Improvements to Junction at East End Road - 45th Cross Road Junction Anepalya Laskar Road Junction Minerva Circle N. R. Square. |
119 |
000/09/N/G/J/T/IM/047 |
|
Improvements to Junction at KH Road - Siddiah Road Junction Mission Road Lalbagh Road Junction Hosur Road - Siddhapura Road Junction BMC Junction. |
120 |
000/09/N/G/J/T/IM/046 |
|
Improvements to Junction at In front of RBI Nrupatunga Road Kodlu Gate Junction Basavangudi Krishna Rao Junction Meenakshi Temple Junction. |
121 |
000/09/N/G/J/T/IM/045 |
|
Improvements to Junction at BTS Junction Wilson Garden 1st Cross- Sagar Apollo Junction Avenue Road Near Post Office. |
122 |
000/09/N/G/J/T/IM/044 |
|
Improvements to Junction at 12th Cross Junction Wilson Garden Vidyapeeta Circle Junction Dr. Ambedkar Junction K H Junction. |
123 |
000/09/N/G/J/T/IM/043 |
|
Improvements to Junction at 28th Main Jayanagar 29th BTM Road Junction 18th Main Marenahalli Petrol Bunk 10th Cross Junction Wilson Garden. |
124 |
000/09/N/G/J/T/IM/042 |
|
Improvements to Junction at Kanakapur Road Konankunte Junction Shivashankarappa CircleArakere GateHulimavu Junction. |
125 |
000/09/N/G/J/T/IM/041 |
|
Improvements to Junction at Poornima Junction RRMR Junction Ramakrishna Ashram Junction Banashankari Ring Road NCERT Junction. |
126 |
000/09/N/G/J/T/IM/040 |
|
Improvements to Junction at K R Road & B P Wadia Road Junction Vani Vilas Road & Shankarmutt Road Junction K R Road Junction SJP Road Junction. |
127 |
000/09/N/G/J/T/IM/039 |
|
Improvements to Junction at J P Nagar 24th Main-9th Cross Junction Puttanna Junction K R Road & Bharathi Nursing Home Junction K R Road & D M Road Junction. |
128 |
000/09/N/G/J/T/IM/038 |
|
Improvements to Junction at Sagar Theatre JunctionNagarbavi Circle 5th Main Road - Chord Road Junction. |
129 |
000/09/N/G/J/T/IM/037 |
|
Improvements to Junction at Veeresh Talkies Junction Dr. Raj Kumar Road 17th Cross Junction Kempegowda Circle Krishnanada Nagar Circle. |
130 |
000/09/N/G/J/T/IM/036 |
|
Improvements to Junction at Rajajinagar 12th Main & 41st Cross JunctionMahalakshmi Layout 12th Cross Panchamukhi Ganapathi Junction Binny Mill Junction ASR Char Street - Mysore Road Junction . |
131 |
000/09/N/G/J/T/IM/035 |
|
Improvements to Junction at Dr. Raj Kumar Road Rajarajeshwari Kalyana Mantapa Junction Dr. Raj Kumar Stone Bridge Junction Rajajinagar 12th Main & 50 Cross Junction Rajajinagar 12th Main & 50 Cross Junction. |
132 |
000/09/N/G/J/T/IM/034 |
|
Improvements to Junction at B B Road Bagalur Cross B B Road NES Junction Sheshadripuram College Junction Dr. TCM Royan Road Mill Road Junction. |
133 |
000/09/N/G/J/T/IM/033 |
|
Improvements to Junction at B B Road Amruthahalli Cross Junction B B Road Allasandra Byepass Junction B B Road Santhe Circle B B Road Kogilu Cross Junction. |
134 |
000/09/N/G/J/T/IM/032 |
|
Improvements to Junction at Dr. Raj Kumar Road 10th Cross Junction Dr. Raj Kumar Road Navarang Bar Dr. Raj Kumar Road near Mani Complex B B Road Kempapur Cross Junction. |
135 |
000/09/N/G/J/T/IM/031 |
|
Improvements to Junction at Satellite Terminal Junction ESI Junction B. B. Road Binny Mill Junction B B Road Kodigehalli Cross Junction. |
136 |
000/09/N/G/J/T/IM/030 |
|
Improvements to Junction at Peenya 2nd Stage Bus standYamalur Junction Mysore Road near KSRTC Bus Stand Old Police Station Junction. |
137 |
000/09/N/G/J/T/IM/029 |
|
Improvements to Junction at Swastik Junction Maramma Temple Junction Maruthi Circle Vilnayaka Circle. |
138 |
000/09/N/G/J/T/IM/028 |
|
Improvements to Junction at Tumkur Road Marappana Palya Junction 5th Main RPC Layout Junction Modi Hospital Junction Dr. Raj Kumar Road and Chord Road junction. |
139 |
000/09/N/G/J/T/IM/027 |
|
Improvements to Junction at Ring Road BDA JunctionBasavamantapa Junction Dt. TCM Royan Road near Ambedkar Statue Peenya 2nd Stage 14th Cross Junction. |
140 |
000/09/N/G/J/T/IM/026 |
|
Improvements to Junction at 14th Main Chandra Layout Junction Chandra Layout near Water Tank Junction Sunkadakatte - Hegganahalli Junction Ring Road Ullal Junction. |
141 |
000/09/N/G/J/T/IM/025 |
|
Improvements to Junction at Maharani College Circle CID & COD Junction Basweshwara Circle Sheshadri Road & BVK Iyengar Road Junction |
142 |
000/09/N/G/J/T/IM/024 |
|
Improvements to Junction at Palace Cross Junction Sampige Theatre Junction Malleshwaram Link Road Junction Karnataka Circle |
143 |
000/09/N/G/J/T/IM/023 |
|
Improvements to Junction at Jalahalli Cross Junction TVS Cros Junction Tata Circle Highground Junction. |
144 |
000/09/N/G/J/T/IM/022 |
|
Improvements to Junction at Chandrika Junction Chandni Chowka Guttahalli Circle Hanes Junction. |
145 |
000/09/N/G/J/T/IM/021 |
|
Improvements to Junction at GPO Junction Coffee Board Junction Indian Express Junction Minsk Square. |
146 |
000/09/N/G/J/T/IM/020 |
|
Improvements to Junction at Near Cottonpet Police Station Janathadal Junction RT Nagar Main Road-Taralabalu Junction New BEL Road Devasandra Junction . |
147 |
000/09/N/G/J/T/IM/019 |
|
Improvements to Junction at Kammanahalli Junction Ulasappa Circle Sivananda Circle. |
148 |
000/09/N/G/J/T/IM/018 |
|
Improvements to Junction at Mico Bande Junction Canara Bank Junction Tumkur Road RMC "U" Turn Cottonpet Road - Mill Road Junction . |
149 |
000/09/N/G/J/T/IM/017 |
|
Improvements to Junction at 18th Main Junction - Siddiah Puranik Road Basaveshwaranagar- Rajeevgandhi Circle Abhinaya Junction Shankaranagar Mian Road APMC Yard Junction. |
150 |
000/09/N/G/J/T/IM/016 |
|
Improvements to Junction at Rajajinagar 17th Main & 41st Cross Junction MKK Road MD Block Junction Hesarughatta Road Bagalugunte Cross Devasandra Cross. |
151 |
000/09/N/G/J/T/IM/015 |
|
Improvements to Junction at RT Nagar Police Station Junction Jayamahal Road Jayamahal Circle Margosa Road 18th Cross Junction Sampige Road Mill Corner Junction . |
152 |
000/09/N/G/J/T/IM/014 |
|
Improvements to Junction at BDA Junction 8th Main- 7th Cross Junction Rajajinagar Basham Circle Subedar Chatram Road - Near Sheshadripuram Police Station. |
153 |
000/09/N/G/J/T/IM/013 |
|
Improvements to Junction at Forum Junction 80 Feet Road & Memoor Masjid Junction Maharaja Junction Aishwarya Junction - on Sarjapur Road. |
154 |
000/09/N/G/J/T/IM/012 |
|
Improvements to Junction at OMR - Byappanahalli Junction CMH Road 100 feet Road Junction Sarjapur Road - 24th Main Road Junction CMH Road 80 Feet Road Junction. |
155 |
000/09/N/G/J/T/IM/011 |
|
Improvements to Junction at Mayo Hall junction Halsur Bus Depo Junction Hosur Road Campbell Road Junction Lower Agram-Ejipura Junction. |
156 |
000/09/N/G/J/T/IM/010 |
|
Improvements to Junction at Giriyabhovi Palya Junction SD Road and JB Nagar Junction SD Road Michelpalya & CV Raman Nagar Junction Vishweshwaraiah College Junction. |
157 |
000/09/N/G/J/T/IM/009 |
|
Improvements to Junction at OM Road SG Palya Junction Outer Ring Road near Multiplex Theatre Junction Outer Ring Road near Kadu Beesana Halli Junction. |
158 |
000/09/N/G/J/T/IM/008 |
|
Improvements to Junction at Main Guard Cross Road & Cubbon Road Junction Electronic City 1 & 2 Gate Junction OM Road BMTC Depot Circle OM Road Benniganahally Junction. |
159 |
000/09/N/G/J/T/IM/007 |
|
Improvements to Junction at Anjaneya Temple - SV Road Junction Old Madras Road - 80 Feet Road Junction Old Madras Road - NGEF Junction Kasturinagar Junction. |
160 |
000/09/N/G/J/T/IM/006 |
|
Improvements to Junction at Nanjappa circle Anepalya Junciton Garuda Mahal Juntion CB Road Airport Junction. |
161 |
000/09/N/G/J/T/IM/005 |
|
Improvements to Junction at Adarsha Junction Halsuru Road & Dickenson Road Junction Thamari Kannan & Murthy Road Junction Cambel RoadJunction. |
162 |
000/09/N/G/J/T/IM/004 |
|
Improvements to Junction at Sindhi Colony Junction Devraj Urs Truck Terminal Junction NTTF Junction Sukh Sagar Junction |
163 |
000/09/N/G/J/T/IM/003 |
|
Improvements to Junction at Indiranagar ESI Hospital junctionBamboo Bazaar Circle St. Johns church road war memorial circleMosque Road - MM Road Junction. |
164 |
000/09/N/G/J/T/IM/002 |
|
Improvements to Junction at Mother theresa junction Gopalgowda circleArts & crafts circle Begaum mahal junction. |
165 |
000/09/N/G/J/T/IM/001 |
|
Improvements to Junction at Koramagala 1st block 7th main junction & 8.0 feet road in Kamal Bakery Junction / Wipro Park Domlur water tank junctionD'souza Circle Palmgrove Junction. |
166 |
000/09/N/G/J/R/MI/007 |
|
Estimate for Providing Road Humps (Speed Breakers) in Sadashivanagar Cubbon Park High Grounds Vidhana Soudha Shivajinagar K.R. Circle Area. |
167 |
000/09/N/G/J/R/MI/006 |
|
Estimate for Providing Road Humps (Speed Breakers) in Madiwala Mico Layout J.P.Nagar Bannerghatta Koramangala Audugodi Ashoknagara Area. |
168 |
000/09/N/G/J/R/MI/005 |
|
Estimate for Providing Road Humps (Speed Breakers) in Vijaynagar Mysore Road Bapujinagar J.J.Nagar Magadi Road Byatarayanpura Kamakshipalya Chamarajpet Area. |
169 |
000/09/N/G/J/R/MI/004 |
|
Estimate for Providing Road Humps (Speed Breakers) in Upparpet Chickpet Majestic City Market Vidhana Soudha Sheshadripuram Area. |
170 |
000/09/N/G/J/R/MI/003 |
|
Estimate for Providing Road Humps (Speed Breakers) in Indiranagar Banaswadi Frazer Town HAL Shivajinagar K.R.Puram Ulsoor Area. |
171 |
000/09/N/G/J/R/MI/002 |
|
Estimate for Providing Road Humps (Speed Breakers) in Malleshwaram Hebbal R.T.Nagar Yelahanka Rajajinagar Yeshvanthpur Peenya Area. |
172 |
000/09/N/G/J/R/MI/001 |
|
Estimate for Providing Road Humps (Speed Breakers) in Jayanagar Banashankari Chamarajpet Basavangudi & Kumarswamy Layout J.P.nagar Area. |
173 |
000/09/N/G/J/R/MD/068 |
|
Constructing High Raised pedestrian Crossing in Nagavara Kalyannagar Kodigehalli Kempapura Area. |
174 |
000/09/N/G/J/R/MD/067 |
|
Constructing High Raised pedestrian Crossing in Nayandahalli Jnanabharathi Kengeri Area. |
175 |
000/09/N/G/J/R/MD/066 |
|
Constructing High Raised pedestrian Crossing in J.P.Nagar Konankunte Uttarahalli Katriguppe Area. |
176 |
000/09/N/G/J/R/MD/065 |
|
Constructing High Raised pedestrian Crossing in H.A.L Defence Colony Marathhalli JeevanBhimanagar RamamurthynagarC.V. Raman Nagar Area. |
177 |
000/09/N/G/J/R/MD/064 |
|
Constructing High Raised pedestrian Crossing in New B.E.L Colony Basaveshvarnagar J.P.Park Vidhyaranyapura Area. |
178 |
000/09/N/G/J/R/MD/063 |
|
Constructing High Raised pedestrian Crossing in Sadashivnagar Museum Road Sheshadri Puram Contonment Railway Station Area. |
179 |
000/09/N/G/J/R/MD/062 |
|
Constructing High Raised pedestrian Crossing in Arakere Layout Mico Layout Bannerghatta Road Area. |
180 |
000/09/N/G/J/R/MD/061 |
|
Constructing High Raised pedestrian Crossing in Madiwala Adugodi Area. |
181 |
000/09/N/G/J/R/MD/060a |
|
Constructing High Raised pedestrian Crossing in Madiwala Adugodi Area. |
182 |
000/09/N/G/J/R/MD/060 |
|
Constructing High Raised pedestrian Crossing in Byatarayanpur Bapujinagar Kamakshipalya Nagarbavi Area. |
183 |
000/09/N/G/J/R/MD/059b |
|
Constructing High Raised pedestrian Crossing in Byatarayanpur Bapujinagar Kamakshipalya Nagarbavi Area. |
184 |
000/09/N/G/J/R/MD/059 |
|
Constructing High Raised pedestrian Crossing in Upparpet Chickpet City Market Area. |
185 |
000/09/N/G/J/R/MD/058 |
|
Constructing High Raised pedestrian Crossing in Shivajinagar K.R.Puram Halsur Area. |
186 |
000/09/N/G/J/R/MD/057 |
|
Constructing High Raised pedestrian Crossing in Indiranagar Frazer Town Banaswadi Area. |
187 |
000/09/N/G/J/R/MD/056 |
|
Constructing High Raised pedestrian Crossing in Yeshvanthpur & Peenya Area. |
188 |
000/09/N/G/J/R/MD/055 |
|
Constructing High Raised pedestrian Crossing in J.J.Nagar Mysore Road Vijaynagar |
189 |
000/09/N/G/J/R/MD/054 |
|
Constructing High Raised pedestrian Crossing in Rajajinagar Magadi Road Area. |
190 |
000/09/N/G/J/R/MD/053 |
|
Constructing High Raised pedestrian Crossing in Sanjaynagar Anandanagar Yelahanka |
191 |
000/09/N/G/J/R/MD/052 |
|
Constructing High Raised pedestrian Crossing in Malleshwaram Hebbal R.T Nagar |
192 |
000/09/N/G/J/R/MD/051 |
|
Constructing High Raised pedestrian Crossing in Banashankari Ashoknagar Tilaknagar J.P.Nagar. |
193 |
000/09/N/G/J/R/MD/050 |
|
Constructing High Raised pedestrian Crossing in Banashankari Area. |
194 |
000/09/N/G/J/R/MD/049 |
|
Constructing High Raised pedestrian Crossing in Jayanagar Kumaraswamy Lay-out Banashankari Area. |
195 |
000/09/N/G/J/R/MD/048 |
|
Constructing High Raised pedestrian Crossing in Jayanagar Area. |
196 |
000/09/N/G/J/R/MD/047 |
|
Constructing High Raised pedestrian Crossing in Chamarajpet & Basavangudi Area. |
197 |
000/09/N/G/J/R/MD/046 |
|
Estimate for providing Cast-in-situ RCC medians near Flat Form Road Krishna Floor Mill Road etc. |
198 |
000/09/N/G/J/R/MD/045 |
|
Estimate for providing Cast-in-situ RCC medians near Coffee Day Junction Lavelle Road Museum Road & St. Marks Road. |
199 |
000/09/N/G/J/R/MD/044 |
|
Estimate for providing Cast-in-situ RCC medians near Coffee Day Junction Lavelle Road Museum Road & St. Marks Road. |
200 |
000/09/N/G/J/R/MD/043 |
|
Estimate for providing Cast-in-situ RCC medians in Macgrath Road Victoria Road Lower Agaram road & surrounding Area. |
201 |
000/09/N/G/J/R/MD/042 |
|
Estimate for providing Cast-in-situ RCC medians in Agara Main road upto 100 feet ring road & surrounding area. |
202 |
000/09/N/G/J/R/MD/041 |
|
Estimate for providing Cast-in-situ RCC medians opposite to NIMHANS. |
203 |
000/09/N/G/J/R/MD/040 |
|
Estimate for providing Cast-in-situ RCC medians in Bannerghatta & Surrounding Area. |
204 |
000/09/N/G/J/R/MD/039 |
|
Estimate for providing Cast-in-situ RCC medians in Swagath Main Road |
205 |
000/09/N/G/J/R/MD/038 |
|
Estimate for providing Cast-in-situ RCC medians near Dr.Marigowda Road & Surrounding Area (Near Forum) |
206 |
000/09/N/G/J/R/MD/037 |
|
Estimate for providing Cast-in-situ RCC medians near Dr.Marigowda Road & Surrounding Area (near Madiwala Checkpost) |
207 |
000/09/N/G/J/R/MD/036 |
|
Estimate for providing Cast-in-situ RCC medians near HSR Lay-out & BTM 100 ft Ring Road Area. |
208 |
000/09/N/G/J/R/MD/035 |
|
Estimate for providing Cast-in-situ RCC medians from Ring road junction to KSRTC Rural Depot. |
209 |
000/09/N/G/J/R/MD/034 |
|
Estimate for providing Cast-in-situ RCC medians from Indian Oil petrol bunk ( Rajeshwari marbles) to ring road junction |
210 |
000/09/N/G/J/R/MD/033 |
|
Estimate for providing Cast-in-situ RCC medians in Mysore Road near RR General Hospital & HosaguddadahalliArea. |
211 |
000/09/N/G/J/R/MD/032 |
|
Estimate for providing Cast-in-situ RCC medians in Chandra Layout & Mysore Road Area. |
212 |
000/09/N/G/J/R/MD/031 |
|
Estimate for providing Cast-in-situ RCC medians in Vijayanagar & Surrounding Area |
213 |
000/09/N/G/J/R/MD/030 |
|
Estimate for providing Cast-in-situ RCC medians near Upparpet & Surrounding Area |
214 |
000/09/N/G/J/R/MD/029 |
|
Estimate for providing Cast-in-situ RCC medians in Old Madras Road & Ulsoor Surrounding Area. |
215 |
000/09/N/G/J/R/MD/028 |
|
Estimate for providing Cast-in-situ RCC medians in Mahadevapura Ring Road & near K.R.Puram Bridge |
216 |
000/09/N/G/J/R/MD/027 |
|
Estimate for providing Cast-in-situ RCC medians in Swami Vivekananda Road & surrounding area. |
217 |
000/09/N/G/J/R/MD/026 |
|
Estimate for providing Cast-in-situ RCC medians in St. Johns Church Road & Cubbon Road. |
218 |
000/09/N/G/J/R/MD/025 |
|
Estimate for providing Cast-in-situ RCC medians in Banaswadi Main Road. |
219 |
000/09/N/G/J/R/MD/024 |
|
Estimate for providing Cast-in-situ RCC medians in Hennur Road & Banaswadi Road. |
220 |
000/09/N/G/J/R/MD/023 |
|
Estimate for providing Cast-in-situ RCC medians in Nagavara Road . |
221 |
000/09/N/G/J/R/MD/022 |
|
Estimate for providing Cast-in-situ RCC medians in Kalyan Nagar 80 ft Road & Banaswadi 100 ft Road. |
222 |
000/09/N/G/J/R/MD/021 |
|
Estimate for providing Cast-in-situ RCC medians in Frazer Town & surrounding Area |
223 |
000/09/N/G/J/R/MD/020 |
|
Estimate for providing Cast-in-situ RCC medians in Indiranagar Area. |
224 |
000/09/N/G/J/R/MD/019 |
|
Estimate for providing Cast-in-situ RCC medians in Old Airport (HAL) Area. |
225 |
000/09/N/G/J/R/MD/018 |
|
Estimate for providing Cast-in-situ RCC medians in Peenya Police Station Limits. |
226 |
000/09/N/G/J/R/MD/017 |
|
Estimate for providing Cast-in-situ RCC medians in Tumkur Road in BBMP Limits. |
227 |
000/09/N/G/J/R/MD/016 |
|
Estimate for providing Cast-in-situ RCC medians in Dr.Rajkumar Road & M E S Ring Road. |
228 |
000/09/N/G/J/R/MD/015 |
|
Estimate for providing Cast-in-situ RCC medians in Yelahanka Traffic Police Station Limits |
229 |
000/09/N/G/J/R/MD/014 |
|
Estimate for providing Cast-in-situ RCC medians in BEL RoadJayamahal Road. |
230 |
000/09/N/G/J/R/MD/013 |
|
Estimate for providing Cast-in-situ RCC medians in Vidyaranyapura & Ring Road. |
231 |
000/09/N/G/J/R/MD/012 |
|
Estimate for providing Cast-in-situ RCC medians in West of Chord Road & surrounding area. |
232 |
000/09/N/G/J/R/MD/011 |
|
Estimate for providing Cast-in-situ RCC medians in Malleshwaram & Hebbal Area. |
233 |
000/09/N/G/J/R/MD/010 |
|
Estimate for providing Cast-in-situRCC median of 0.5 mtr. Height in Girinagar and Jayanagar Area |
234 |
000/09/N/G/J/R/MD/009 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Banasankari temple to Hunnasemara junction Area |
235 |
000/09/N/G/J/R/MD/008 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Near Yelechanahalli. |
236 |
000/09/N/G/J/R/MD/007 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Konanakunte Uttarahalli Main Road and Rajalakshmi Kalyanamantapa Road |
237 |
000/09/N/G/J/R/MD/006 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Kanakapura Main Road from Ring Road. |
238 |
000/09/N/G/J/R/MD/005 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in J.P.nagar area |
239 |
000/09/N/G/J/R/MD/004 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Jayanagar area |
240 |
000/09/N/G/J/R/MD/003 |
|
Estimate for providing Cast-in-situ RCC median 0.5 mtr. Height in Kanakapura Road M.N.Rao Park RoadJayanagar 11th Main etc. |
241 |
000/09/N/G/J/R/MD/002 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Chamrajpet 5th Main & N.R.Colony Main Road etc.. |
242 |
000/09/N/G/J/R/MD/001 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Mysore Road & South End Road. |
243 |
000/09/N/G/J/H/MI/006 |
|
Providing Surface Parking in Audugodi Koramangala Madiwala Area. |
244 |
000/09/N/G/J/H/MI/005 |
|
Providing Surface Parking in High Grounds R.T.Nagar Area. |
245 |
000/09/N/G/J/H/MI/004 |
|
Providing Surface Parking in Jayanagar Banashankari J.P.Nagar Area. |
246 |
000/09/N/G/J/H/MI/003 |
|
Providing Surface Parking in Malleshwaram Hebbal Yelahanka Area. |
247 |
000/09/N/G/J/H/MI/002 |
|
Providing Surface Parking in Upparpet Rajajinagar Magadi road Kamakshipalya Area. |
248 |
000/09/N/G/J/H/MI/001 |
|
Providing Surface Parking in Indiranagar Banaswadi Kalyannagar Area. |
249 |
000/08/N/G/J/R/MI/003 |
|
Providing Road Humps (Speed Breakers) in SOUTH ZONE limits |
250 |
000/08/N/G/J/R/MI/002 |
|
Providing Road Humps (Speed Breakers) in WEST ZONE limits |
251 |
000/08/N/G/J/R/MI/001 |
|
Providing Road Humps (Speed Breakers) in EAST ZONE limits |
252 |
000/08/N/G/J/R/BB/025 |
|
Construction of Bus Bays at BTM water Tank HSR BDA Complex Rajarajeshwari arch towards extention Bangalore University gate towards extention. |
253 |
000/08/N/G/J/R/BB/024 |
|
Construction of Bus Bays at Lalbagh Main gate towards double road Nimhans Hospital Kidwai Hospital Sanjayagandhi Hospital towards City. |
254 |
000/08/N/G/J/R/BB/023 |
|
Construction of Bus Bays at SJP College opposite DIG Office towards extention Harischandra ghat (Right Side) MKK road Junction Navarang bus stop. |
255 |
000/08/N/G/J/R/BB/022 |
|
Construction of Bus Bays at Maharani's College towards COD office Ganganagar bus stop towards Hebbal Ganga nagar Towards city Marthas Hospital towrds KBS. |
256 |
000/08/N/G/J/R/BB/021 |
|
Construction of Bus Bays at Jalahalli Cross Hosur Road towards extention CV Raman Road Tata Institute towards extention Agara towards Extention. |
257 |
000/08/N/G/J/R/BB/020 |
|
Construction of Bus Bays at Jyothi School towards City Agara towards Extention Agara towards City Iblur towards City |
258 |
000/08/N/G/J/R/BB/019 |
|
Construction of Bus Bays at Sarayipalya (Vidyanagara) towards City Hennur Cross towards Extention Hennur Cross towards City Jyothi School towards Extention. |
259 |
000/08/N/G/J/R/BB/018 |
|
Construction of Bus Bays at Marath Hally near Bridge Heggadenagar towards Extention Heggadenagar towards City Sarayipalya (Vidyanagara) towards Extention. |
260 |
000/08/N/G/J/R/BB/017 |
|
Construction of Bus Bays at Towards Extention Singaiana palya towards ITPL KR Puram Railway Station towards ITPL Marath Hally near Banyan Tree. |
261 |
000/08/N/G/J/R/BB/016 |
|
Construction of Bus Bays at Hope From towads ITPL L/S Hope From towads Whitefield R/S Satyasai Baba Hospital towards city Hoodi towards ITPL |
262 |
000/08/N/G/J/R/BB/015 |
|
Construction of Bus Bays at NH Flyover KR Puram towards IT PB Junction Hosakote towards city Hope Form towards Channasandra. |
263 |
000/08/N/G/J/R/BB/014 |
|
Construction of Bus Bays at Avalahalli towards Hosakote Avalahalli Towards city Boodigere cross towards Hosakote Boodigere cross Towards city. |
264 |
000/08/N/G/J/R/BB/013 |
|
Construction of Bus Bays at Tambuchetty palya Jn towards extention Opp. Side towards city Medahalli towards Hosakote Medahalli Towards city |
265 |
000/08/N/G/J/R/BB/012 |
|
Construction of Bus Bays at ITI Colony gate ( KR Puram) Opp. Towards bridge KR Puram bus stop KR Puram sante towards city. |
266 |
000/08/N/G/J/R/BB/011 |
|
Construction of Bus Bays at Roman Catholic Cemetery towards Shivaji Nagar BMTC 10th depot bus stop (Hennur) Bamboo bazaar Philips Bus stop towards extention. |
267 |
000/08/N/G/J/R/BB/010 |
|
Construction of Bus Bay at While going towards City KNS Technical College (Tirumanahalli) towards Extention KNS Technical College (Tirumanahalli) towards City Lalbagh West Gate towards Jayanagar |
268 |
000/08/N/G/J/R/BB/009 |
|
Construction of Bus Bay at Lalbagh Main gate towards double road Kengeri - Milesandra Gate Mysore Road Jayanagar 4th Main 22nd Cross Both Side While going towards J.P. Nagar. |
269 |
000/08/N/G/J/R/BB/008 |
|
Construction of Bus Bay at Opp. to K.C. General Hospital. (Malleshwaram) Rajaji Nagar - Around ESI Hospital - Existing Bus Stop near ESI (41st Cross) Service Road infront of RMC Yard - RMC Yard Bus Stop on NH4 Ballary Road near Veterinary Hospital. |
270 |
000/08/N/G/J/R/BB/007 |
|
Construction of Bus Bay at Shankar Matt Vivekananda Park Basaveshwara Nagar 8th Main near Aishwarya Bakery Basaveshwara Nagar West of Chord Road opp to Veeranjaneya Temple Chandra Layout near Petrol Bunk opp to Karthik Caps. |
271 |
000/08/N/G/J/R/BB/006 |
|
Construction of Bus Bay at Varthur Road east of Yamlur Road Junction both Left Side and Right Side Baldwin School towards City Frazer Town towards Extention Frazer Town towards City. |
272 |
000/08/N/G/J/R/BB/005 |
|
Construction of Bus Bay at Old Madras Road Bennigana Hally Ulsoor - Air Port road near Domalur (Right Side) Ulsoor - Air Port road near Domalur (Left Side) Varthur Road near HAL Police Station. |
273 |
000/08/N/G/J/R/BB/004 |
|
Construction of Bus Bay at Kachaarkanahally Banaswadi Road IOC Bus Stop Kammana hally road Kullapa Circle Ramamurthy Nagara Channasandra Railway Bridge |
274 |
000/08/N/G/J/R/BB/003 |
|
Construction of Bus Bay at Richmond Road bus stop Hosur Road - Near Jhonson Market Bus Stand Hosur Road - Anepalya Bus Stop Pottery Road behind East Railway Station |
275 |
000/08/N/G/J/R/BB/002 |
|
Construction of Bus Bay at Adugodi Govt. School Opp. Krishna Temple near Adugodi Opp. Adugodi Austin Town. |
276 |
000/08/N/G/J/R/BB/001 |
|
Construction of Bus Bay at 80' Road Indiranagar Kodihalli NGEF Bus Stop Benniganahalli (new bus stop) Opposite apartment compound wall towards city. |
277 |
000.-10-N-P-P-R-MI-007 |
|
Providing and fixing of MS Grills on compound wall from state semen center to soil science Musium at Bellary road |
278 |
000-N-P-R-E-WD-066 |
|
Dismantling of Compound wall and stables in the premesies of BTC from Subbanna circle to JDS office |
279 |
000-14-N-P-P-O-MI-050 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Lower Agaram road junction |
280 |
000-14-N-P-P-O-MI-049 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Kunddahalli Gate junction |
281 |
000-14-N-P-P-O-MI-048 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Namjoshi road junction |
282 |
000-14-N-P-P-O-MI-047 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Wind Tunnel road junction |
283 |
000-14-N-P-P-O-MI-046 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Suranjandas road junction |
284 |
000-14-N-P-P-O-MI-045 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-ASC junction |
285 |
000-14-N-P-P-O-MI-044 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Mother Terasa Circle junction |
286 |
000-14-N-P-P-O-MI-043 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Commando hospital junction |
287 |
000-14-N-P-P-O-MI-042 |
|
Consultancy Services for singal free corridor from Vellarajunction to white field-Hosmat hospital junction |
288 |
000-123-456 |
|
construction of rcc box drain at 6th main 4th cross in kaveri nagar ward no-16. |
289 |
000-10-P-R-AS-032 |
|
Rehabilitation and Strengthening of Mysore Road From Sirsi Circle to University Circle Ch 0.9 to1.8 km |
290 |
000-10-NPRE-UP-001 |
|
Providing asphalting to approaches to the underpass at Sanjayanagar junction |
291 |
000-10-NP-R-E-AS-025 |
|
Strengthening and Asphalting of 36th Cross road 4th Block Jayanagar |
292 |
000-10-NP-R-E-AS-023 |
|
Providing Asphalting to Strengthening & Asphalting of Aravind marg 11th Main Jayanagar Ch:0.00 to 900m |
293 |
000-10-NP-R-E-AS-021 |
|
Strengthening and Asphalting of Service road Parallel to R.V.Road Western side |
294 |
000-10-NP-R-E-AS-014 |
|
Providing Asphalting to Strengthening & Asphalting of 41st Cross Road (Tilak Nagar Block) Jayanagar. |
295 |
000-10-NP-R-E-AS-0 |
|
Providing Asphalting to Strengthening & Asphalting of 39th Cross Road (Tilak Nagar Block) Jayanagar. |
296 |
000-10-N-S-I-Z-UP-111 |
|
assff |
297 |
000-10-N-P-RE-CD-029 |
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 0.00 to 0.80 Km |
298 |
000-10-N-P-RE-AS-008 |
|
Rehabilitation and strengthening of 8th Main Road Basaveshvara Nagara Ch 0.00 km to 1.60 km |
299 |
000-10-N-P-RE-AS-007 |
|
Rehabilitation and strengthening of 3rd cross road Sanegoravanahalli Main Road Basaveshvara nagar Ch: 0.00 to 0.70 km |
300 |
000-10-N-P-RE-AS-006 |
|
Rehabilitation and strengthening of 12th main roaad 3rd block Rajajinagar from ESI Hospital road 6th block circle via Bhashyam circle ch: 0.0 km to 1.40km |
301 |
000-10-N-P-R-O-MI-010 |
|
Constuction of compound wall to the premises of Govt Properties / Public sector properties in Mysore Road from Sirsi Circle to ORR Reach No 2 RHS |
302 |
000-10-N-P-R-O-MI-008a |
|
Providing and fixing stainless steel Barricading to Nrupatunga road from K.R.Circle to Hudson Circle Chainage 0.00 to 900.00mtrs. |
303 |
000-10-N-P-R-O-MI-008 |
|
Providing and fixing stainless barricading to Nrupathunga road from K.R.Circle to Hudson Circle Ch: 0.00 to 900.00 |
304 |
000-10-N-P-R-O-MI-007a |
|
Providing and fixing Stainless Barricading to Palace road from Mysore bank circle Ch 0.00 to 1400.00m |
305 |
000-10-N-P-R-O-MI-007 |
|
Providing and fixing Stainless Barricading to Palace road from Mysore bank circle Ch: 0.00 to 1400.00m |
306 |
000-10-N-P-R-O-MI-006a |
|
Providing and fixing Stainless steel Barricading to Sheshadri Road from Freedom Park Junction to K.R.Circle ch 0.00 to 600.00m |
307 |
000-10-N-P-R-O-MI-006 |
|
Providing and fixing Stainless steel Barricading to Sheshadri Road from Freedom Park Junction to K.R.Circle ch:0.00 to 600.00m |
308 |
000-10-N-P-R-O-MI-005a |
|
Improvements to area around Sir.M.Vishweshwaraiah statue and front side of UVC Mechanical Block at K.R.Circle Bangalore |
309 |
000-10-N-P-R-O-MI-005 |
|
Improvements to area around Sir.M.Vishweshwaraiah statue and front side of UVC Mechanical Block at K.R.Circle Bangalore |
310 |
000-10-N-P-R-O-MI-003 |
|
Rehabilitation and Strengthening of Madivala Market Road from Sarjapura Main Road to Hosur Main Road Ch : 480m to 720m |
311 |
000-10-N-P-R-O-MI-002 |
|
Rehabilitation and Strengthening of Madivala Market Road from Sarjapura Main Road to Hosur Main Road Ch: 240m to 480m |
312 |
000-10-N-P-R-O-MI-001 |
|
Rehabilitation and Strengthening of Madivala Market Road from Sarjapura Main Road to Hosur Main Road Ch: 0 to 240m |
313 |
000-10-N-P-R-I-CD-001 |
|
Construction of Road Connecting SEZ (100feet wide Road) from Outer Ring Road ch:0.00 to 1.00km along Nagavara tank bund |
314 |
000-10-N-P-R-E-WP-074a |
|
Improvements to Mekhri Circle to Doordarshan Kendra (TV Tower) From Ch.0.00m to 920.00m on L/S of Jayamahal Road |
315 |
000-10-N-P-R-E-WP-074 |
|
Widening of Jayamahal Road (Mekhri circle to Doordhashan Kendra-Balance Work) |
316 |
000-10-N-P-R-E-WD-079 |
|
Widening Improvements and asphlting to Road from Sarjapura road at Doddakannenahanni to kadabisanahalli via GEAR college Devarabisanahalli from ch:3750 to 5000mts |
317 |
000-10-N-P-R-E-WD-078 |
|
Widening Improvements and asphlting to Road from Sarjapura road at Doddakannenahanni to kadabisanahalli via GEAR college Devarabisanahalli from ch:2500 to 3750mts |
318 |
000-10-N-P-R-E-WD-077 |
|
Widening Improvements and asphlting to Road from Sarjapura road at Doddakannenahanni to kadabisanahalli via GEAR college Devarabisanahalli from ch:1250 to 2500mts |
319 |
000-10-N-P-R-E-WD-076 |
|
Widening Improvements and asphlting to Road from Sarjapura road at Doddakannenahanni to kadabisanahalli via GEAR college Devarabisanahalli from ch:0 to 1250mts |
320 |
000-10-N-P-R-E-WD-075 |
|
Widening and Improvements to Ulsoor Road from Dickenson Road to Kensington Road |
321 |
000-10-N-P-R-E-WD-073 |
|
Widening of Kumarapark west road from Windsor manor bridge to Cresecent road cross |
322 |
000-10-N-P-R-E-WD-070 |
|
Widening and Improvements to Victoria Road from D'Souza Circle to Airport Road |
323 |
000-10-N-P-R-E-WD-069 |
|
widening and improvements to banasawadi road from ch:6.00km to 7.00 km in banglore city |
324 |
000-10-N-P-R-E-WD-068 |
|
Widening and Improvements to Banasawadi Road from Ch:5.00km to Ch:6.00km in Banglore city |
325 |
000-10-N-P-R-E-WD-067 |
|
Widening and Improvements to Banasawadi Road From Ch:4.00km to 5.00km in banglore city |
326 |
000-10-N-P-R-E-WD-066 |
|
Widening and Improvements to Banasawadi road from Ch: 3.00km to 4.00km in banglore city |
327 |
000-10-N-P-R-E-WD-064 |
|
Widening and Improvements to banasawadi road from Ch:1.00km to 2.00km in Banglore city |
328 |
000-10-N-P-R-E-WD-063 |
|
Widening and Improvements to Banasawadi road from Ch:0.00km to 1.00km in banglore city |
329 |
000-10-N-P-R-E-WD-062 |
|
Widening and Improvements to Mysore road From Ch:3.0 km to 3.7km in Bangalore city |
330 |
000-10-N-P-R-E-WD-061 |
|
Widening and Improvements to Mysore road From Ch:2.0 km to 3.0 km in Bangalore city |
331 |
000-10-N-P-R-E-WD-060 |
|
Widening and Improvements to Mysore road From Ch:1.0 km to 2.0 km in Bangalore city |
332 |
000-10-N-P-R-E-WD-059 |
|
Widening and Improvements to Mysore road From Ch:0.0 km to 1.0 km in Bangalore city |
333 |
000-10-N-P-R-E-WD-058 |
|
Widening and Improvements to Mission road from Ch:0.00km to 0.72km in banglore city |
334 |
000-10-N-P-R-E-WD-057 |
|
Widening and Improvements to Hennur road from Ch:2.00km to 3.442 km in banglore cit |
335 |
000-10-N-P-R-E-WD-056 |
|
Widening and Improvements to Hennur road from Ch:1.00km to 2.0 km in banglore city |
336 |
000-10-N-P-R-E-WD-055 |
|
Widening and Improvements to Hennur road from Ch:0.00km to 1.0 km in banglore city |
337 |
000-10-N-P-R-E-WD-054 |
|
Widening and strenthening of Road from Doddaballapura main Road to Chikkabanavara Via Jarkabande Kaval Attur cross Lakshmipura Cross Chainage 12.80Km to 14.30Km |
338 |
000-10-N-P-R-E-WD-053 |
|
Widening and strenthening of Road from Doddaballapura main Road to Chikkabanavara Via Jarkabande Kaval Attur cross Lakshmipura Cross Chainage 10.10Km to 12.80Km |
339 |
000-10-N-P-R-E-WD-052 |
|
Widening and strenthening of Road from Doddaballapura main Road to Chikkabanavara Via Jarkabande Kaval Attur cross Lakshmipura Cross Chainage 5.3Km to 8.00Km |
340 |
000-10-N-P-R-E-WD-051a |
|
Widening and strenthening of Road from Doddaballapura main Road to Chikkabanavara Via Jarkabande Kaval Attur cross Lakshmipura Cross Chainage 2.60 Km to 5.3Km |
341 |
000-10-N-P-R-E-WD-050 |
|
Widening and strenthening of Road from Doddaballapura main Road to Chikkabanavara Via Jarkabande Kaval Attur cross Lakshmipura Cross Chainage 0.0 to 2.60 Km |
342 |
000-10-N-P-R-E-WD-049a |
|
Widening and strenghening of road from Laxmipura road to Chikkabanavara via Abbigere Kuruguddanahalli Dasappanapalya Ch:2.70 to 3.70km |
343 |
000-10-N-P-R-E-WD-048A |
|
Wedening and strenghtening of Road from Laxmipura road to Chikkabanavara(via Abbigere karuguddanahallli Dasappanapalya) (Ch: 1.00 to 2.70km) |
344 |
000-10-N-P-R-E-WD-047a |
|
Widening and strenghtening of road from Laxmipura road to Ckikkabanavara (via Abbigere Karaguddanahalli Dasappanapalya ) (ch:0.00 to 1.00) |
345 |
000-10-N-P-R-E-WD-046A |
|
Wdening and strenghtening of Road from Jalahalli main road to WAIMAC Junction (via kammagondanahalli) |
346 |
000-10-N-P-R-E-WD-041 |
|
Widening and Improvements to Sankey road Sixth reach 2600.00 mtrs to 3338.00 mtrs |
347 |
000-10-N-P-R-E-WD-040 |
|
Widening and Improvements to Sankey road Fifth reach 2200 mtrs to 2600 mtrs |
348 |
000-10-N-P-R-E-WD-039 |
|
Widening and Improvements to Sankey road Fourth reach 1800 mtrs to 2200mtrs |
349 |
000-10-N-P-R-E-WD-038 |
|
Widening and Improvements to Sankey road Third reach 920mtrs to 1800mtrs |
350 |
000-10-N-P-R-E-WD-037 |
|
Widening and Improvements to Sankey road Secound reach 500mtrs to 920mtrs |
351 |
000-10-N-P-R-E-WD-036 |
|
Widening and Improvements to Sankey road First reach from Ch:0.00mtrs to 500mtrs |
352 |
000-10-N-P-R-E-WD-034 |
|
Estimate for the work of Sewerage line and Construction of Manholes (From Basaveshwara Circle to park House road) in Palace road |
353 |
000-10-N-P-R-E-WD-014 |
|
Construction of Compound infront of GOvt Building in wheelers road and banasawadi road in bangalore city (276 m to 447m) |
354 |
000-10-N-P-R-E-WD-013 |
|
Construction of compound wall infront of Govt Building in wheelers road and banasawadi road in bangalore city 0138m to 276.0m |
355 |
000-10-N-P-R-E-UP-059 |
|
Procurement of RCC box segments of size 7.5mx4.5mx1.0m. For vehicular under pass at kendriya Sadana road junction |
356 |
000-10-N-P-R-E-UP-058 |
|
Procurement of RCC box segments of size 7.5mx4.5mx1.0m. For vehicular under pass at sarjapura road junction |
357 |
000-10-N-P-R-E-UP-057 |
|
Procurement of RCC box segments of size 7.5mx4.5mx1.0m. For vehicular under pass at forum junction |
358 |
000-10-N-P-R-E-UP-056 |
|
Procurement of RCC box segments of size 7.5mx4.5mx1.0m. For vehicular under pass at Marigowda road junction |
359 |
000-10-N-P-R-E-UP-033 |
|
Procurement of RCC Precast Box segments of size 7.50m x 4.50m x 1.00m for Vehicular Underpass along Dr. Rajkumar Road at Vivekanada college Junction. |
360 |
000-10-N-P-R-E-UP-032 |
|
Formation of Service Road Concreting to ramps for vehicular Underpas Along Dr. Rajkumar Road at Vivekananda College Junction. |
361 |
000-10-N-P-R-E-UP-031a |
|
Construction of Retaining wall for Vehicular underpass along Dr. Rajkumar Road at Vivekananda college junction. |
362 |
000-10-N-P-R-E-UP-031 |
|
Construction of Retaining wall for Vehicular underpass along Dr. Rajkumar Road at Vivekananda college junction. |
363 |
000-10-N-P-R-E-UP-030a |
|
Procurement of RCC Pre Cellular Block of size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at Vivekananda CollegeJunction. |
364 |
000-10-N-P-R-E-UP-030 |
|
Procurement of RCC Pre Cellular Block of size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at Vivekananda CollegeJunction. |
365 |
000-10-N-P-R-E-UP-029 |
|
Providing Drainage facilities for Vehicular Underpass Along Dr. Rajkumar Road at Vivekananda College Junction |
366 |
000-10-N-P-R-E-UP-028a |
|
Lowering of RCC Pre-cast box segments of size 7.50mx4.5mx1.0m for vehicular underpass along Dr. Rajkumar road at Vivekananda College Juction |
367 |
000-10-N-P-R-E-UP-028 |
|
Lowering of RCC Pre-cast box segments of size 7.50mx4.5mx1.0m for vehicular underpass along Dr. Rajkumar road at Vivekananda College Juction |
368 |
000-10-N-P-R-E-UP-027a |
|
Construction of approach road for underpass and other allied works along Dr. Rajkumar Road at vivekananda college junction. |
369 |
000-10-N-P-R-E-UP-027 |
|
Construction of Approach Road and other Allied Works for Vehicular Underpass Along Dr. Rajkumar Road at Vivekananda College Junction. |
370 |
000-10-N-P-R-E-UP-026 |
|
Construction of Approach road and other Allied works for underpass along Dr. Rajkumar Road at 10th Cross Junction. |
371 |
000-10-N-P-R-E-UP-025 |
|
Lowering of RCC Pre cast Box Segments of size 7.5mX4.5mX1.0m for vehicular underpass along Dr.Rajkumar road at 10th cross junction. |
372 |
000-10-N-P-R-E-UP-024 |
|
Formation of service road concreting to ramps for underpass along Dr. Rajkumar road at 10th cross junction. |
373 |
000-10-N-P-R-E-UP-023 |
|
Providing Drainage Facilities to Underpass Along Dr. Rajkumar Road at 10th Cross Junction. |
374 |
000-10-N-P-R-E-UP-022a |
|
Procurement of RCC Pre Cellular Block of size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
375 |
000-10-N-P-R-E-UP-022 |
|
Procurement of RCC Pre Cellular Block of size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
376 |
000-10-N-P-R-E-UP-021a |
|
Procurement of RCC Precast Box segments of size 7.50m x 4.50m x 1.00m for Vehicular Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
377 |
000-10-N-P-R-E-UP-021 |
|
Procurement of RCC Precast Box segments of size 7.50m x 4.50m x 1.00m for Vehicular Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
378 |
000-10-N-P-R-E-UP-020a |
|
Construction of Retaining wall for Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
379 |
000-10-N-P-R-E-UP-020 |
|
Construction of Retaining wall for Underpass along Dr. Rajkumar Road at 10th Cross Junction. |
380 |
000-10-N-P-R-E-UP-019 |
|
Procurement of RCC Precast box segments of 7x3.5x1m for vehicular underpass from seshadri road to kalidasa road |
381 |
000-10-N-P-R-E-UP-017 |
|
Construction of approach ramps of vehicular underpass at the junction of Kalidasa road and Sheshadri road |
382 |
000-10-N-P-R-E-UP-016 |
|
Lowring of rcc precast box segmnts and cnstrctn of Starcase allied wrks at pedstrian undrpas across the Lavelle Road near T Siddalingaih circle Shifted to Post Office rd |
383 |
000-10-N-P-R-E-UP-015 |
|
Procurement of RCC precast box segments of 7x3.5x1m for vehicular underpass from Kalidasa road to sheshadri road |
384 |
000-10-N-P-R-E-UP-014 |
|
Lowrng of RCC precast box segmnts and constructn of Staircase and allied works at pedestrian underpass across Kasturba rd near T Sidalingh circle Shftd to Ambedkar Veedhi |
385 |
000-10-N-P-R-E-UP-013 |
|
Construction of approach ramps and Crash barrier of vehicular underpass at BEL road and ring road junction |
386 |
000-10-N-P-R-E-UP-012 |
|
Procurement of RCC Precast box segments of 6.00mx4.50mx1.0m for Vehicular underpass from BEL towards Mathikere at Ring road and BEL Junction |
387 |
000-10-N-P-R-E-UP-011 |
|
Procurement of RCC Precast box segments of 6.00mx4.50mx1.0m for Vehicular underpass from Mathikere towards BEL road at Ring road and BEL Junction |
388 |
000-10-N-P-R-E-UP-009 |
|
Formation of trench lowering the segments of size 6.0x4.50x1.0m at BEL road and Ring Road junction |
389 |
000-10-N-P-R-E-UP-007 |
|
Procurement of RCC precast box segments of 3.0mx3.0mx1.0m for pedestrian underpass across Vittal Mallya Road Shifted to Cubbon Road |
390 |
000-10-N-P-R-E-UP-006 |
|
Procurement of RCC precast box segments of 3.0mx3.0mx1.0m for pedestrian underpass across Levelle Road Shifted to Post Office road |
391 |
000-10-N-P-R-E-UP-005 |
|
Procurement of RCC precast box segments of 3.0mx3.0mx1.0m for pedestrian underpass across Kasturba Road (Shifted to Vidhanasoudha road near M.S.Building) |
392 |
000-10-N-P-R-E-UP-004 |
|
Procurement of RCC precast box of 3.0mx3.0mx1.0m for pedestrian from Corporation towards T.Siddalingaiah Road (Shifted to Nruputanga road) |
393 |
000-10-N-P-R-E-UP-003 |
|
Formation of trench lowering the segments of size 7.0mx3.50mx1.0m at the junction of Kalidasa road and Sheshadri road |
394 |
000-10-N-P-R-E-UP-001 |
|
Providing asphalting to approaches to the underpass at Sanjayanagar junction |
395 |
000-10-N-P-R-E-SU-002 |
|
Construction of Pedestrain Subway using pre-cast Box Segments Formation of trench Lowering the segments and other allied works in Madivala Market Road. |
396 |
000-10-N-P-R-E-SU-001 |
|
Construction of Pedestrain Subway using pre-cast Box Segments Formation of trench Lowering the segments and other allied works in Madivala Market Road. |
397 |
000-10-N-P-R-E-MI-003 |
|
Removal of excavated muck & debris on Sheshadri road from Ch: 200.00 to 850.00 Mtr. in Bangalore city |
398 |
000-10-N-P-R-E-FO-001 |
|
Construction of High Raised Median on Race Course road |
399 |
000-10-N-P-R-E-CD-063 |
|
Deviation Road for Signal Free Corridor at Nehru Road and CMR Road |
400 |
000-10-N-P-R-E-CD-060 |
|
Rehabiltation and Strengthening of Road from Sadaramangala to Medehalli-Belathur road |
401 |
000-10-N-P-R-E-CD-059 |
|
Rehabiltation and Strengthening of Road from White field road to Channasandra Main road via HagadurImmidihalliNagondanahalli Channasandra from Ch:2250 to 4500mtrs |
402 |
000-10-N-P-R-E-CD-058 |
|
Rehabiltation and Strengthening of Road from White field road to Channasandra Main road via Hagadur Immidihalli Nagondanahalli Channasandra from Ch:0 to 2250mtrs |
403 |
000-10-N-P-R-E-CD-057 |
|
Improvements and Asphalting of Road from TC Palya to Halehalli |
404 |
000-10-N-P-R-E-CD-056 |
|
Improvements and Asphalting of Road from NH4@ Medehalli to Kadugodi via KarudusonnenahalliK.Dommasandra BelathurCh:2700-4700 mtrs. |
405 |
000-10-N-P-R-E-CD-054 |
|
Impro and Asphalt Indiranagara 6th Mn Rd from 80 ft rd to 100 ft rd and 12th mn rd from 80ft rd to ESI hsptl jn and 80 ft rd from Old Madras road to Jevan bhma ngr mn rd |
406 |
000-10-N-P-R-E-CD-048 |
|
Improvements and Asphalting of Lavalle road Walton road And Other Link Roads |
407 |
000-10-N-P-R-E-CD-045 |
|
Rehabilitation and Strengthening of Mailasandra Main Road from Mysore road to Mailasandra bus stop |
408 |
000-10-N-P-R-E-CD-043 |
|
Rehabilitation and Strengthening of 1st main Gavipura Extension main Road from Amritanandamayi Mata to outer ring road.ch.0 to 550M. |
409 |
000-10-N-P-R-E-CD-037 |
|
Rehabilitation Diversion road for providing Signal free junction at Hoskerahalli Road(KEB junction) Dr.Muthuraj Road junction and Katharaguppe junction. |
410 |
000-10-N-P-R-E-CD-036- |
|
Strengthening widening and asphalting to Magadi main road from Outer Ring road to Nice Road Corridor |
411 |
000-10-N-P-R-E-CD-036 |
|
Rehabilitation and Strengthening of Diversion road for providing Signal free junction at Udupi Garden junction and Dollars Colony Junction |
412 |
000-10-N-P-R-E-CD-035 |
|
Rehabilitation and strengthening of road from Tata Institute main gate to Circle Maramma temple |
413 |
000-10-N-P-R-E-CD-034 |
|
Rehabilitation and strengthening of road from first block Rajajinagar Circle to MKK road (19th main road) |
414 |
000-10-N-P-R-E-CD-033 |
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 3.2 to 4.0 km |
415 |
000-10-N-P-R-E-CD-032 |
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 2.40 to 3.20km |
416 |
000-10-N-P-R-E-CD-031 |
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 1.60 to 2.40 km |
417 |
000-10-N-P-R-E-CD-030 |
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 0.80 to 1.60 Km |
418 |
000-10-N-P-R-E-CD-028 |
|
Rehabilitation and Strengthening of 16th Main Road BSK 2nd Stage Ch: 950m to 1800m. |
419 |
000-10-N-P-R-E-CD-027 |
|
Rehabilitation and Strengthening of 16th Main Road BSK 2nd Stage Ch: 0 to 950m. |
420 |
000-10-N-P-R-E-CD-026 |
|
Rehabilitation and Strengthening of 14th Cross K.R Road junction upto 2nd Cross Road Thyagarajnagara. |
421 |
000-10-N-P-R-E-CD-025. |
|
Rehabilitation and Strenghtening of road connecting from BDA complex Banashankari to Attimabbe main road. |
422 |
000-10-N-P-R-E-CD-025 |
|
Improvements to Diversion roads for Suranjandas Road Junction |
423 |
000-10-N-P-R-E-CD-024 |
|
Rehabilitation and Strengthening of diversion roads for Kundalahalli Junction (Ch0.00m to 4700.00m) |
424 |
000-10-N-P-R-E-CD-021a |
|
rehabilitatioin and strengthening of victoria road from ASC center to palm grove road juction |
425 |
000-10-N-P-R-E-CD-021 |
|
Detailed estimate for rehabilitatioin and strengthening of victoria road from ASC center to palm grove road juction |
426 |
000-10-N-P-R-E-CD-020 |
|
Improvements to Traffic Diversion roads at 1) Road by the side of SWD from Banneraghatta road to Hosur road. 2) Road by the side of SWD from Hosur road to Lakshmnrao nagara (Ejipura) |
427 |
000-10-N-P-R-E-CD-019 |
|
Rehabilitation and Strengthening of Anepalya Road and Campbell Road. |
428 |
000-10-N-P-R-E-CD-018a |
|
Rehabilitation and strengthening of 4th main road from 5th cross Malleshwaram to 18th cross malleshwaram. |
429 |
000-10-N-P-R-E-CD-018 |
|
Rehabilitation and strengthening of 4th main road from 5th cross Malleshwaram to 18th cross malleshwaram. |
430 |
000-10-N-P-R-E-CD-017 |
|
Rehabilitation and strenghtening from KC General Hospital 5th cross Malleshwaram to Nagappa Block & 1st main Gayatri nagar form MKK road to Subramanya nagar main road. |
431 |
000-10-N-P-R-E-CD-016a |
|
Provi asphg to Rd from West of Chord rd at Shivanahalli jn to Rajajingr Ent via Bhasyam Circle. Ch 0.0 to 1.6m and Road |
432 |
000-10-N-P-R-E-CD-016 |
|
Provi asphg to Rd from West of Chord rd at Shivanahalli jn to Rajajingr Ent via Bhasyam Circle. Ch 0.0 to 1.6m and Road |
433 |
000-10-N-P-R-E-CD-015 |
|
Rehabilitation and Strengthening of Adugodi road from Hosur Road to 80 feet road Kormangala and 18th Main Road from 5th cross road to 80 ft road kormangala |
434 |
000-10-N-P-R-E-CD-014 |
|
Rehabilitation and Strengthening 20th Main Road (from Hosur Road to 80 feet road) and 1st 5th and 6th cross roads (from 20th main Road to 100 ft road) of kormangala. |
435 |
000-10-N-P-R-E-CD-013 |
|
Rehabiltation and Strengthening of Road from Sadaramangala to Medehalli-Belathur road |
436 |
000-10-N-P-R-E-CD-011d |
|
Work - 4 |
437 |
000-10-N-P-R-E-CD-011c |
|
Work - 3 |
438 |
000-10-N-P-R-E-CD-011b |
|
Work - 2 |
439 |
000-10-N-P-R-E-CD-011a |
|
Work -1 |
440 |
000-10-N-P-R-E-CD-011 |
|
Rehabiltation and Strengthening of Road from White field road to Channasandra Main road via HagadurImmidihalliNagondanahalli Channasandra from Ch:0 to 2250mtrs |
441 |
000-10-N-P-R-E-CD-010 |
|
Improvements and Asphalting of Road from TC Palya to Halehalli |
442 |
000-10-N-P-R-E-CD-009 |
|
Improvements and Asphalting of Road from NH4@ Medehalli to Kadugodi via Karudusonnenahalli K.Dommasandra BelathurCh:2700-4700 mtrs |
443 |
000-10-N-P-R-E-CD-008 |
|
Improvements and Asphalting of Road from NH4@ Medehalli to Kadugodi via Karudusonnenahalli K.Dommasandra BelathurCh:700-2700 mtrs |
444 |
000-10-N-P-R-E-CD-006a |
|
Formation and Construction of Road from Kodipalya to Kanakapura main road via Ganigarapalya Nagegowdanapalya ch:8.80km to 10.20km |
445 |
000-10-N-P-R-E-CD-006 |
|
Formation and Construction of Road from Kodipalya to Kanakapura main road via Ganigarapalya Nagegowdanapalya ch:8.80km to 10.20km |
446 |
000-10-N-P-R-E-CD-005a |
|
Formation and construction of road from Kodipalya to Kanakapura main road via Ganigarapalya Nagegowdanapalya Ch: 6.80mkm to 8.80km |
447 |
000-10-N-P-R-E-CD-005 |
|
Formation and construction of road from Kodipalya to Kanakapura main road via Ganigarapalya Nagegowdanapalya Ch: 6.80mkm to 8.80km |
448 |
000-10-N-P-R-E-CD-004 |
|
Formation and construction of road from Kodipalya to Kanakapura Main Road via Ganigarapalya Ch: 0.00Km to 2.00km |
449 |
000-10-N-P-R-E-CD-003 |
|
Strenghtening of Road from Mysore Road to Mylasandra |
450 |
000-10-N-P-R-E-CD-002 |
|
Formation and construction of road from Kanakapura main road to Chikke gowdanapalya via Hosahalli Ch: 1.20Km to 2.40Km |
451 |
000-10-N-P-R-E-CD-001 |
|
Improvements and Asphalting of Lavalle road Walton road And Other Link Roads |
452 |
000-10-N-P-R-E-AS-068 |
|
Detailed Estimate for Rehabilitation and Strengthening of Old Madras Road from Byalanjaneya temple to NGEF Circle Ch:1500-2100mtrs. |
453 |
000-10-N-P-R-E-AS-067 |
|
Detailed estimate for Rehabilitation and Strengthening of Old Madras Road from Byalanjaneya temple to NGEF Circle Ch:1000-1500mtrs |
454 |
000-10-N-P-R-E-AS-066 |
|
Detailed estimate for Rehabilitation and Strengthening of Old Madras Road from Byalanjaneya temple to NGEF Circle Ch:500-1000mtrs |
455 |
000-10-N-P-R-E-AS-065 |
|
Detailed estimate for Rehabilitation and Strengthening of Old Madras Road from Byalanjaneya temple to NGEF Circle Ch:0-500mtrs |
456 |
000-10-N-P-R-E-AS-054 |
|
Improvement & asphalting of a) Jeevan Bheema Nagara main road from suranjanadas road telephone exchange b) Road from Bylanjaneya Swamy temple to Adarsha theatre c) 13th Main road Indiranagara from 1st main road to 80 feet road |
457 |
000-10-N-P-R-E-AS-052 |
|
Strengthening and rehabilitation of 24th main road J.P.Nagar from Ring Road to Puttenahalli |
458 |
000-10-N-P-R-E-AS-051 |
|
Widening and Strengthening of the existing surface of 5th Main Road from O.R.R to 27th Cross Road of HSR Layout |
459 |
000-10-N-P-R-E-AS-050 |
|
Strengthening and REhabilitation of 3rd Main J.P.Nagar Dollars Colony from 9th cross to Daya Apartment via Kalyani Magnum. |
460 |
000-10-N-P-R-E-AS-049 |
|
Widening and strengthening of the existing surface of 9th Main Road from O.R.R to 27th Cross Road of H.S.R Layout. |
461 |
000-10-N-P-R-E-AS-048 |
|
Widening and Strengthening of the existing surface of Mangammana Palaya Main Road HSR Layout from 10th Main Road to 5th Main Road. |
462 |
000-10-N-P-R-E-AS-047 |
|
Widening and Strengthening the existing surface of 19th Main Road from 17th cross to 9th cross and 12th 13th 15th cross from 9th main to 4th main of HSR layout |
463 |
000-10-N-P-R-E-AS-046 |
|
Widening and Strengthening to the existing surface of 14th Main from 17th cross Road to 27th cross Road. |
464 |
000-10-N-P-R-E-AS-045 |
|
Widening and Strengthening the existing surface of 17th cross Road of HSR Layout from 5th Main Road to 19th Main Road. |
465 |
000-10-N-P-R-E-AS-040 |
|
Improvement and Asphalting of road from Vidyaranya pura 1st block to Lottegollahalli on Ring road Via Bommasandra Krishna Temple |
466 |
000-10-N-P-R-E-AS-039 |
|
Asphalting to road from gangamma circle to last bus stop of vidyaranyapura via kaltur layout and ramachandrapura village ch 0.00 to 2500m |
467 |
000-10-N-P-R-E-AS-038 |
|
Rehabilitation and Strengthening of road from MS Palya to Shivakote Village (Ch : 5.86 to 8.37 Km) |
468 |
000-10-N-P-R-E-AS-037 |
|
Rehabilitation and Strengthening of road from MS Palya to Shivakote Village (Ch : 0.00 to 2.93 Km) |
469 |
000-10-N-P-R-E-AS-036 |
|
Rehabilitation and Strengthening of road from MS Palya to Shivakote Village (Ch : 2.93 to 5.86 Km) |
470 |
000-10-N-P-R-E-AS-034 |
|
Detailed estimate for improvements and Asphalting of a) road from Adugodi main road to longford road (hockey stadium junction)via longford town layout B) museum road from castle street junction to st.Marks road SBI circle C) bazaar street road from i |
471 |
000-10-N-P-R-E-AS-033 |
|
Detailed estimate for improvements and Asphalting of a) Domlur main road from BMTC bus terminal to shiridi saibaba temple road and its cross roads B) domlur layout 7th cross road 1st cross road and 2nd main road |
472 |
000-10-N-P-R-E-AS-032 |
|
Detailed estimate for improvements and Asphalting of a) cambridge layout main road from ulsoor police station to Airport road via shiridi sai baba temple road junction and 1st main road B)leela palace road from jeevan bheema nagar road to airport roa |
473 |
000-10-N-P-R-E-AS-030 |
|
Asphalting to road from Triveni road cross junction in M.S.Ramaih road to C.V.Raman road |
474 |
000-10-N-P-R-E-AS-029 |
|
Providing Asphalting 1st main road Yashwanthpur Bazar Circle to HMT main road in ward no.3 |
475 |
000-10-N-P-R-E-AS-028 |
|
Providing Asphalting 16th main road surrounding Jai Maruthi Nagara in ward No.12 |
476 |
000-10-N-P-R-E-AS-027 |
|
Providing Asphlating from Mohan kumar nagar main road from Chowdeshwari bus stand to akkaippa garden Shankarnagar Bus Stand to MES road 1st main Jalahalli in ward no.2 |
477 |
000-10-N-P-R-E-AS-026 |
|
Providng Asphalting from Modi Hospital junction toward 1st main Thimmaih road in ward no 20 |
478 |
000-10-N-P-R-E-AS-025 |
|
Providing Asphalting from Havanur Circle junction towards MIG KHB Main road 2nd stage Baseveshwaranagar 1st main Kamakshipalya in ward no.18 |
479 |
000-10-N-P-R-E-AS-024 |
|
Providng Asphalting from Jalahalli Circle on NH 4 to Aravind Motors cross road in ward no 11 |
480 |
000-10-N-P-R-E-AS-023 |
|
Providing Asphalting from 12th main ESI Hospital junction via KLE college surroundings behind Navaranga Theatre road in ward no.15 |
481 |
000-10-N-P-R-E-AS-022A |
|
Rehabilitation and strenghtening ofApproach road to service road of outer Ring road from Lumbini Park. |
482 |
000-10-N-P-R-E-AS-022 |
|
Rehabilitation and strenghtening ofApproach road to service road of outer Ring road from Lumbini Park. |
483 |
000-10-N-P-R-E-AS-020a |
|
Improvements and asphalting of road from Old Airport road at Kundalalli gate to Hoodi Junction from chainage 4.50Km to 5.20km |
484 |
000-10-N-P-R-E-AS-019a |
|
Improvements and asphalting of Road from Old airport road at Kundalahalli gate to Hoodi junction . Ch: 3.9 to 4.5km |
485 |
000-10-N-P-R-E-AS-018a |
|
Improvements and Asphalting of road from Old Airport road at Kundalalli gate to Hoodi Junction ch:3.30km to 3.90km |
486 |
000-10-N-P-R-E-AS-018. |
|
Detailed estimate for Rehabilitation and Strengthening of Mission road from Subbaiah Circle to Richmond Circle |
487 |
000-10-N-P-R-E-AS-017a |
|
Improvements and asphalting of road from Old Airport road at Kundalalli gate to Hoodi Junction from ch:2.70 to 3.30km |
488 |
000-10-N-P-R-E-AS-017. |
|
Detailed estimate for Improvements and Asphalting of KHB Main road from Railway Crossing to Outer Ring Road |
489 |
000-10-N-P-R-E-AS-016b |
|
Improvements to Footpath and Asphalting of Adi Kabir Ashrama road (CIL road to JC Nagara Main road) |
490 |
000-10-N-P-R-E-AS-016a |
|
Improvements and asphalting of road from Oldairport road at Kundalalli gate to Hoodi Junction from ch:2.0 to 2.70km |
491 |
000-10-N-P-R-E-AS-016 |
|
Improvement to 7th main road from Banasawadi main road to ORR Ch:800 to 1600mts |
492 |
000-10-N-P-R-E-AS-015a |
|
Improvements and asphalting of road from Old Airport road at kundalalli gate to Hoodi Junction from Ch: 1.00km to 2.0km |
493 |
000-10-N-P-R-E-AS-015 |
|
Improvement to 7th main road from Banasawadi main road to ORR Ch:0 to 800mts |
494 |
000-10-N-P-R-E-AS-014h |
|
Improvements and asphalting of Road from old airport road at Kundalahalli gate to Hoodi junction From Ch: 0.00 to 1.00km. |
495 |
000-10-N-P-R-E-AS-014. |
|
Detailed estimate for Rehabilitation and Strengthening of Road from Outer Ring Road to Agara via Prakruthi Balaji Layout. |
496 |
000-10-N-P-R-E-AS-013. |
|
Detailed estimate for Rehabilitation and Strengthening of Road from Agara to Hennur Main Road |
497 |
000-10-N-P-R-E-AS-013 |
|
Detailed estimate for Rehabilitation and Strengthening of Road from Agara to Hennur Main Road |
498 |
000-10-N-P-R-E-AS-012aa |
|
improvements and Asphalting of a) road from Adugodi main road to longford road (hockey stadium junction)via longford town layout |
499 |
000-10-N-P-R-E-AS-012. |
|
Detailed estimate for Rehabilitation and Strengthening of Road from Horamaavu to Agara from Km.1.75 to Km.3.15 |
500 |
000-10-N-P-R-E-AS-012 |
|
Detailed estimate for Rehabilitation and Strengthening of Road from Horamaavu to Agara from Km.1.75 to Km.3.15 |
501 |
000-10-N-P-R-E-AS-011. |
|
Detailed estimate for Rehabilitation and Strengthening of TC Palya main road from Raghavendra Nagar to Horamaavu via Jayanthinagar |
502 |
000-10-N-P-R-E-AS-011 |
|
Detailed estimate for Rehabilitation and Strengthening of TC Palya main road from Raghavendra Nagar to Horamaavu via Jayanthinagar |
503 |
000-10-N-P-R-E-AS-010. |
|
Detailed estimate for Rehabilitation and Strengthening of TC Palya main road from Akshaya Nagara to K.Channasandra via Varanasi from Ch:0.00 to 2.00 Km |
504 |
000-10-N-P-R-E-AS-010 |
|
Detailed estimate for Rehabilitation and Strengthening of TC Palya main road from Akshaya Nagara to K.Channasandra via Varanasi from Ch:0.00 to 2.00 Km |
505 |
000-10-N-P-R-E-AS-009 |
|
Rehabilitation and strengthening of N I I T Road to Sadanandha Hair Dressers Ch 0.00 km to 1.10 km |
506 |
000-10-N-P-R-E-AS-004 |
|
Rehabilitation and strengthening of 17th main roaad 2nd block Rajajinagar ( KEB Choultry Road ) Ch 0.0km to 1.15km |
507 |
000-10-N-P-R-E-AS-003. |
|
Detailed estimate for Asphalting of Old Airport road from Suranjandas road to HAL Helicopter division Ch: 5.6 to 7.0 Km |
508 |
000-10-N-P-R-E-AS-002. |
|
Detailed estimate for Asphalting of Old Airport road from Domlur fly over to Suranjandas road Ch: 3.0 to 5.6 Km |
509 |
000-10-N-P-R-D-FO-14 |
|
Improving Existing drain on Veerabhdra Nagara Main road |
510 |
000-10-N-P-R-B-PO-003 |
|
Construction of compound wall infront of Govt. Properties survey and land use premises at Bellary road |
511 |
000-10-N-P-R-B-MI-012 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 12 |
512 |
000-10-N-P-R-B-MI-011 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 11 |
513 |
000-10-N-P-R-B-MI-010 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 10 |
514 |
000-10-N-P-R-B-MI-009 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 9 |
515 |
000-10-N-P-R-B-MI-008 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 8 |
516 |
000-10-N-P-R-B-MI-007 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 7 |
517 |
000-10-N-P-R-B-MI-006 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 6 |
518 |
000-10-N-P-R-B-MI-005 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 5 |
519 |
000-10-N-P-R-B-MI-004 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 4 |
520 |
000-10-N-P-R-B-MI-003 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 3 |
521 |
000-10-N-P-R-B-MI-002 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 2 |
522 |
000-10-N-P-R-B-MI-001 |
|
Dismantling ana re construction of Compound wall along Govt properties in Sankey road reach 1 |
523 |
000-10-N-P-R-B-FO-012 |
|
Construction of Compound wall with M.S Grill work and improvements to footh path and parking area of BESCOM premises K.R Circle |
524 |
000-10-N-P-R-B-FO-011 |
|
Construction of Compound to the premises of Bangalore University in Palace road (LHS) from Ch.0.250km to Ch.0.325km in BAngalore City |
525 |
000-10-N-P-R-B-FO-010 |
|
Construction of Compound to the premises of Banglore university in Palace road (LHS) from Ch1.125km to Ch.0.250 km in Banglore city |
526 |
000-10-N-P-R-B-FO-009 |
|
Construction of compound in front of property of University of Bangalore in Palace Road LHS(Ch.0.00 to 0.125 km) (125 mtr) |
527 |
000-10-N-P-R-B-FO-008 |
|
Construction of Compound to the premises of Bangalore University in Palace road (RHS) from Ch.0.375km to Ch.0.445km in BAngalore City |
528 |
000-10-N-P-R-B-FO-007 |
|
Construction of Compound to the premises of Banglore university in Palace road (RHS) from Ch.0250km to Ch.0.375 km in Banglore city |
529 |
000-10-N-P-R-B-FO-005 |
|
Construction of Compound to the premises of Banglore university in Palace road (LHS) from Ch.0.000km to Ch.0.125 km in Banglore city |
530 |
000-10-N-P-R-B-FO-004 |
|
Construction of Compound Infront of Collegiate Education Department and Meteorological Department in palace Road RHS Ch: 0.445 ti 0.565km(120 mtr.) |
531 |
000-10-N-P-R-B FO-003 |
|
Construction of compound wall infront of Govt. prop. soil survey and landuse premiss at Bellary road |
532 |
000-10-N-P-R-AS-035 |
|
Rehabilitation and Strengthening of Mysore Road From Sirsi Circle to University Circle Ch 5.0Km to 6.0km |
533 |
000-10-N-P-R-AS-034 |
|
Rehabilitation and Strengthening Mysore Road From Sirsi Circle to University Circle Ch 4.1 to 5.00km |
534 |
000-10-N-P-R-AS-033 |
|
Rehabilitation and Strengthening of Mysore Road From Sirsi Circle to University Circle Ch 1.8 Km to 2.70km |
535 |
000-10-N-P-R-AS-031. |
|
Rehabilitation and Strengthening Mysore Road From Sirsi Circle to University Circle Ch 0.00km to 0.9 Km Item No.01 |
536 |
000-10-N-P-PO-MI-035a |
|
Consultancy Services for preparation of DPR along Dr. Rajkumar Road at Navarang Junction |
537 |
000-10-N-P-PO-MI-035 |
|
Consultancy Services for preparation of DPR along Dr. Rajkumar Road at Navarang Junction |
538 |
000-10-N-P-P-R-MI-009a |
|
Prog Consultancy services for preparation of DPR in respect of Improvements and asphalting of internal roads of EPIP and constrn of flyover/underpass @ Graphite india Jn. |
539 |
000-10-N-P-P-R-MI-005 |
|
Construction of compound wall infront of govt properties Karnataka Seeds Corp.. Ltd at Bellary road |
540 |
000-10-N-P-P-R-MI-004 |
|
Providing water supply and sanitary pipe lines from meteriological department to Y Ramachandra rao road in palace road |
541 |
000-10-N-P-P-R-MI-003 |
|
Providing mild steel barricade on Race Course road |
542 |
000-10-N-P-P-R-MI-001 |
|
Providing and laying water supply and electrical system in the premises of Bangalore University in Bangalore city (Ch:0.100km to Ch:0.375 km) RHS |
543 |
000-10-N-P-P-R-IM-048 |
|
Rehabilitation and Strengthening of 17th Cross 4th B Main and 8th Main in Agrahara Dasara Halli |
544 |
000-10-N-P-P-R-IM-002 |
|
Improvements to Bangalore Bellary road from Mekhri Circle to Sanjaynagar Surface pass (Eastern side) |
545 |
000-10-N-P-P-R-IM-001 |
|
Improvements to Bangalore Bellary road from Mekhri Circle to Sanjaynagar Surface pass (Wastern side) |
546 |
000-10-N-P-P-R-FO-016 |
|
Formation of approach ramp to underpass at sarjapura road junction |
547 |
000-10-N-P-P-R-FO-015 |
|
Formation and construction of road from Magadi road to Rajajinagar Entrance side. |
548 |
000-10-N-P-P-R-FO-014 |
|
Construction of approach road for Underpass and Other Allied works for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
549 |
000-10-N-P-P-R-FO-013 |
|
Formation of Service Road and Concreting to Ramps for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
550 |
000-10-N-P-P-R-FO-012 |
|
Construction of Retaining for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
551 |
000-10-N-P-P-R-FO-011 |
|
Procurement of RCC Pre Cellular Block of Size 3.00m x 2.20m x 1.00m for Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
552 |
000-10-N-P-P-R-FO-010 |
|
Lowering of RCC Precast box segments of size 7.50mx4.50mx1.00m for Vehicular underpass Along Dr. Rajkumar Road at Okalipuram Junction. |
553 |
000-10-N-P-P-R-FO-009 |
|
Providing Drainage facilities to Underpass along Dr. Rajkumar Road at Okalipuram Junction |
554 |
000-10-N-P-P-R-FO-008 |
|
Procurement of Additional RCC Precast Box Segments Of 7.50m X4.50m X1.00m for Vehicular Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
555 |
000-10-N-P-P-R-FO-007 |
|
Procurement of RCC Precast Box SEgments of size 7.50mx4.50x1.00m for Vehicular Underpass along Dr. Rajkumar Road at Okalipuram Junction. |
556 |
000-10-N-P-P-R-E-AS-038 |
|
Rehabilitation and strengthening of Road from MS Pallya to Shivakote village (Ch: 5.86Km to 8.37 Km) |
557 |
000-10-N-P-P-R-E-AS-037 |
|
Rehabilitation and strengthening of Road from MS Pallya to Shivakote village (Ch: 0 to 2.93 Km) |
558 |
000-10-N-P-P-O-MI-110 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-E.P.I.P Junction |
559 |
000-10-N-P-P-O-MI-109 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-N.G.E.F Layout Junction |
560 |
000-10-N-P-P-O-MI-108 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Hoodi main Road Junction |
561 |
000-10-N-P-P-O-MI-107 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Varthur Road Junction |
562 |
000-10-N-P-P-O-MI-106 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-H.P.Office Junction |
563 |
000-10-N-P-P-O-MI-105 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Kamaraj Road Junction |
564 |
000-10-N-P-P-O-MI-104 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Thammarai Kannan Road Junction |
565 |
000-10-N-P-P-O-MI-103 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Myrphy Road and old Madras road Junction |
566 |
000-10-N-P-P-O-MI-102 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Dhobighat Road Junction |
567 |
000-10-N-P-P-O-MI-101 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Sepping's Road Junction |
568 |
000-10-N-P-P-O-MI-100 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Han's Road Junction |
569 |
000-10-N-P-P-O-MI-099 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-BDA Junction |
570 |
000-10-N-P-P-O-MI-098 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-6th Main Road Junction |
571 |
000-10-N-P-P-O-MI-097 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Hope Farm Junction |
572 |
000-10-N-P-P-O-MI-096 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Agaraharam Road Junction |
573 |
000-10-N-P-P-O-MI-095 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-C.I.L Road Junction |
574 |
000-10-N-P-P-O-MI-094 |
|
Consultancy Services for singal free corridor from Mekhri Circle to hope fram junction-Meance Avenue Road Junction |
575 |
000-10-N-P-P-O-MI-087 |
|
Condudting of Engineering design cost Estimates DPR and Bidding Documents for Widening and Construction of 21 Nos of High/Medium density Corridor in banglore City |
576 |
000-10-N-P-P-O-MI-077 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C3-Magadi Road from West of Chord Road to ORR |
577 |
000-10-N-P-P-O-MI-076 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C11- Mekhri Circle to Hope Farm Via Old Madras Road White Field Road |
578 |
000-10-N-P-P-O-MI-075 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C6 Bannerghatta Road from IIMB to wilsan Garden |
579 |
000-10-N-P-P-O-MI-074 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C1 Dr. Rajkumar Road From Yeshwanthpur junction to okalipuram junction |
580 |
000-10-N-P-P-O-MI-073 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C8-Agara Lake (ORR) to Sirsi Circle |
581 |
000-10-N-P-P-O-MI-072 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C12 Cubbon Road to ORR |
582 |
000-10-N-P-P-O-MI-071 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C7 Vellara to White Field |
583 |
000-10-N-P-P-O-MI-070 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C4- IRR from Mysore road to Central Silk Board Junction |
584 |
000-10-N-P-P-O-MI-069 |
|
Carrying Out Ground Pentrating Radar (GPR) Survey For locating under Ground utlities in Bangalore C5-Central Silk Board junction to vellara Junction |
585 |
000-10-N-P-P-O-MI-058 |
|
Conducting Topographical survey Identification of properties investigations transportation planning and surveying preparation of engineering designs cost estimates with Techno-Commercial study detailed project report and bidding documents for widen |
586 |
000-10-N-P-P-O-MI-053 |
|
Carrying Out GPR survey for Locationg under ground utilites in Bangalore In Hundson |
587 |
000-10-N-P-P-O-MI-052 |
|
Carrying Out GPR survey for Locationg under ground utilites in Bangalore In Town Hall |
588 |
000-10-N-P-P-O-MI-051 |
|
Carrying Out GPR survey for Locationg under ground utilites in Bangalore In N.R.Circle |
589 |
000-10-N-P-P-O-MI-033 |
|
Consultancy services for preparation of DPR for sgnal Free Corridors along Dr. Rajkumar road at Vivekananda College Junction |
590 |
000-10-N-P-P-O-MI-028 |
|
Conducting Topographical Survey of Dr. Rajkumar Road from Yeshwanthpura to Okalipuram |
591 |
000-10-N-P-P-O-MI-001 |
|
Modrenisation of Dhobi ghat at Kodandarampura 3rd phase Malleshwaram. |
592 |
000-10-N-P-O-MI-037a |
|
Consultancy services for preparation of DPR for signal free Corridor Along Dr. Rajkumar Road at Magadi Road Deviation Junction. |
593 |
000-10-N-P-O-MI-037 |
|
Consultancy services for preparation of DPR for signal free Corridor Along Dr. Rajkumar Road at Magadi Road Deviation Junction. |
594 |
000-10-N-P-J-R-MI-009 |
|
Providing High Raised pedstrian Crossing in Sahakaranagar Yelahanka Jurisdiction |
595 |
000-10-N-P-J-R-MI-008 |
|
Providing High Raised Pedestrian Crossing in North-East Traffic Sub Division |
596 |
000-10-N-P-J-R-MI-007 |
|
Providing High Raised Pedestrian Crossing in North and Central Traffic Sub Division |
597 |
000-10-N-P-J-R-MI-006. |
|
Providing High Raised Pedestrian Crossing in East and Audugodi Traffic Sub Division |
598 |
000-10-N-P-J-R-MI-004 |
|
Removal of UnScientific Humps and Providing Scientific Humps in North - Central Traffic Sub Division |
599 |
000-10-N-P-J-R-MI-002 |
|
Removing Unscientific Road Humps and Providing Scientific Humps in East and Audugodi Traffic Sub Division |
600 |
000-10-N-P-J-R-MI-001 |
|
Construction of High Raised Pedetsrian Crossing at Yeshwanthpur-Yelahanka Road (Sandip Unnikrishnan) |
601 |
000-10-N-P-J-R-CD-005 |
|
Comprahensive Improvements to Uttarahally main road to Nirmala Giri Maternity Hospital Road |
602 |
000-10-N-P-J-R-CD-004 |
|
Comprahensive Improvements to Uttarahally main road from Uttarahally main road junction towards 11th cross Banashankari 6th stage |
603 |
000-10-N-P-J-R-CD-003 |
|
Comprahensive Improvements to Uttarahally main road from Uttarahally main road junction towards BGS Hospital |
604 |
000-10-N-P-J-R-CD-002 |
|
Comprahensive Improvements to Uttarahally main Road from Uttarahally main road junction towards BEML 3rd main road |
605 |
000-10-N-P-J-R-CD-001 |
|
Comprahensive Improvements to Uttarahalli main road from Savandharbar Ashrama to J S S College |
606 |
000-10-N-P-J-O-MI-001 |
|
Providing Road Furnitures and Signages for Sheshadri Road K R Circle and surrounding area |
607 |
000-10-N-P-J-O-IM-001 |
|
Providing U-Turn infront of HMT Bhavan near Mekhri Circle |
608 |
000-10-N-P-I-R-BE-079 |
|
Landscape development at chalukya circle surrounding areas circle near contonment railway station Makeri circle underpass median and maintenance |
609 |
000-10-N-P-I-R-BE-071 |
|
Landscape development at Seshadhri Road Agriculture Commissioners office freedom park median and janatha dhala office circle Race course road |
610 |
000-10-N-P-I-R-BE-070 |
|
Development of median by providing landscaping from mysore road BHEL to Kengeri 3001-4200 |
611 |
000-10-N-P-I-R-BE-069 |
|
Development of median by providing landscaping from mysore road BHEL to Kengeri 0-1500 Mts |
612 |
000-10-N-P-I-R-BE-068 |
|
Development of median by providing landscaping from mysore road BHEL to Kengeri 1501-3000 Mts |
613 |
000-10-N-P-I-R-BE-067 |
|
Drilling of borewell Horizontal Drilling and Irrigation for development of median from Mysore road BHEL to Kengeri 0-4200 Mts |
614 |
000-10-N-P-I-R-BE-066 |
|
Development of median by providing landscaping from K.R.Puram railway bridge to benanaganahalli Police station (Old Madras Road) 0-2000 Mts |
615 |
000-10-N-P-I-R-BE-065 |
|
Drilling of borewell Horizontal Drilling and Irrigaiton for development of median from K.R.Puram railway bridge to benaganahalli police station (Old Madras Road) |
616 |
000-10-N-P-I-R-BE-064 |
|
Development of median by providing landscaping from Hosakerehalli PES college to Mysore road nayandanahalli ORR ) 0-750 Mts |
617 |
000-10-N-P-I-R-BE-063 |
|
Development of median by providing landscaping from Hosakerehalli PES college to mysore road nayandanahalli ORR 751 to 1500 Mts |
618 |
000-10-N-P-I-R-BE-061 |
|
Landscape development and maintenance works to the median from sarjapur road junction to hosur road 3001-4000 Mts |
619 |
000-10-N-P-I-R-BE-060 |
|
Landscape development and Maintenance works to the median from sarjapur road junction to hosur road 2001-3000 Mts. |
620 |
000-10-N-P-I-R-BE-059 |
|
Landscape development and maintenance to the median from sarjapur road to hosur road 1001-2000 Mts. |
621 |
000-10-N-P-I-R-BE-058 |
|
Landscape development and maintenance works to the median from sarjapur road junction to hosur road 0-1000 Mts |
622 |
000-10-N-P-I-R-BE-057 |
|
Drilling of borewell Horizontal Drilling and Irrigation/watering at ORR Sarjapur road junction to Hosur road median development. |
623 |
000-10-N-P-I-R-BE-056 |
|
Landscape development and Maintenance works to the median from K.R.Puram railway bridge to sarjapur road junction 4001-5000 Mts |
624 |
000-10-N-P-I-R-BE-055 |
|
Landscape development and maintenance works to the median from K.R.Railway bridge to Sarjapur road junction 3001-4000 Mts. |
625 |
000-10-N-P-I-R-BE-054 |
|
Landscape development and Maintenance works to the median from K.R.Puram railway bridge to sarjapur road junction 2001-3000 Mts |
626 |
000-10-N-P-I-R-BE-053 |
|
Landscape development and Maintenance of the median from K.R.Puram railway bridge to Sarjapur road junction 1001-2000 Mts |
627 |
000-10-N-P-I-R-BE-052 |
|
Landscape development and maintenance works to the median from K.R.Puram Railway bridge to Sarjapur road junction 0-1000 Mts |
628 |
000-10-N-P-I-R-BE-051 |
|
Horizontal Drilling and irrigation for development of median from K.R.Puram railway bridge to sarjapur road junction 0-5000 Mts |
629 |
000-10-N-P-I-R-BE-050 |
|
Drilling of borewell for development of median from K.R.railway bridge to sarjapur road junction |
630 |
000-10-N-P-I-R-BE-049 |
|
Development of median by providing landscaping from sumanahalli junction to subhash chandra bose circle 3001-3700 Mts |
631 |
000-10-N-P-I-R-BE-048 |
|
Development of median by providing landscaping from sumanahalli junction to subhash chandra bose circle 2001-3000 Mts |
632 |
000-10-N-P-I-R-BE-047 |
|
Development of median by providing landscaping from sumanahalli junction to subhash chandra bose circle 1001-2000 Mts |
633 |
000-10-N-P-I-R-BE-046 |
|
Development of median by providing landscaping from sumanahalli junction to subhash chandra bose circle 0-1000 Mts. |
634 |
000-10-N-P-I-R-BE-045 |
|
Drilling of borewell Horizontal Drilling and Irrigation for development of median from sumanahalli junction to subhash chandra bose circle |
635 |
000-10-N-P-I-R-BE-044 |
|
Landscape development and maintenance work to the median from kasturiba nagar bridge to hennur cross 801-1200 Mts |
636 |
000-10-N-P-I-R-BE-043 |
|
Landscape development and maintenance works to the median from Kasturibanagar to Hennur cross junction 401-800 Mts. |
637 |
000-10-N-P-I-R-BE-042 |
|
Landscape development and Maintenance works to the median from Kasturiba nagar bridge to Hennur cross ORR 0-400 Mts. |
638 |
000-10-N-P-I-R-BE-041 |
|
Drilling of Borewell Horizontal Drilling and Irrigation for development of median at outer ring road kasturibanagar bridge to Hennur cross junction 0-1200 Mts. |
639 |
000-10-N-P-I-R-BE-040 |
|
Development of median by landscaping from Banarughatta ring road flyover to meenakshi temple 3001-4000 Mts |
640 |
000-10-N-P-I-R-BE-039 |
|
Development of median by providing landscaping from banarughatta flyover to menakshi temple 1501-3000 Mts |
641 |
000-10-N-P-I-R-BE-038 |
|
Development of median by providing landscaping from banarughatta flyover to Meenakshi temple flyover 0-1500 Mts. |
642 |
000-10-N-P-I-R-BE-037 |
|
Drilling of borewell Horizontal Drilling and Irrigation for development of median Banarughatta flyover to Meenakshi temple |
643 |
000-10-N-P-I-R-BE-036 |
|
Improvement to the road median in front of ramakrishna Ashrama |
644 |
000-10-N-P-I-R-BE-029 |
|
Landscape development at cauveri guest house opposite to agriculture college Hebbel |
645 |
000-10-N-P-I-R-BE-028 |
|
Providing and fixing ornamental grill fencing for missing bids to the circle and painting to the existing grills and cirlce. Lalbagh westgate and netkallappa circle |
646 |
000-10-N-P-I-R-BE-021 |
|
Landscape work to central median from subbaram convention hall to Navrang cross west of chord road Rajajinagar |
647 |
000-10-N-P-I-R-BE-020 |
|
Landscape work to the boulevard opposite to subbaram conventional hall to gowri shankar west of chord road |
648 |
000-10-N-P-I-R-BE-019 |
|
Landscape work to the boulevard from fire station to G.D.Bar west of chord road Rajajinagar |
649 |
000-10-N-P-I-R-BE-001 |
|
Landscape development at K.R.Circle planter boxes Vishveshwaraiah Statue triangular planter boxes |
650 |
000-10-N-P-E-R-WD-035 |
|
The Work pf Widening Improvements and Asphalting to Hennur road grom Kannoor Junction to Mylahalli Village Chainage 10100.00.00Mtr. 11100.00Mtr |
651 |
000-10-N-P-E-R-WD-030 |
|
The Work of Widening Improvements and Asphalting to Hennur road from Kannoor Junction to Mylahalli Village Chainage 5500.00 Mtr to 6600.00Mtr. |
652 |
000-10-N-P-E-R-WD-029 |
|
The Work pf Widening Improvements and Asphalting to Hennur road grom Kannoor Junction to Mylahalli Village Chainage 4400.00Mtr. 5500.00Mtr. |
653 |
000-10-N-P-E-R-WD-021 |
|
The Work of Widening Improvements and Asphalting to Hennur road from Kannoor Junction to Mylahalli Village Chainage 3300.00Mtr. To 4400.00Mtr. |
654 |
000-10-N-P-E-R-CD-044 |
|
Rehabilitation and Strengthening of 1st main Gavipura Extension main Road from Amritanandamayi Mata to outer ring road.ch. 550 to 1100M. |
655 |
000-10-N-P-E-R-CD-042 |
|
Rehabilitation and Strengthening of Doddabasthi Main Road from Kenchapura Cross(Outer Ring Road) to 100 ft BDA Road. |
656 |
000-10-N-P-E-R-CD-041 |
|
Rehabilitation and Strengthening of Dubasipalya Main Road from Kengeri Outer Ring Road to Mysore Road.CH 1000 TO 2000M. |
657 |
000-10-N-P-E-R-CD-040 |
|
Rehabilitation and Strengthening of Dubasipalya Main Road from Kengeri Outer Ring Road to Mysore Road.ch 0 to 1000M. |
658 |
000-10-N-P-E-R-CD-039 |
|
Rehabilitation and Strengthening of Mariyappanapalya Main Road from Jnanabharathi Campus to Outer Ring Road |
659 |
000-10-N-P-E-R-CD-038 |
|
Rehabilitation and strengthening of Kengeri satellite town bus stop main road |
660 |
000-10-N-P-E-R-CD-037 |
|
Rehabilitation and strengthening of Pattanagere main road from Mysore road to BHEL Lay out 2nd stage. |
661 |
000-10-N-P-E-R-CD-004 |
|
Rehabilitation and Strengthening of Madivala Market Road from Sarjapura Main Road to Hosur Main Road. Ch: 720m to 960m |
662 |
000-10-N-P-E-D-FO-002 |
|
Providing pre-cast covering slab by replacing existing stone slabs to various road side drains & providing RCC slab by replacing existing stone slabs on various culverts in Richmond Town |
663 |
000-10-N-P-E-B-FO-002 |
|
Construction of compound in the premises of B.S.N.L between Ch.100.00 to Ch.250.00 for widening of Kensigton road in Bangalore. |
664 |
000-10-N-P-E-B-FO-001 |
|
Construction of 3rd Floor 4th Floor and Approach Road for Major Roads Zonal Office Building at BBMP Premises. |
665 |
000-10-N-P- R-E-UP-003 |
|
Formation of trench lowering the segments of size 7.0mx3.50mx1.0m at the junction of Kalidasa road and Sheshadri road |
666 |
000-10-N-J-N-D-FO-070 |
|
Reconstruction of LHS SSM Wall in V-100 Primary valley in between 3300 to 3400m in Pkalipuram in w.N-21 Vrishabhavathi Valley Package-1 |
667 |
000-10-N-J-N-D-FO-040 |
|
Improvements to footpath and providing drain covering slab for Nagarabavi 80€™ Road from IIPM junction to SWD (Vrishabhavathi Valley) |
668 |
000-10-N-J-N-D-FO-022 |
|
Construction of bridge by using pre cast segment for Primary SWD K-100 @ KH road KV in Bangalore city |
669 |
000-10-N-D-R-B-FO-002 |
|
Construction of compound wall infront of Govt. propertier from seeds certification to KAIC 1st gate |
670 |
000-10-M-P-J-R-MI-002 |
|
Painting to Roads and Humps in Sadashivnagar Area |
671 |
000-10-M-P-J-R-MI-001 |
|
Painting to Roads and Humps in Malleshwaram Area |
672 |
000-10- N-P-P-O-MI-089 |
|
Widening and Improvements to Dickenson Road from M.G.Road to Ulsoor Road |
673 |
000-09-NP-E-R-IM-014 |
|
Rehabilitation and Strenghthening of Rajivgandhi nagar main road Sunkadakatte from Ring road to 7th cross Ch:0 to 580m |
674 |
000-09-N-S-I-R-DS-001 |
|
Procurement of Precast RCC box segments of size 6.00x4.50x1.0m to CBI junction on Bellary road in btn Sanjayanagar and CBI junction |
675 |
000-09-N-S-I-R-CD-003 |
|
Providing Road Furnitures from BDA jn to Sanjaynagar jn and Thermo Plastic painting from 10 km (Byatarayanapura jn) to 12.5 km on LHS along International Airport Corridor |
676 |
000-09-N-S-I-R-CD-002 |
|
Pdg RPM fm 22km to 27km Thermo Plastic paint fm Highground to Windsor Manor over Hebbal Flyover and fm 8km to 10 km on LHS along Int National Airport Corridor |
677 |
000-09-N-S-I-R-CD-001 |
|
Pdg RPM Painting to Hebbal Flyover fm 7km to 8km Median Ptng Median Marker fm 14-27km along International Airport Corridor |
678 |
000-09-N-S-I-B-FO-001 |
|
Construction of Effluent treatment plant building in IVRI Campus near Sanjayanagar Junction. |
679 |
000-09-N-P-R-E-AS-017 |
|
Improvement & asphalting of KHB road from Railway level crossing to ORR |
680 |
000-09-N-P-P-O-MI-044 |
|
Detailed Project Report for improvements to the road connecting to SEZ from Outer Ring Road to Kempapura Road fom Ch:.00 km to 1.00km along Nagavara Tank Bund |
681 |
000-09-N-P-P-O-MI-036a |
|
Consultancy services for preparation of DPR for signal free corridor Along Dr. Rajkumar Road at 3rd Road Junction |
682 |
000-09-N-P-P-O-MI-036 |
|
Consultancy services for preparation of DPR for signal free corridor Along Dr. Rajkumar Road at 3rd Road Junction |
683 |
000-09-N-P-P-O-MI-034a |
|
Consultancy services for preparation of Detailed Project Report Conducting soil Investigation signal free corridor along Dr. Rajkumar Road-10th cross Jn |
684 |
000-09-N-P-P-O-MI-034 |
|
Consultancy services for preparation of Detailed Project Report Conducting soil Investigation signal free corridor along Dr. Rajkumar Road-10th cross Jn |
685 |
000-09-N-P-ER-WD-001 |
|
"Widening and Strengthing of Palace Road from Ch.0.0km to 1.73km ( Mysore Bank Circle to High Ground Police Station) in Banglore " |
686 |
000-09-N-P-E-R-WD-035 |
|
Removal of excavated muck & debris on Sheshadri road from Ch: 850.00 to 1200.00 Mtr. in Bangalore city |
687 |
000-09-N-P-E-R-WD-034. |
|
Providing footpath infront of freedom park(Old Central Jail) on Sheshadri Road |
688 |
000-09-N-P-E-R-WD-034 |
|
Providing footpath infront of freedom park(Old Central Jail) on Sheshadri Road |
689 |
000-09-N-P-E-R-WD-031 |
|
Dismantling of compound wall in the premises of Bangalore Turf club from Fire Station to Subbanna Circle |
690 |
000-09-N-P-E-R-WD-030 |
|
Construction of compound in front of UAS and GKVK qutrs near under pass in bellary road. |
691 |
000-09-N-P-E-R-WD-029 |
|
Widening and strengthening of sheshadr Road from Subbanna Circle to Fir Station to (Sub estimate for photography at site of work on Sheshadri Road Widening) |
692 |
000-09-N-P-E-R-WD-028 |
|
Removal of excavated musk and debrisat Maharani's College circle (Junction of Palace road and Sheshadri road) and towards Basaveshwara circle in Bangalore city |
693 |
000-09-N-P-E-R-WD-026 |
|
Widening of Tannery road (Dr.Ambedkar road) from madhava Modoliar to Ring road |
694 |
000-09-N-P-E-R-WD-025 |
|
Construction of Busbays on Nrupatunga road in Bangalore |
695 |
000-09-N-P-E-R-WD-013 |
|
Widening Strenthening of Kasturba Road |
696 |
000-09-N-P-E-R-WD-003 |
|
Widening and Strengthening of Sheshadri Road from Central Jail Junction to K.R.Circle ( Fire Station to K.R.Circle) |
697 |
000-09-N-P-E-R-WD-002 |
|
Wideninng and strengthing of Race Course road from Anandrao circle to Basaveshwara circle in Bangalore city |
698 |
000-09-N-P-E-R-IM-041 |
|
Rehabilitation and Strengthening of Alexander Road in Richmond Town area Ch:0.00 to 0.90Km ( From curley to wellington streetand its connecting Roads) |
699 |
000-09-N-P-E-R-IM-034 |
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 2.10 to 3.20 kms. |
700 |
000-09-N-P-E-R-IM-033 |
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 0.90 to 2.10 kms. |
701 |
000-09-N-P-E-R-IM-032 |
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 0.00 to 0.90 kms. |
702 |
000-09-N-P-E-R-IM-031 |
|
Rehabilitation and Strengthening of Jalahalli Road (East) Main Road from Jalahalli circle to Gangamma circle. Ch: 2.20 to 3.30 km. |
703 |
000-09-N-P-E-R-IM-029 |
|
Rehabilitation and Strengthening of Jalahalli Road (East) Main Road from Jalahalli circle to Gangamma circle. Ch: 0.0 to 1.20 km |
704 |
000-09-N-P-E-R-IM-028 |
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 1.10 to 3.0 km |
705 |
000-09-N-P-E-R-IM-027 |
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 0.9 to 1.10 km |
706 |
000-09-N-P-E-R-IM-026 |
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 0 to 0.9 km |
707 |
000-09-N-P-E-R-IM-025 |
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 3.0 to 4.20 km. |
708 |
000-09-N-P-E-R-IM-024 |
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 2.0 to 3.00 km. |
709 |
000-09-N-P-E-R-IM-023 |
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 0.90 to 2.0 km. |
710 |
000-09-N-P-E-R-IM-022 |
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 0.00 to 0.90 km |
711 |
000-09-N-P-E-R-IM-020 |
|
Rehabilitation and Strengthening of 1st cross road MC layout from Magadi Road to Chord Road |
712 |
000-09-N-P-E-R-IM-019 |
|
Rehabilitation and Strengthening of Service Road (Magadi Road) from Prashanthnagara Main Road to 1st Cross Govindarajnagara. |
713 |
000-09-N-P-E-R-IM-018 |
|
Rehabilitation and Strengthening of Road from 1st main Hampi Nagar to swimming pool Ch: 380 to 760m |
714 |
000-09-N-P-E-R-IM-017 |
|
Rehabilitation and Strengthening of Road from 1st main Hampi Nagar to swimming pool Ch: 0 to 380m |
715 |
000-09-N-P-E-R-IM-016 |
|
Rehabilitation and Strengthening of Road from Chord Road (from Bunts Sangha Community hall) to Chandra Layout Circle Ch: 0 to 950m |
716 |
000-09-N-P-E-R-IM-013 |
|
Rehabilitation and Strengthening of Mount Joy 50 feet road Srinagar from Mount Joy Road to K.R.Hospital Srinagar Ch: 0 to 1200m |
717 |
000-09-N-P-E-R-IM-012 |
|
Asphalting to 26th Main Road 4'T'block from 39th Cross Road Jayanagar to 32nd Cross Road Tilak Nagar. |
718 |
000-09-N-P-E-R-IM-011 |
|
Asphalting to 18th main Road 4'T' Block Jayanagar from 100 feet Ring Road to Oxford Specialist Clinic Jayanagar.Ch:0 to 960m |
719 |
000-09-N-P-E-R-IM-010 |
|
Rehabilitation and Strengthening of K.R.Road from Netkallappa Circle to Karnataka Medical Council Ch: 1125 to 1820m |
720 |
000-09-N-P-E-R-IM-009 |
|
Asphalting to K.R Road from V.V Pura College of Science to Karnataka Medical Council.Ch:315m to 1125m |
721 |
000-09-N-P-E-R-IM-008 |
|
Asphalting to K.R Road from KIMS hospital road to V V Pura College of Science and Vanivillas road from Vasavi Convention hall To Siddaiah Circle (Lalbagh west gate) |
722 |
000-09-N-P-E-R-IM-007 |
|
Asphalting to Armugum Circle Sri.S.Kariappa Road and B.P.Wadia Road from Pattalamma temple street to K.R Road. |
723 |
000-09-N-P-E-R-IM-006 |
|
Rehabilitation and Strengthening oof South End Road and Pattallamma temple street Basavanagudi from Surana College South End road to Armugum Circle. |
724 |
000-09-N-P-E-R-IM-005 |
|
Rehabilitation and Strengthening of South End Road from Nagasandra Circle to Surana College Ch: 0 to 700mts |
725 |
000-09-N-P-E-O-MI-10a |
|
Improvements to Palace Road : - Mysore Bank Circle to Choudaih road (High Grounds Police Station) |
726 |
000-09-N-P-E-O-MI-045a |
|
Rehabilitation and Strengthening of selected reaches kadugodanahalli main road from tannery road junction to ring road Ch:1.0 to 1.9km |
727 |
000-09-N-P-E-O-MI-043a |
|
Rehabilitation and Strengthening of Alexander Road in Richmond Town area Ch: 1.90 to 3.0km. (From Myrtel lane to Lalbagh road and its connecting roads) |
728 |
000-09-N-P-E-O-MI-035a |
|
Rehabilitation and Strengthening of Buddha Vihar Road and M.M.Road from Asay Road to M.M.Road Ch: 0 to 0.9km |
729 |
000-09-N-P-E-O-MI-017 |
|
Providing interiors and furnishing to the Ground 1st and 2nd floor of Major Road Zone office building at BBMP Premises. |
730 |
000-09-N-P-E-O-MI-015a |
|
Improvements to Hosur Main Road:- Road from Shooley Circle to Madivala Police Staion |
731 |
000-09-N-P-E-O-MI-015 |
|
Improvements to Hosur Main Road:- Road from Shooley Circle to Madivala Police Staion |
732 |
000-09-N-P-E-O-MI-014 |
|
Improvements to Road From Palace Road to Legidlative Brigade Road: - M.G. Road to Shooley Circle Museum Saint Mark's Road |
733 |
000-09-N-P-E-O-MI-013 |
|
Improvements to Kasturaba Main Road : - Hudson Circle to Mahathma Gandhi Mahathma Gandhi Road: - Mahathma Gandhi Circle to Trinity Circle |
734 |
000-09-N-P-E-O-MI-012 |
|
Improvements to Kumara Krupa Road : - Race Course Road to Sankey Race Course Road: - Ananda Rao Circle to Basaveshwara Circle |
735 |
000-09-N-P-E-O-MI-011 |
|
Improvements to Choudaih Road : - Basaveshwara Circle to Cauvery Jn.Ramanamaharshi Main Bellary Road Main Road: - Mekri Circle to upto Hebbal Flyover |
736 |
000-09-N-P-E-O-MI-010 |
|
Improvements to Palace Road : - Mysore Bank Circle to Choudaih road (High Grounds Police Station) |
737 |
000-09-N-P-E-O-MI-009a |
|
Improvements to Queen's Road : -Mahathma Gandhi Circle to Minsk Square :- Balekundri Circle to join Miller Miller Road :- aveshwara Circle to Contonment Railway Station |
738 |
000-09-N-P-E-O-MI-008a |
|
Improvements to Dr. Ambedkar Road: - Post Office road i.e Mysore Bank Circle to Balekundri Nrupathunga Road :- K.R. Circle to Police Corner |
739 |
000-09-N-P-E-O-MI-007a |
|
Improvements to Airport Road: -Road from Domlur to HAL main Factory |
740 |
000-09-N-P-E-O-MI-006a |
|
Improvements to Airport Road: -Road from Trinity Circle to Domlur |
741 |
000-09-N-P-E-O-MI-005a |
|
Improvements to Chowdiah Road: -Road from Basaveshwara Circle to Minsk Suare Cubbun Road:- From Minsk Square to M.G. Road L.H. Road:- Basaveshwara Circle to L.H |
742 |
000-09-N-P-E-B-FO-002 |
|
Construction of Compound in the premises of Karnataka Judicial Academy for widening of Race Course Road in Bangalore. |
743 |
000-09-N-P-E-B-FO-001 |
|
Construction of Compound in the premises of Bangalore Turf Club parking area for providing parking facilities to Chief Minister visitors vehicle on Race Course Road |
744 |
000-09-N-J-N-D-FO-183 |
|
Bed regrading and widening of SWD frm Mangammana Palya Near Hosure-Bangalore Highway to K-200 in Koramangala Valley P-3 |
745 |
000-09-n-j-n-d-fo-167 |
|
Construction of Retaining wall using RCC Pre-cast box of size 3.0x3.0x1.0mtrs in V. Valley on both side fromCH:9.25 to 9.30 Km with road in Vrishabavathi Valley. |
746 |
000-09-N-J-N-D-FO-019 |
|
Construction of RCC Bridge with Pile Foundation over SWD V-301 at Ch:2680mtr in Kamakya in Vrishabhavathi Valley Package-4 |
747 |
000-09-N-J-I-R-WD-004 |
|
Widening and Improvements of Hosur Luskar road |
748 |
000-09-N-J-I-R-WD-003 |
|
Construction of Compound wall infront of Khanija Bhavan on Race Course Road |
749 |
000-09-N-G-P-B-FO-001 |
|
Construction of Office Building (First & Second) for Major Roads Zone at BBMP Premises N.R.Square Bangalore. |
750 |
000-09-N-G-J-R-PR-004 |
|
Consultancy charges for preperation of DPR for Improvements to junctions in SOUTH Corridor. |
751 |
000-09-N-G-J-R-PR-003 |
|
Consultancy charges for preperation of DPR for Improvements to junctions in EAST Corridor. |
752 |
000-09-N-G-J-R-PR-002 |
|
Consultancy charges for preperation of DPR for Improvements to junctions in NORTH Corridor. |
753 |
000-09-N-G-J-R-PR-001 |
|
Consultancy charges for preperation of DPR for Improvements to junctions in WEST Corridor. |
754 |
000-09-N-G-J-R-MI-001a |
|
Consultancy serices for the preparation of DPR for Surface Parking in Indiranagar Banaswadi Kalyannagar Area. |
755 |
000-09-N-G-J-R-MD-062 |
|
Constructing High Raised Pedestrian Crossing in Sadashivanagar Museum Road Sheshadripuram Contonment Railway Station Area. |
756 |
000-09-N-G-J-R-MD-046 |
|
Providing Cast-in situ RCC medians near flat form road krishna floor mill road |
757 |
000-09-N-G-J-R-MD-044 |
|
Providing Cast-in situ RCC medians near Coffee Day junction Lavelle Road Museum Road and St Marks Road |
758 |
000-09-N-G-J-R-MD-043 |
|
Providing Cast in situ RCC medians in Macgrath Road Victoria Road Lower Agaram road and surrounding area |
759 |
000-09-N-G-J-R-MD-001 |
|
Estimate for providing Cast-in-situ RCC median of 0.5 mtr. Height in Mysore Road and South End Road. |
760 |
000-09-N-G-J-I-MI-006(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking InAdugodi Kormangala and Madivala Area |
761 |
000-09-N-G-J-I-MI-005(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking In High Grounds.R.TNagar Area |
762 |
000-09-N-G-J-I-MI-004(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking In Jayanagar Banashankri and J.P.nagar Area |
763 |
000-09-N-G-J-I-MI-003(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking In Malleshwaram Hebbal and Yelahanka Area |
764 |
000-09-N-G-J-I-MI-002(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking In Upparpet RajajinagarMagadi Road Kamakshipalya Area |
765 |
000-09-N-G-J-I-MI-001(1) |
|
Consultancy Services for preparation of DPR for the Surface Parking In Indiranagar Banaswadi Kalyannagar Area |
766 |
000-09-N-G-J-H-MI-006 |
|
Providing Surface Parking in Audugodi Koramangala Madiwala Area. |
767 |
000-09-N-G-J-H-MI-005 |
|
Providing Surface Parking in High Grounds R.T.Nagar Area. |
768 |
000-09-N-G-J-H-MI-004 |
|
Providing Surface Parking in Jayanagar Banashankari J.P.Nagar Area. |
769 |
000-09-N-G-J-H-MI-003 |
|
Providing Surface Parking in Malleshwaram Hebbal Yelahanka Area. |
770 |
000-09-N-G-J-H-MI-002 |
|
Providing Surface Parking in Upparpet Rajajinagar Magadi road Kamakshipalya Area. |
771 |
000-09-N-G-J-H-MI-001 |
|
Providing Surface Parking in Indiranagar Banaswadi Kalyannagar Area. |
772 |
000-09-N-G-J-H-IM-051 |
|
Improvements to Junction at O Form Junction OM Road NGEF Junction. |
773 |
000-09-N-G-J-H-IM-050 |
|
Improvements to Junction at Uma Theatre Junction Briyand Square Junction. |
774 |
000-09-N-G-J-H-IM-049 |
|
Improvements to Junction at Ulsoor Gate Police Station Nagasandra Circle Yediyur Circle Sanjay Gandhi Hospital Junction (Carmel Convent). |
775 |
000-09-N-G-J-H-IM-048 |
|
Improvements to Junction at East End Road - 45th Cross Road Junction Anepalya Laskar Road Junction Minerva Circle N. R. Square. |
776 |
000-09-N-G-J-H-IM-047 |
|
Improvements to Junction at KH Road - Siddiah Road Junction Mission Road Lalbagh Road Junction Hosur Road - Siddhapura Road Junction BMC Junction. |
777 |
000-09-N-G-J-H-IM-046 |
|
Improvements to Junction at In front of RBI Nrupatunga Road Kodlu Gate Junction Basavangudi Krishna Rao Junction Meenakshi Temple Junction. |
778 |
000-09-N-G-J-H-IM-045 |
|
Improvements to Junction at BTS Junction Wilson Garden 1st Cross- Sagar Apollo Junction Avenue Road Near Post Office. |
779 |
000-09-N-G-J-H-IM-044 |
|
Improvements to Junction at 12th Cross Junction Wilson Garden Vidyapeeta Circle Junction Dr. Ambedkar Junction K H Junction. |
780 |
000-09-N-G-J-H-IM-043 |
|
Improvements to Junction at 28th Main Jayanagar 29th BTM Road Junction 18th Main Marenahalli Petrol Bunk 10th Cross Junction Wilson Garden. |
781 |
000-09-N-G-J-H-IM-042 |
|
Improvements to Junction at Kanakapur Road Konankunte Junction Shivashankarappa Circle Arakere Gate Hulimavu Junction. |
782 |
000-09-N-G-J-H-IM-041 |
|
Improvements to Junction at Poornima Junction RRMR Junction Ramakrishna Ashram Junction Banashankari Ring Road NCERT Junction. |
783 |
000-09-N-G-J-H-IM-040 |
|
Improvements to Junction at K R Road and B P Wadia Road Junction Vani Vilas Road and Shankarmutt Road Junction K R Road Junction SJP Road Junction. |
784 |
000-09-N-G-J-H-IM-039 |
|
Improvements to Junction at J P Nagar 24th Main-9th Cross Junction Puttanna Junction K R Road and Bharathi Nursing Home Junction K R Road and D M Road Junction. |
785 |
000-09-N-G-J-H-IM-038 |
|
Improvements to Junction at Sagar Theatre Junction Nagarbavi Circle 5th Main Road - Chord Road Junction. |
786 |
000-09-N-G-J-H-IM-037 |
|
Improvements to Junction at Veeresh Talkies Junction Dr. Raj Kumar Road 17th Cross Junction Kempegowda Circle Krishnanada Nagar Circle. |
787 |
000-09-N-G-J-H-IM-036 |
|
Improvements to Junction at Rajajinagar 12th Main and 41st Cross Junction Binny Mill Junction ASR Char Street - Mysore Road Junction . |
788 |
000-09-N-G-J-H-IM-035 |
|
Improvements to Junction at Dr raj kumar raod-Rajarajeshwari Kalyana Mantapa junction Dr raj kumar stone Bridge junction Rajajinagar 12th Main and 50thCross |
789 |
000-09-N-G-J-H-IM-034 |
|
Improvements to Junction at B B Road Bagalur Cross B B Road NES Junction Sheshadripuram College Junction Dr. TCM Royan Road Mill Road Junction. |
790 |
000-09-N-G-J-H-IM-033 |
|
Improvements to Junction at B B Road Amruthahalli Cross Junction B B Road Allasandra Byepass Junction B B Road Santhe Circle B B Road Kogilu Cross Junction. |
791 |
000-09-N-G-J-H-IM-032 |
|
Improvements to Junction at Dr. Raj Kumar Road 10th Cross Junction Dr. Raj Kumar Road near Mani Complex B B Road Kempapur Cross Junction. |
792 |
000-09-N-G-J-H-IM-031 |
|
Improvements to Junction at Satellite Terminal Junction ESI Junction B. B. Road Binny Mill Junction B B Road Kodigehalli Cross Junction. |
793 |
000-09-N-G-J-H-IM-030 |
|
Improvements to Junction at Peenya 2nd Stage Bus stand Yamalur Junction Mysore Road near KSRTC Bus Stand Old Police Station Junction. |
794 |
000-09-N-G-J-H-IM-029 |
|
Improvements to Junction at Swastik Junction Maramma Temple Junction Maruthi Circle Vilnayaka Circle. |
795 |
000-09-N-G-J-H-IM-028 |
|
Improvements to Junction at Tumkur Road Marappana Palya Junction 5th Main RPC Layout Junction Modi Hospital Junction Dr. Raj Kumar Road and Chord Road junction. |
796 |
000-09-N-G-J-H-IM-027 |
|
Improvements to Junction at Ring Road BDA Junction Basavamantapa Junction Dt. TCM Royan Road near Ambedkar Statue Peenya 2nd Stage 14th Cross Junction. |
797 |
000-09-N-G-J-H-IM-026 |
|
Improvements to Junction at 14th Main Chandra Layout Junction Chandra Layout near Water Tank Junction Sunkadakatte - Hegganahalli Junction Ring Road Ullal Junction. |
798 |
000-09-N-G-J-H-IM-025 |
|
Improvements to Junction at Maharani College Circle CID and COD Junction Basweshwara Circle Sheshadri Road and BVK Iyengar Road Junction |
799 |
000-09-N-G-J-H-IM-024 |
|
Improvements to Junction at Palace Cross Junction Sampige Theatre Junction Malleshwaram Link Road Junction Karnataka Circle |
800 |
000-09-N-G-J-H-IM-023 |
|
Improvements to Junction at Jalahalli Cross Junction TVS Cros Junction Tata Circle Highground Junction. |
801 |
000-09-N-G-J-H-IM-022 |
|
Improvements to Junction at Chandrika Junction Chandni Chowka Guttahalli Circle Hanes Junction. |
802 |
000-09-N-G-J-H-IM-021 |
|
Improvements to Junction at GPO Junction Coffee Board Junction Indian Express Junction Minsk Square. |
803 |
000-09-N-G-J-H-IM-020 |
|
Improvements to Junction at Near Cottonpet Police Station Janathadal Junction RT Nagar Main Road-Taralabalu Junction New BEL Road Devasandra Junction . |
804 |
000-09-N-G-J-H-IM-019 |
|
Improvements to Junction at Kammanahalli Junction Ulasappa Circle Sivananda Circle. |
805 |
000-09-N-G-J-H-IM-018 |
|
Improvements to Junction at Mico Bande Junction Cottonpet Road - Mill Road Junction . |
806 |
000-09-N-G-J-H-IM-017 |
|
Improvements to Junction at 18th Main Junction - Abhinaya Junction Shankaranagar Mian Road APMC Yard Junction. |
807 |
000-09-N-G-J-H-IM-016 |
|
Improvements to Junction at Rajajinagar 17th Main and 41st Cross Junction MKK Road MD Block Junction Hesarughatta Road Bagalugunte Cross Devasandra Cross. |
808 |
000-09-N-G-J-H-IM-015 |
|
Improvements to Junction at RT Nagar Police Station Junction Jayamahal Road Jayamahal Circle Margosa Road 18th Cross Junction Sampige Road Mill Corner Junction . |
809 |
000-09-N-G-J-H-IM-014 |
|
Improvements to Junction at BDA Junction 8th Main- Chatram Road - Near Sheshadripuram Police Station. |
810 |
000-09-N-G-J-H-IM-013 |
|
Improvements to Junction at Forum Junction 80 Feet Road and Memoor Masjid Junction Maharaja Junction Aishwarya Junction - on Sarjapur Road. |
811 |
000-09-N-G-J-H-IM-012 |
|
Improvements to Junction at OMR - Byappanahalli Junction CMH Road 100 feet Road Junction Sarjapur Road - 24th Main Road Junction CMH Road 80 Feet Road Junction. |
812 |
000-09-N-G-J-H-IM-011 |
|
Improvements to Junction at Mayo Hall junction Halsur Bus Depo Junction Hosur Road Campbell Road Junction Lower Agram-Ejipura Junction. |
813 |
000-09-N-G-J-H-IM-009 |
|
Improvements to Junction at OM Road SG Palya Junction Outer Ring Road near Multiplex Theatre Junction Outer Ring Road near Kadu Beesana Halli Junction. |
814 |
000-09-N-G-J-H-IM-008 |
|
Improvements to Junction at Main Guard Cross Road and Cubbon Road BMTC Depot Circle OM Road Benniganahally Junction. |
815 |
000-09-N-G-J-H-IM-007 |
|
Improvements to Junction at Anjaneya Temple - SV Road Junction Old Madras Road - 80 Feet Road Junction Old Madras Road - NGEF Junction Kasturinagar Junction. |
816 |
000-09-N-G-J-H-IM-006 |
|
Improvements to Junction at Nanjappa circle Anepalya Junciton Garuda Mahal Juntion CB Road Airport Junction. |
817 |
000-09-N-G-J-H-IM-005 |
|
Improvements to Junction at Adarsha Junction Halsuru Road and Dickenson Road Junction Thamari Kannan and Murthy Road Junction Cambel RoadJunction. |
818 |
000-09-N-G-J-H-IM-004 |
|
Improvements to Junction at Sindhi Colony Junction Devraj Urs Truck Terminal Junction NTTF Junction Sukh Sagar Junction |
819 |
000-09-N-G-J-H-IM-003 |
|
Improvements to Junction at Indiranagar ESI Hospital junction Bamboo Bazaar Circle St. Johns church road war memorial circle Mosque Road - MM Road Junction. |
820 |
000-09-N-G-J-H-IM-002 |
|
Improvements to Junction at Mother theresa junction Gopalgowda circle Arts and crafts circle Begaum mahal junction. |
821 |
000-09-N-G-J-H-IM-001 |
|
Improvements to Junction at Koramagala 1st block 7th main junction Domlur water tank junction D'souza Circle Palmgrove Junction. |
822 |
000-09-N-G-I-R-WD-001 |
|
Widening and improvements to J ayamahal Road in Bangalore (From Mekhri Circle to Contwnment Railway Station) |
823 |
000-09-N-G-I-R-UP-027 |
|
Extention of pedestrain subway for turf club on Race course road |
824 |
000-09-N-G-I-R-UP-024 |
|
Frmtnof trnch lwrng the RCCPrcst bx sgmnts prprtn of bed and othr alld wrks for pdstrnundrps acrs Plce Rd nr BsveswraCrcl Sophia clge is shftd to Nrptnga rd nr Scnce clge |
825 |
000-09-N-G-I-R-UP-023 |
|
Formation of trench lowering the segments preparation of bed and other allied works for pedestrian underpass towards Vasantha Nagara near Basaveshwara Circle. |
826 |
000-09-N-G-I-R-UP-022 |
|
Formation of trench lowering the segments preparation of bed and other allied works for pedestrian underpass towards vidhana soudha near Basaveshwara circle |
827 |
000-09-N-G-I-R-UP-021 |
|
Formation of trench lowering the segments preparation of bed and other allied works of Underpass at Maharani's College junction. |
828 |
000-09-N-G-I-R-UP-020 |
|
Formation of trench for lowering the segments and allied works for pedestrian subway near Hebbal Police Station on Bellary road |
829 |
000-09-N-G-I-R-UP-019 |
|
Procurement and errection of rcc precast box segments of 3x2.2x1m for approach ramps of underpass at Balabroohie junction across sankey road shifted to KR circle |
830 |
000-09-N-G-I-R-UP-018 |
|
Frmtn of trnch lwring the RCCPrcst bx sgmnts prepratn of bed and othr ald wrksfor pdstrn undrps acrs Rajbvn Rcecrs rd nr Bsvswra Crcl shftd to Nrptnga rd nr Mrthas Hsptal |
831 |
000-09-N-G-I-R-UP-016 |
|
Formatn of trench lowering the segments preparation of bed and other allied works of vehicular underpass at Balabroohie junction across Sankey road Shifted to K.R Circle |
832 |
000-09-N-G-I-R-UP-015 |
|
Procurement and errection of rcc precast box segments of 3x2.2x1m for approach ramps of underpass at junction of Maharanis college |
833 |
000-09-N-G-I-R-UP-014 |
|
Procurement of RCC Pre-cast box segments of 6.0mx4.50mx1.0m for vehicular underpass at Balabroohie junction across Sankey Road (Shifted to K.R Circle) |
834 |
000-09-N-G-I-R-UP-013 |
|
Construction of Approach ramps and crash barrier of vehicular underpass at Balabroohie junction across Sankey road Shifted to K.R Circle |
835 |
000-09-N-G-I-R-UP-012 |
|
Procurement of RCC Pre-cast box segments of 6.00mx4.50mx1.0m for Vehicular underpass at Maharani€™s College junction |
836 |
000-09-N-G-I-R-UP-011 |
|
Construction of Approach Ramps and Crash Barriers of Underpass at Maharani's College junction |
837 |
000-09-N-G-I-R-UP-008 |
|
Formation of trench lowering the segments preparation of bed and other allied works of Underpass at Sanjayanagar junction |
838 |
000-09-N-G-I-R-UP-006 |
|
Formation of trench for lowering the segments and other allied works for pedestrian underpass across Sankey road at Balabroohie junction (Shifted to SJP College) |
839 |
000-09-N-G-I-R-UP-005 |
|
Procurement of pre-cast Box segment of size 3.0x3.0x1.0m for Pedestrian crossings near Vidhana Soudha |
840 |
000-09-N-G-I-R-UP-003 |
|
Procurement and errection of rcc precast box segments of 3x2.2x1m for approach ramps of underpass at Sanjayanagar junction |
841 |
000-09-N-G-I-R-UP-002 |
|
Construction of Approach Ramps and Crash Barriers of Underpass at Sanjayanagara junction |
842 |
000-09-N-G-I-R-UP-001 |
|
Formation of trench for lowering the segments and other allied works for pedestrian subway near Sanjayanagar junction on Bellary road |
843 |
000-09-N-G-I-R-AS-001 |
|
Asphaltin to Tumkur Road(S.R. Road) Southren Seid from Yeshwanthpura Railway Station to NHAI limits(KLE Dental College) Ch.1330M to 1840m |
844 |
000-09-M-P-E-R-IM-030 |
|
Rehabilitationa and Strengthening of Jalahalli Road (East) main road from Jalahalli circle to Gangamma circle Ch. 1.20 to 2.20Km. |
845 |
000-09-M-P-E-R-AS-051 |
|
Asphalting to service road of West of chord road from Industrial town to ESI Hospital road. |
846 |
000-09-M-P-E-R-AS-050 |
|
Asphalting to W.O.C from Manjunathnagar 1st main to 10th cross WOC Road 2nd Stage |
847 |
000-09-M-P-E-R-AS-049 |
|
Asphalting to W.O.C from National School to ESI Hospital Road |
848 |
000-09-M-P-E-R-AS-048 |
|
Asphalting to W.O.C from 10th Cross WOC 2nd Stage to 12th Cross GD Naidu Hall |
849 |
000-09-M-P-E-R-AS-047 |
|
Asphalting to West of chourd road From Manjunathanagara 1st main to 12th cross 1st block Rajajinagara |
850 |
000-09-M-P-E-R-AS-045 |
|
Asphalting to 100 feet road(ORR) From Surana College to Railway Bridge |
851 |
000-09-M-P-E-R-AS-044 |
|
Asphalting to 100 feet (ORR) Road from Hoysala Circle to Surana College(Item No.13) |
852 |
000-09-M-P-E-R-AS-043 |
|
Asphalting to 100 feet (ORR)road from IBP Petrol Bunk to Hoysala Circle (Western Side) Item No.12 |
853 |
000-09-M-P-E-R-AS-042 |
|
Asphalting to 100 feet(ORR) road from IBP Petrol bunk to Hoysala Circle(Eastern Side) Item No.11 |
854 |
000-09-M-P-E-R-AS-041 |
|
Asphalting to 100 feet (ORR)road fromVVS Science and Management College to I B P Petrol bunk(Western side) |
855 |
000-09-M-P-E-R-AS-040 |
|
Asphalting to 100 feet (ORR)road from VVS Science and Management College to I B P petrol bunk(Eastern side) |
856 |
000-09-M-P-E-R-AS-039 |
|
Asphalting to ORR(100 Feet) road from SVK Kalyana mantapa to VSS Science and Management College(West side) |
857 |
000-09-M-P-E-R-AS-038 |
|
Asphalting to ORR(100 FEET) from SVK Kalyana Mantapa to VSS Science and Management College(Eastern side) |
858 |
000-09-M-P-E-R-AS-037 |
|
Asphalting to100 feet road from Ambedkar College to SVK Kalyana mantapa(West side) |
859 |
000-09-M-P-E-R-AS-036 |
|
Asphalting to road from Ambedkar college to SVK KALYANA MANTAPA(Eastern side) |
860 |
000-09-M-P-E-R-AS-035 |
|
Asphalting to 100 feet ring road from MetroGranite/Umiya trading centre to Ambedkar college (Western side) |
861 |
000-09-M-P-E-R-AS-034 |
|
Asphalting to100 feet ring road from Metro Granite/Umiya trading centre to Ambedkar college (Eastern side) |
862 |
000-09-M-P-E-R-AS-033 |
|
Asphalting to 100 feet ring road from Magadi main road to Metro Granite/Umiya trading centre(Western side) |
863 |
000-09-M-P-E-R-AS-032 |
|
Asphalting to 100 feet road from Magadi main road to Metro granite/Umiya Trading centre(Eastern side) |
864 |
000-08-NJIR-AS-062 |
|
Consultancy service for construction super vision and project management of arterial and sub-Arterial Roads in Bangalore |
865 |
000-08-N-S-I-R-UP-041 |
|
Lowering the segments preparation of bed other allied works for Surface pass near BDA Office Junction |
866 |
000-08-N-S-I-R-UP-040a |
|
Lowering the segments preparation of bed and other allied works for pedestrian crossing near CBI junction |
867 |
000-08-N-S-I-R-UP-040 |
|
Lowering the segments Preparation of bed other allied works for pedestrian crossing near C.B.I Junction. |
868 |
000-08-N-S-I-R-UP-022 |
|
Formation of trench for lowering the segments preparation of bed and other allied works for R.C.C Pre-cast subway at C.B.I Junction |
869 |
000-08-N-S-I-R-AS-001 |
|
Providing asphalting to Main Carriage Way on Bellary road at CBI juction |
870 |
000-08-N-P-E-R-WD-030 |
|
Construction of compound wall infront of Govt. prop Veternary hospital front premision in Bellary Road M/s Ramachandra Construction No.411 RWD quarters yelahanka |
871 |
000-08-N-P-E-R-IM-065 |
|
Asphalting to Tumkur Road (S.R.Road) Southern Seid from Yeshwanthapur Railway Station to NHAI Limits (KLE Dental Colleage) Ch. 630M.to 1330m |
872 |
000-08-N-P-E-R-IM-064 |
|
Asphalting to Tumkur road(S.R road) Southern side from Yeshwanthpur Railwy Station to NHAI Limits (KLE Dental College) Ch.0 to 630M. |
873 |
000-08-N-J-R-WD-033a |
|
Providing consultancy Services for Preparation of Detailed Project Report (DPR)for Improvements to Major Road Special (High Density Corridors) |
874 |
000-08-N-J-R-WD-033 |
|
Providing consultancy Services for Preparation of Detailed Project Report (DPR)for Improvements to Major Road Special (High Density Corridors) |
875 |
000-08-N-J-P-R-CD-015 |
|
Providing entry and exit approaches at the junction of Ramanashri & Cunningham road |
876 |
000-08-N-J-P-R-CD-010 |
|
Providing asphalting to approach ramps to underpass at the junction of Cunningham and Ramanashri Road |
877 |
000-08-N-J-P-R-CD-008 |
|
Formation of trench for lowering the segments Construction of underpass at the junction of Ramanashri and Cunningham road |
878 |
000-08-N-J-P-R-CD-005 |
|
Construction of RC Wall and Ramp in front of I.V.R.I on Bellary Road |
879 |
000-08-N-J-P-R-CD-004 |
|
Formation of trench for lowering the segments pedestrian subway at Anandanagar Junction on Bellary road |
880 |
000-08-N-J-N-D-IM-002 |
|
DISMANTLING OF RCC COVERED SLAB AND COLUMS THE OVER THE SWD IN NATIONAL GAMES VILLAGE JAKKASANDRA MAIN ROAD IN KORAMANGALA |
881 |
000-08-N-J-I-R-WD-033a |
|
Hiring Consultancy for preparation of DPR for Improvements of Major Roads |
882 |
000-08-N-J-I-R-WD-029 |
|
Constructin of service road on western side of Bellary road near Veternary hospital Bangalroe |
883 |
000-08-N-J-I-R-WD-028 |
|
Providing Barricading to Bellary road Ch.5.50km to 7.33km in Bangalore City |
884 |
000-08-N-J-I-R-WD-024 |
|
Improvement and Widening of Hosur Road from Central Silk Board Junction to Yankey Factory Junction |
885 |
000-08-N-J-I-R-WD-023 |
|
Providing Utility Ducts and chambers for BESCOM and other utility cables in Sheshadri Road from Anand Rao Circle Fly Over to K.R.Circle on LHS in Bangalore city. |
886 |
000-08-N-J-I-R-WD-022 |
|
Providing Utility Ducts and chambers for BESCOM and other utility cables in Sheshadri Road from Anand Rao Circle Fly Over to K.R.Circle on RHS in Bangalore city. |
887 |
000-08-N-J-I-R-WD-014 |
|
Dismantling and widening of Goodshed road from Railway compound to circle on T.C.M.Royan Road |
888 |
000-08-N-J-I-R-WD-013a |
|
Asphalting and improvements to IVRI premises in Bellary road |
889 |
000-08-N-J-I-R-WD-013 |
|
Widening and Improvements to Bellary road from Ch1.8kmto 2.0km in BAngalore city |
890 |
000-08-N-J-I-R-WD-012 |
|
Widening and Improvements to Bellary road from Ch.1.60km to 1.80km in Bellary road |
891 |
000-08-N-J-I-R-WD-011 |
|
Widening and improvements to Bellary road from Ch. 1.40km to 1.60km in Banglore city |
892 |
000-08-N-J-I-R-WD-010 |
|
Widening and Improvements to bellary road from ch1.2km to 1.4km in Banglore city |
893 |
000-08-N-J-I-R-WD-008 |
|
Widening and improvements to Bellary road in Bangalore from Windsor mannor bridge to Hebbal fly over |
894 |
000-08-N-J-I-R-WD-004 |
|
Cosntruction of hard rock and providing RCC precost drain in Widening portion of Bellary road from 5.35km to 7.33km on western side |
895 |
000-08-N-J-I-R-WD-003 |
|
Construction of hard rock and providing RCC pre cost drain in widening portion of Bellary road from 5.35km to 7.33 km on Eastern side. |
896 |
000-08-N-J-I-R-WD- 021 |
|
Providing utility cable ducts and Chambers for BESCOM and other utility cables in Race Course Road from 0.00km to 1.66km on North side |
897 |
000-08-N-J-I-R-WD- 020 |
|
Providing utility cable ducts and Chambers for BESCOM and other utility cables in Race Course Road from 0.30km to 1.60km on South side |
898 |
000-08-N-J-I-R-MI-001 |
|
Providing sign boards to Bellary road from Minsk Square to Hebbal fly over (Ch.0.000km to 7.33km ) in BAngalore city |
899 |
000-08-N-J-I-R-AS-094 |
|
Asphalting to Sultan Palya Main Road from Manaranyapalya to Vishwanathanaganahalli Ch1200 to 2000m |
900 |
000-08-N-J-I-R-AS-089a |
|
Detailed Estimate for asphaltin to HAL road fron Jeevan Bheema Nagar road to Airport. |
901 |
000-08-N-J-I-R-AS-086 |
|
Asphalting to Nitturu Srinivas road and M.N.K park road from SouthEnd Road to Armugum Circle |
902 |
000-08-N-J-I-R-AS-082 |
|
Asphalting to 1st Main Road 1st Block Kormangala to Jakkasandra cross road - Chainage 450 to 900m |
903 |
000-08-N-J-I-R-AS-081 |
|
Asphalting to 1st Main Road 1st Block Kormangala to Jakkasandra cross road - Chainage 0 to 450m |
904 |
000-08-N-J-I-R-AS-080 |
|
Asphalting to Adgodi Road from Bannerghatta road to Hosur Road |
905 |
000-08-N-J-I-R-AS-079 |
|
Asphalting to Yediyur Road from J.S.S Circle to South End Road. |
906 |
000-08-N-J-I-R-AS-078 |
|
Asphalting to Road from Banashankri bus depot to J.S.S Circle |
907 |
000-08-N-J-I-R-AS-077 |
|
Asphalting to Kanakapura Main Road from Gangadhara nagara 4th main road to Banashankri temple Chainage 600m €“ 1200m |
908 |
000-08-N-J-I-R-AS-075 |
|
Asphalting to 4th Main Road from 38th Cross Road to 40th cross road Chainage : 800 to 1600m |
909 |
000-08-N-J-I-R-AS-074 |
|
Asphalting to 4th Main Road from Diagonal Road to 38th Cross Road Chainage : 0 to 800m |
910 |
000-08-N-J-I-R-AS-058 |
|
Asphalting to Tumkur road (Service Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Chainage 2201m to 3200m |
911 |
000-08-N-J-I-R-AS-057 |
|
Asphalting to Tumkur road (S.R Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Chainage 1101m to 2200m |
912 |
000-08-N-J-I-R-AS-056 |
|
Asphalting to Tumkur road (S.R Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Ch.0.0 to 1100m |
913 |
000-08-N-J-I-R-AS-055 |
|
Asphalting to11th Main Road Malleshwaram From Srirampura Road Bridge to Nirmala Rani School ( Chitrashilpi Venkatapura Road) |
914 |
000-08-N-J-I-R-AS- |
|
Asphalting to 1st Main Road 1st Block Kormangala to Jakkasandra cross road - Chainage 900 to 1350m |
915 |
000-08-N-G-J-R-WR-001 |
|
Construction of compound wall infront of Govt Properties on Hosur Luskar road from CSB Junction to Richmond Road. |
916 |
000-08-N-G-J-R-WD-010 |
|
Construction of compound wall infront of Government Properties in Sheshadri Road |
917 |
000-08-N-G-J-R-WD-009 |
|
construction of compound infront of Gvt. properties in HMT Bhavan to Hebbal flyover (RHS) (15.00-6.60km) |
918 |
000-08-N-G-J-R-WD-008 |
|
Construction of Compound infront of Govt Properties on Chowdaiah road from Rajbhavan Circle to High ground Police Station |
919 |
000-08-N-G-J-R-WD-004 |
|
Construction of compound infront of Government properties on Rajbhvan road from minsk square to Rajbhavan circle of Bellary road |
920 |
000-08-N-G-J-R-WD-002 |
|
construction of compound wall in size stone Masomy infront of KSSCA KAIC and other on Wester side of Bellary road. |
921 |
000-08-N-G-J-R-BB-023 |
|
Construction of Bus Bays at SJP College opposite DIG Office towards extention Harischandra ghat (Right Side) |
922 |
000-08-N-G-J-R-BB-021 |
|
Construction of Bus Bays at Jalahalli Cross Hosur Road towards extention CV Raman Road Tata Institute towards extention Agara towards Extention. |
923 |
000-08-N-G-J-R-BB-019 |
|
Construction of Bus Bays at Sarayipalya (Vidyanagara) towards City Hennur Cross towards Extention Hennur Cross towards City Jyothi School towards Extention. |
924 |
000-08-N-G-J-R-BB-018 |
|
Construction of Bus Bays at Marath Hally near Bridge Heggadenagar towards Extention Heggadenagar towards City Sarayipalya (Vidyanagara) towards Extention. |
925 |
000-08-N-G-J-R-BB-017 |
|
Construction of Bus Bays at Towards Extention Singaiana palya towards ITPL KR Puram Railway Station towards ITPL Marath Hally near Banyan Tree. |
926 |
000-08-N-G-J-R-BB-016 |
|
Construction of Bus Bays at Hope From towads ITPL L/S Hope From towads Whitefield R/S Satyasai Baba Hospital towards city Hoodi towards ITPL |
927 |
000-08-N-G-J-R-BB-015 |
|
Construction of Bus Bays at NH Flyover KR Puram towards IT PB Junction Hosakote towards city Hope Form towards Channasandra. |
928 |
000-08-N-G-J-R-BB-014 |
|
Construction of Bus Bays at Avalahalli towards Hosakote Avalahalli Towards city Boodigere cross towards Hosakote Boodigere cross Towards city. |
929 |
000-08-N-G-J-R-BB-013 |
|
Construction of Bus Bays at Tambuchetty palya Jn towards extention Opp. Side towards city Medahalli towards Hosakote Medahalli Towards city |
930 |
000-08-N-G-J-R-BB-012 |
|
Construction of Bus Bays at ITI Colony gate ( KR Puram) Opp. Towards bridge KR Puram bus stop KR Puram sante towards city. |
931 |
000-08-N-G-J-R-BB-010 |
|
Construction of Bus Bay at while going towards city KNS Technical College Towards Extension KNS Technical College Towards city lalbagh West gate towards Jayanagar |
932 |
000-08-N-G-J-R-BB-009 |
|
Construction of Bus Bay at Lalbagh Main gate towards double road Kengeri - Milesandra Gate Mysore Road Jayanagar 4th Main 22nd Cross Both Side towards J.P. Nagar |
933 |
000-08-N-G-J-R-BB-008 |
|
Construction of Bus Bay at Opp. to K.C. General Hospital. (Malleshwaram) Stop on NH4 Ballary Road near Veterinary Hospital. |
934 |
000-08-N-G-J-R-BB-007 |
|
Construction of Bus Bay at Shankar Matt Vivekananda Park Basaveshwara Nagar West of Chord Road opp to Chandra Layout near Petrol Bunk opp to Karthik Caps. |
935 |
000-08-N-G-J-R-BB-006 |
|
Construction of Bus Bay at Varthur Road east of Yamlur Road Frazer Town towards Extention Frazer Town towards City. |
936 |
000-08-N-G-J-R-BB-005 |
|
Construction of Bus Bay at Old Madras Road benniganahally Ulsoor-near Domalur (Left Side) Varthur Road near HAL Police Station. |
937 |
000-08-N-G-J-R-BB-004 |
|
Construction of Bus Bay at Circle Banaswadi Road IOC Bus Stop Kammana Nagara Channasandra Railway Bridge |
938 |
000-08-N-G-J-R-BB-003 |
|
Construction of Bus Bay at Richmond Road bus stop Hosur Road - Near Jhonson Market Bus Stand Hosur Road - Anepalya Bus Stop Pottery Road behind East Railway Station |
939 |
000-08-N-G-J-R-BB-001 |
|
Construction of Bus Bay at 80' Road Indiranagar Kodihalli NGEF Bus Stop Benniganahalli (new bus stop) Opposite apartment compound wall towards city. |
940 |
000-08-N-G-J-I-R-WD-030 |
|
Formation of service road near CBI junction (Eastern side) |
941 |
000-08-N-G-I-R-WD_001 |
|
Construction of compound wall infront of IVRI State semen center PDBiological Control and others IAH and VB of Bellary road. |
942 |
000-08-N-G-I-R-WD-001 |
|
construction of compound wall infront of IVRR westurn side state seme center PD Biological control and other of Bellary road |
943 |
000-08-N-G-D-B-FO-001a |
|
Construction of 1st and 2nd Floor oOfficebuilding for Major Roads zone at BBMP Premises |
944 |
000-08-N-G-D-B-FO-001 |
|
Construction of Office Building for Major Roads Zone at BBMP Premises N.R. Square Bangalore (Stilt and Ground Floor) |
945 |
000-08-N--J-R-WD-004 |
|
construction of hard rock and providing RCC precost drain in widening Position of Bellary road from 5.35km to 7.33km on Eastern Side |
946 |
000-08-I-O-J-B-FO-001 |
|
Re-location of HQTC campous Bundary Wall along C.V. Raman Road.(Widening of Road in Military Land) |
947 |
000-08-I-J-I-R-SV-001 |
|
Hiring of consultancy services for preparation of JNNURM complaint DPR for HQUR road network in new zones of BBMP - pack I and V - dasarahalli and Byatranyapura |
948 |
000-08-I-G-J-R-MI-003 |
|
Road marking with Hot applied thermoplastic compound and road studs with lense reflector at underpass (work shifted to anandnagar and hebbal junction) |
949 |
000-08-I-G-J-R-MI-001 |
|
Road marking with Hot applied thermoplastic compound and road studs with lense reflector at underpass BDA junction (work shifted to CBI) |
950 |
000-07-N-S-J-R-RL-006 |
|
providing barricadingat junctionsin basavanagudi traffic police zone in bangalore city |
951 |
000-07-N-S-J-R-RL-005 |
|
Providing Barricading at Junctions in High Grounds Traffic Police Zone in Bangalore City. |
952 |
000-07-I-G-J-R-WD-002 |
|
Relocation of Command Hospital Boundary Wall along Air Port Road (by Widening / Improvements to curve portion using Military Land) |
953 |
000-06-N-D-J-R-FO-001 |
|
Construction of Bus Bays in Airport and Frazer Town Corridor under Package-I |
954 |
"Administrator Vide resolution 1237/ 200 |
|
Widening of Asphalted surface and construction of RCC Drain Utility Duct and formation of Footpath From NAGAVARA JUNCTION TO BELLAHALLI CROSS VIA Thanisandra. Chainage. |
955 |
201-09-N-S-E-R-WD-001 |
|
Strenthening widening and Asphalting of thirteen selected Arterial/sub arterial roads in Bytarayanapura zone Dasarahalli Zone and Mahadevapura Zone under PackageII |
956 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and Asphalting of Tayappa Garden Road |
957 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and Asphalting of Road from Anjanapura to Thalagattapuara. |
958 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and Asphalting of Nyanappanahalli Road. |
959 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and Asphalting of Hosur Road to Begur Road via AECS Layout |
960 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and Asphalting of Doddakammanahalli road (from Bannerghatta road via Hulimavu Police station) |
961 |
201-09-N-S-E-R-WD-001 |
|
Strengthening Widening and asphalting of Arekere main road(via Arekere) |
962 |
021-09-N-G-E-R-CD-012 |
|
Rehabilitation and Strengthening of Road from Chandra Layout Circle to Nagarabhavi Circle Ch;0.00 to 0.75 Km |
963 |
021-09-N-G-E-R-CD-012 |
|
Rehabilitation and Strengthening of Road from Chandra layout Circle to Nagarabavi Circle Ch:0.00 to 0.75 Km |
964 |
000-10-N-P-R-O-MI-004 |
|
Providing of MS Grills infront of KSSCA KAIC KSACP.KSACP quaters |
965 |
000-10-N-P-R-O-MI-004 |
|
Providing of MS Grills infront of KSSCA KAIC KSACP KSACP quarters |
966 |
000-10-N-P-R-E-WD-065 |
|
Widening and improvements to Banasawadi road from Ch:2.00 km to 3.00km in Banglore City |
967 |
000-10-N-P-R-E-WD-065 |
|
Providing base course and road furniture for widening of road from milk parlour on Race Course road to join Sheshadri road at Subbanna circle in bangalore city. |
968 |
000-10-N-P-R-E-WD-033 |
|
Construction of Compound Infront of KPSC property from Park house road to atria hotel in Palace Road |
969 |
000-10-N-P-R-E-UP-018 |
|
Lowring of RCC precast box segmnts and constrction of Staircse and alied works at pedestrn underpass across Vittal Mallya rd near T Siddalingaih circle Shftd to Cubbon Rd |
970 |
000-10-N-P-R-E-UP-018 |
|
Lowring of RCC precast box segmnts and constrction of Staircase and allied works at pedestrian underpass across Vittal Malya rd near TSiddalingaih circle Shftd to Cbbn Rd |
971 |
000-10-N-P-R-E-UP-008 |
|
Lwrng of RCCprecast box sgmnts cnstrctn of Strcase and alied wrks at pdstrian undrpas acrs the Corporatn crcle twrds T Sidalingh crcle Shftd to Nruptunga Rd nr KR crcle |
972 |
000-10-N-P-R-E-UP-008 |
|
Lowering of rcc pre-cast box segments and construction of s/c of pedestrian underpass across corporation circle to siddalingiaha circle(shifted to K.R.Circle.) |
973 |
000-10-N-P-R-E-CD-022 |
|
Rehabilitation and Strengthening of road from HAL Airport road to basavanagar bus stop |
974 |
000-10-N-P-R-E-AS-031 |
|
Providing Asphalting from N.H.4 to Doddabidarakallu Main Road H.M.T Layout Nagasandra Vinayakanagara in new ward No.39 of (Old No.18) in Dasarahalli Consitutency |
975 |
000-10-N-P-R-E-AS-031 |
|
Providing Asphalt to Bellary Road from Ch.1.20km to 2.55km (Old High Ground Police Station to BDA junction)in Banglore City |
976 |
000-10-N-P-R-B-FO-006 |
|
Construction of compound to the premises of University of Bangalore from Ch.0.125km to 0.250km in Palace road (RHS) |
977 |
000-10-N-P-R-B-FO-006 |
|
Construction of Compound Infront of Property of University of Bangalore in Palace road RHS(Ch:0.125 to 0.250 km) |
978 |
000-10-N-P-P-R-MI-002 |
|
Raising drain and footpath from KPC to Taj West end Constructionn of drain from end of subway upto cresent Road on Race Course Road. |
979 |
000-10-N-P-P-R-MI-002 |
|
Providing footpath from subway to KPC raising the existing drains and extention of drains on Race course road |
980 |
000-09-N-P-E-R-WD-027 |
|
Removal of excavated musk and debrisat Maharani's College circle (Junction of Palace road and Sheshadri road) and towards K.R. circle in Bangalore city |
981 |
000-08-N-G-J-R-BB-025 |
|
Construction of Bus Bays at Lalbagh Main gate towards double road Nimhans Hospital Kidwai Hospital Sanjayagandhi Hospital towards City. |
982 |
000-08-N-G-J-R-BB-025 |
|
Construction of Bus Bays at BTM water Tank HSR BDA Complex Rajarajeshwari arch towards extention Bangalore University gate towards extention. |
983 |
000-08-N-G-J-R-BB-020 |
|
Construction of Bus Bays at Jyothi school towarfs city Agara towards City Agara Towards City Iblur towards City |
984 |
000-08-N-G-J-R-BB-020 |
|
Construction of Bus Bays at Jyothi School towards City Agara towards Extention Agara towards City Iblur towards City |
985 |
|
|
Extention of pedestrian subway |
986 |
|
|
Construction of Compound wall In front of Govt properties at Mysore road |
987 |
|
|
Strengthening and Asphalting of 38th Cross Tilak nagar Block Jayanagar |
988 |
|
|
Strengthening and Asphalting of 38th cross road 30th cross road 27th and 21st cross road from R.V Road to Kanakapura road |
989 |
|
|
Strengthening and Asphalting of 37th Cross road 4th Block |
990 |
|
|
Strengthening and Asphalting of 27th Cross road 7th Block Jayanagar and Anebande Road South end circle to 3rd block circle Jayanagar |
991 |
|
|
Strengthening and Asphalting of 14th main 16th cross 22main in (Tilak nagar Block Jayanagar) |
992 |
|
|
Strengthening and Asphalting of 11thAmain 38th A cross 20th main 10th Main and 31st Cross road. |
993 |
|
|
Strengthening and Asphalting of 11th A main 15th main 19th Main and 31st Cross Thilak Nagar Block Jayanagar |
994 |
|
|
Strengthening and Asphalting of 10th cross road (Jayanagar 3rd Block east) 14th main 16th A main and 14th main - Pavilion Road (Jayanagar) |
995 |
|
|
Rehabilitationa and Strengthening of Jalahalli Road (East) main road from Jalahalli circle to Gangamma circle Ch. 1.20 to 2.20Km. |
996 |
|
|
Rehabilitation and strengthening of road from Tata Institute main gate to Circle Maramma temple |
997 |
|
|
Rehabilitation and strengthening of road from shankarmutt junction towards Geleyara balaga |
998 |
|
|
Rehabilitation and strengthening of road from first block Rajajinagar Circle to MKK road (19th main road) |
999 |
|
|
Rehabilitation and strengthening of N I I T Road to Sadanandha Hair Dressers Ch 0.00 km to 1.10 km |
1000 |
|
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 3.0 to 4.20 km. |
1001 |
|
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 2.0 to 3.00 km. |
1002 |
|
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 0.90 to 2.0 km. |
1003 |
|
|
Rehabilitation and strengthening of Mathikere Main Road from C.V. Raman Road to BEL Circle Ch: 0.00 to 0.90 km |
1004 |
|
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 1.10 to 3.0 km |
1005 |
|
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 0.9 to 1.10 km |
1006 |
|
|
Rehabilitation and Strengthening of Jalahalli Road (West) Main Road from Ayyappa Temple to Gangamma circle. Ch: 0 to 0.9 km |
1007 |
|
|
Rehabilitation and Strengthening of Jalahalli Road (East) Main Road from Jalahalli circle to Gangamma circle. Ch: 2.20 to 3.30 km. |
1008 |
|
|
Rehabilitation and Strengthening of Jalahalli Road (East) Main Road from Jalahalli circle to Gangamma circle. Ch: 0.0 to 1.20 km |
1009 |
|
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 2.10 to 3.20 kms. |
1010 |
|
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 0.90 to 2.10 kms. |
1011 |
|
|
Rehabilitation and strengthening of HMT Main Road from SBI Bank to HMT Factory. Ch 0.00 to 0.90 kms. |
1012 |
|
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 3.2 to 4.0 km |
1013 |
|
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 2.40 to 3.20km |
1014 |
|
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 1.60 to 2.40 km |
1015 |
|
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 0.80 to 1.60 Km |
1016 |
|
|
Rehabilitation and strengthening of C.V.Raman road from Mekhri Circle to Yashwanthapura fly over Ch 0.00 to 0.80 Km |
1017 |
|
|
Rehabilitation and strengthening of 8th Main Road Basaveshvara Nagara Ch 0.00 km to 1.60 km |
1018 |
|
|
Rehabilitation and strengthening of 3rd cross road Sanegoravanahalli Main Road Basaveshvara nagar Ch: 0.00 to 0.70 km |
1019 |
|
|
Rehabilitation and strengthening of 1st main 3rd stage 4rd block Basaveshwaranagar from Magadi road to shankarmutt |
1020 |
|
|
Rehabilitation and strengthening of 1st main 3rd stage 3rd block HIG KHB Basaveshwaranagar (Havanur circle to WOC road) |
1021 |
|
|
Rehabilitation and strengthening of 17th main roaad 2nd block Rajajinagar ( KEB Choultry Road ) Ch 0.0km to 1.15km |
1022 |
|
|
Rehabilitation and strengthening of 12th main roaad 3rd block Rajajinagar from ESI Hospital road 6th block circle via Bhashyam circle ch: 0.0 km to 1.40km |
1023 |
|
|
Rehabilitation and strengthening of 10th main road 4th block Rajajinagar (Rama Mandhira Road) Ch 0.0km to 0.80km & 0.0km to 0.20km |
1024 |
|
|
Providng Asphalting from Modi Hospital junction toward 1st main Thimmaih road in ward no 20 |
1025 |
|
|
Providng Asphalting from Jalahalli Circle on NH 4 to Aravind Motors cross road in ward no 11 |
1026 |
|
|
Providing fountain and other works at Bannappa park in ward no 77 |
1027 |
|
|
Providing Asphlating from Mohan kumar nagar main road from Chowdeshwari bus stand to akkaippa garden Shankarnagar Bus Stand to MES road 1st main Jalahalli in ward no.2 |
1028 |
|
|
Providing Asphalting to Kamalanagara Main road and NGO'S Layout Sy.No.46 in ward No.16. |
1029 |
|
|
Providing Asphalting to 5 6 7 and 8th main BEML Layout 1st main Kamakshipalya Anjaneya Temple Roads to west Sannakki Bailu (11th main) Kamakshipalya in ward No.17. |
1030 |
|
|
Providing Asphalting to 2nd main road J.C.Nagar (Pipeline road) from SWD to Nandini Talkies in ward No.13. |
1031 |
|
|
Providing Asphalting from N.H.4 to Doddabidarakallu Main Road H.M.T Layout Nagasandra Vinayakanagara in new ward No.39 of (Old No.18) in Dasarahalli Consitutency |
1032 |
|
|
Providing Asphalting from Havanur Circle junction towards MIG KHB Main road 2nd stage Baseveshwaranagar 1st main Kamakshipalya in ward no.18 |
1033 |
|
|
Providing Asphalting from 12th main ESI Hospital junction via KLE college surroundings behind Navaranga Theatre road in ward no.15 |
1034 |
|
|
Providing Asphalting 1st main road Yashwanthpur Bazar Circle to HMT main road in ward no.3 |
1035 |
|
|
Providing Asphalting 16th main road surrounding Jai Maruthi Nagara in ward No.12 |
1036 |
|
|
Providing additional street light fittings cable lines control panel etc. in street lighting system in ward no.134 Gunjur |
1037 |
|
|
Procurement of RCC Precast Cellular Boxes of size 3x2.2x1m using M40 Concrete for Proposed Underpass at Sarjapura Road junction and Marigowda road junction |
1038 |
|
|
Procurement of RCC Precast Cellular Boxes of size 3x2.2x1m using M40 Concrete for Proposed Underpass at Marigowda Road junction and Forum Junction |
1039 |
|
|
Procurement of RCC Precast Cellular Boxes of size 3x2.2x1m using M40 Concrete for Proposed Underpass at Kendriya Sadana Road junction |
1040 |
|
|
Maintenance of 2008 rains pl. block 2B |
1041 |
|
|
maintanance of 5*8 seedlings |
1042 |
|
|
Improving exesting drain on Veerabhadra nagar Main road. |
1043 |
|
|
Improvements to roads &Drains at OHT Area and A&B Blocks in Vijinapura |
1044 |
|
|
Improvements to Footpath in chord road Vijaynagar |
1045 |
|
|
Illumination & Electrification works in Anjeneya temple Bovi colony in Kaverinagra. |
1046 |
|
|
Encroachement removal of Gunjur Ward |
1047 |
|
|
Emergency works for Flood damage due to rain in Whitefield ward |
1048 |
|
|
Emergency works for Flood damage due to rain in Kadugodi ward |
1049 |
|
|
Emergency rain damage control works in Gunjur Ward |
1050 |
|
|
Development of ward offices contact centres & Other infrastructure at Gunjur ward |
1051 |
|
|
Constructionof Individual House at Doddanekundhi ward (Phase-2) |
1052 |
|
|
CONSTRUCTION OF ROADS AND DRAINS IN ITI EMPLOYEES COLONY IN DEVASANDRA WARD AREA |
1053 |
|
|
Construction of RCC Culverts of Garudacharpalya in RHB Colony |
1054 |
|
|
Construction of Compound wall to BBMP Land at Ambedkargutta in Whitefield Sub-division |
1055 |
|
|
Construction of Cement Concrete road at Kaverinagara at Mahadevapura Sub-division |
1056 |
|
|
Asphalting whitefield road from KR Pura hanging bridge to Hope farm junction via Hoody junction (ch-7390.00 to 8252.0 mtr) |
1057 |
|
|
Asphalting to11th Main Road Malleshwaram From Srirampura Road Bridge to Nirmala Rani School ( Chitrashilpi Venkatapura Road) |
1058 |
|
|
Asphalting to West of chord road From Manjunathanagara 1st main to 12th cross 1st block Rajajinagara |
1059 |
|
|
Asphalting to W.O.C from National School to ESI Hospital Road |
1060 |
|
|
Asphalting to W.O.C from Manjunathnagar 1st main to 10th cross WOC Road 2nd Stage |
1061 |
|
|
Asphalting to W.O.C from 10th Cross WOC 2nd Stage to 12th Cross GD Naidu Hall |
1062 |
|
|
Asphalting to Tumkur road(S.R road) Southern side from Yeshwanthpur Railwy Station to NHAI Limits (KLE Dental College) Ch.0 to 630M. |
1063 |
|
|
Asphalting to Tumkur road(S.R road) Southern side from Yeshwanthpur Railwy Station to NHAI Limits (KLE Dental College) Ch. 630 to 1330.00 M. |
1064 |
|
|
Asphalting to Tumkur road (Service Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Chainage 2201m to 3200m |
1065 |
|
|
Asphalting to Tumkur road (S.R Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Chainage 1101m to 2200m |
1066 |
|
|
Asphalting to Tumkur road (S.R Road) Northern side From Soap factory to NHAI limits (K.L.E Dental college) Ch.0.0 to 1100m |
1067 |
|
|
Asphalting to service road of West of chord road from Industrial town to ESI Hospital road. |
1068 |
|
|
Asphalting to road from Triveni road cross junction in M.S.Ramaih road to C.V.Raman road |
1069 |
|
|
Asphalting to ESI Hospital Bus road from16 crs Veg Market to Deccan Hospital and Anjaneya temple strt 17 crs adjacet to ESI Hospital in ward No15 Rajajinagar div. |
1070 |
|
|
Asphalting to 17th cross road from dasarahalli main to siddaiah puranik road and 8th main road from magadi main road |
1071 |
|
|
Asphaltin to Tumkur Road(S.R. Road) Southren Side from Yeshwanthpura Railway Station to NHAI limits(KLE Dental College) Ch.1330M to 1840m |
1072 |
|
|
widening and improvements to Dickenson road from M.G.Road to Ulsoor road |
1073 |
|
|
The Work pf Widening Improvements and Asphalting to Hennur road grom Kannoor Junction to Mylahalli Village Chainage 9300.00Mtr. 10100.00Mtr |
1074 |
|
|
The Work pf Widening Improvements and Asphalting to Hennur road grom Kannoor Junction to Mylahalli Village Chainage 7700.00Mtr. 8500.00Mtr. |
1075 |
|
|
Strengthening widening and Asphalting of Road Abbigere Main Road from Kammagondanahalli entrance to Abbigere border. |
1076 |
|
|
Removing Unscientific Road Humps and Providing Scientific Humps in East and Audugodi Traffic Sub Division |
1077 |
|
|
Rehabilitation and strengthening of Road from MS Pallya to Shivakote village (Ch: 2.93 Km to 5.86 Km) |
1078 |
|
|
Rehabilitation and Strengthening Mysore Road From Sirsi Circle to University Circle Ch 0.00km to 0.9 Km Item No.01 |
1079 |
|
|
Rehabilitation and Sternghtening of Jalahalli road (East) main road from Jalahalli Circle to Gangamma Circle. |
1080 |
|
|
RCC Precast Cellular Boxes of size 3x2.2x1m using M40 Concrete for Forrum road Junction and Marigowda Road along Hosur Road. |
1081 |
|
|
Providing UGD facilities near Health Centre and Church of Netaji layout of Uttarahalli Subdivision. |
1082 |
|
|
Providing name boards to Subramanyapura Subdivision. |
1083 |
|
|
Providing Concrete Roads in Chandranagar Kanakanagar Kashinagar Yelachenahalli Fayazabad and Ramakrishnanagar of Subramanyapura Subdivision. |
1084 |
|
|
Providing CC Roads and Drains at Narasamma layout main road in Uttarahalli Subdivision. |
1085 |
|
|
Providing CC Roads and Drains at Narasamma layout cross road in Uttarahalli Subdivision. |
1086 |
|
|
Providing CC Roads and Drains at Arehalli Srinivasa Colony at Uttarahalli Subdivision |
1087 |
|
|
Providing CC Roads and Drains at 5th main road in Uttarahalli Subdivision. |
1088 |
|
|
Providing CC Roads and Drains at 3rd main road and cross roads in Uttarahalli Subdivision. |
1089 |
|
|
Maintenance of Roads and Drainages at Chikkallasandra Canara Bank Colony Udayanagar etc. of Subramanyapura sub division. |
1090 |
|
|
Maintenance of footpath pertaining to RRNagar Subdivision. |
1091 |
|
|
Maintenance of footpath at Uttarahalli Subdivision. |
1092 |
|
|
Lowering of RCC Precast Box Segments of Size 7.50mX4.50mX1.0m for Vehicular underpass Along Dr. Rajkumar Road at Vivekananda College junction. |
1093 |
|
|
Improvements to roads from Uttarahalli Main Road to Joint Canarabank Colony Burial Ground in Subramanyapura Subdivision |
1094 |
|
|
Improvements to roads at Hemavathi layout in Uttarahalli Subdivision. |
1095 |
|
|
Improvements to roads at Arehalli Village in Uttarahalli Subdivision. |
1096 |
|
|
Improvements to roads and drains at Uttarahalli Nandakumars layout. |
1097 |
|
|
Improvements to roads and drains at kodipalya and vaddarapallya in Uttarahalli Subdivision. |
1098 |
|
|
Improvements to Junction at Sindhi Colony Junction Devraj Urs Truck Terminal Junction NTTF Junction Sukh Sagar Junction |
1099 |
|
|
Improvements to Junction at Koramagala 1st block 7th main junction Domlur water tank junction D'souza Circle Palmgrove Junction. |
1100 |
|
|
Improvements to Junction at GPO Junction Coffee Board Junction Indian Express Junction Minsk Square. |
1101 |
|
|
Improvements to Junction at Dr. Raj Kumar Road Rajarajeshwari Kalyana Mantapa Junction Dr. Raj Kumar Stone Bridge Junction Rajajinagar 12th Main and 50 Cross Junction |
1102 |
|
|
Improvements to drains in main roads and cross roads in the sourrounding areas of (Crazy Park) in Rajarajeshwarinagara sub division. |
1103 |
|
|
Improvements to drains in main roads and cross roads at BEML 5th Stage of Rajarajeshwarinagara sub division. |
1104 |
|
|
Improvements to drains in main roads and cross roads around Devadiga Soudha of Rajarajeshwarinagara sub division. |
1105 |
|
|
Improvements and asphalting for 5th main road and balance cross roads at Yelahanka Gandhinagara. |
1106 |
|
|
Estimate for providing Cast-in-situ RCC medians near HSR Lay-out and BTM 100 ft Ring Road Area. |
1107 |
|
|
Estimate for providing Cast-in-situ RCC medians near Dr.Marigowda Road and Surrounding Area (near Madiwala Checkpost) |
1108 |
|
|
Estimate for providing Cast-in-situ RCC medians near Dr.Marigowda Road and Surrounding Area (Near Forum) |
1109 |
|
|
Estimate for providing Cast-in-situ RCC medians near Coffee Day Junction Lavelle Road Museum Road and St. Marks Road. |
1110 |
|
|
Estimate for providing Cast-in-situ RCC medians in Swagath Main Road |
1111 |
|
|
Estimate for providing Cast-in-situ RCC medians in Macgrath Road Victoria Road Lower Agaram road and surrounding Area. |
1112 |
|
|
Estimate for providing Cast-in-situ RCC medians in Bannerghatta and Surrounding Area. |
1113 |
|
|
Earth work construction of drain/culvert and subbase on road from milk parlour on Race course road to join Sheshadri road at Subbanna circle in Bangalore city. |
1114 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Vasantapura Colony in Subramanyapura sub division. |
1115 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Vasanta Vallabhanagara 2nd stage in Subramanyapura sub division. |
1116 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Vasanta Vallabhanagar 1st stage in Subramanyapura sub division. |
1117 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Uttarahalli Balajinagara in Subramanyapura sub division. |
1118 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Uttarahalli Arjun kaval (Muneshwara Block) in Subramanyapura sub division. |
1119 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Uttarahalli Appayyaswamy layout in Subramanyapura sub division. |
1120 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Turahalli Village in Subramanyapura sub division. |
1121 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Srinivasa Colony in Subramanyapura sub division. |
1122 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Paramahamsanagara Village in Subramanyapura sub division. |
1123 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Naidu layout in Subramanyapura sub division. |
1124 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Kempegowda layout in Subramanyapura sub division. |
1125 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Kariyannanapalya in Subramanyapura sub division. |
1126 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Gubbalalu Village in Subramanyapura sub division. |
1127 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Gubbalalu Marutinagara Village in Subramanyapura sub division. |
1128 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Bangarappanagar near watertank in Subramanyapura sub division. |
1129 |
|
|
Drilling of 165mm dia New Borewell and Providing electrification distribution pipeline at Arehalli Village in Subramanyapura sub division. |
1130 |
|
|
consultancy services for the work ROB/RUB at Yeshwanthpura Railway atation |
1131 |
|
|
consultancy services for the work of construction of RUB at 18th Cross Kanakanagara. |
1132 |
|
|
Consultancy service for Construction super vision and Project management of Arterial and sub-Arterial Roads in Bangalore |
1133 |
|
|
Construction of Toilet Block Boating Jetty and Shelters with Modern Amenities at Allasandra Kere for Public. |
1134 |
|
|
Construction of samudaya bhavana in J.P.Colony at Yelahanka |
1135 |
|
|
Construction of RCC Drains at Pattanagere Village in Rajarajeshwari nagar Subdivision |
1136 |
|
|
Construction of RCC Culverts in Paramahamsanagar and Bhuvaneshwari nagar. |
1137 |
|
|
Construction of Footpath and Clearence in the area of Subramanyapura sub division. |
1138 |
|
|
Construction of Drains and Culverts at Kenchenahalli Village in RRNagara |
1139 |
|
|
Construction of Bus Bays at Roman Catholic Cemetery towards Shivaji Nagar BMTC 10th depot bus stop (Hennur) Bamboo bazaar Philips Bus stop towards extention. |
1140 |
|
|
Construction of Bus Bay at While going towards City (Tirumanahalli) towards City Lalbagh West Gate towards Jayanagar |
1141 |
|
|
Construction of Bus Bay at Adugodi Govt. School Opp. Krishna Temple near Adugodi Opp. Adugodi Austin Town. |
1142 |
304-13-000149 |
|
Improvements to road from BGS Hospital to Global village rajarajeshwari nagar zone package |