CE SWD (South) Head Office Projects Details Total Projects : 582 |
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
OOO-07-N-Z-I-D-FO-011 |
|
Construction of SWD from Ramamurthy Nagara to Nagara kere (ITI Compound). |
2 |
205-09-N-J-N-D-FO-002 |
|
Construction of RCC Bridge across V.Valley near Kodipalya Vidyapeeta at Kengeri in Rajarajeshwarinagara |
3 |
204-09-N-P-P-O-MI-001 |
|
Consultancy Service for Remodeling of SWD in Mahadevapura Zone in BBMP Area. |
4 |
204-09-N-J-N-D-FO-020 |
|
Providing RCC Box drain for Byrasandra-Kaggasandra SWD from 14th Main Byarasandra Main Road to Kaggandrapura Lake in MZ |
5 |
204-09-N-J-N-D-FO-019A |
|
Providing lead off Drain From 10th main 8th Cross of Maruthinagara To Kagadasapura -Doddanakundi SWD |
6 |
204-09-N-J-N-D-FO-019 |
|
Construction of Storm water drain from Ramakka Layout to Ambedkar Nagar Ch:0 to 81m. |
7 |
204-09-N-J-N-D-FO-018 |
|
Construction of Storm water drain of Ambedkar Nagar from Schunk metal & carbon Pvt.Ltd to maheshwaramma nagar Main Road (From Ch:0m to 216m) |
8 |
204-09-N-J-N-D-FO-017 |
|
Construction of Storm water drain from Maheshwaramma Nagar Main Road to Mahadevapura Tank (From Ch:470m to 930m) |
9 |
204-09-N-J-N-D-FO-016 |
|
Resectioning of SWD from Kaggadasapura Tank to Doddanekkundi Tank in Mahadevapura Zone |
10 |
204-09-N-J-N-D-FO-014 |
|
Providing lead of drain from Nagavara Palya Main Road towards Benniganahalli Kagasadasapura Lake in Mahadevapura Zone |
11 |
204-09-N-J-N-D-FO-008A |
|
Providing lead off Storm Water Drain From Maruthinagara To SWD of Kagadasapura -Doddanakundi SWD |
12 |
204-09-N-J-N-D-FO-008 |
|
Providing lead of SWD from Mallesh palya 5th Main Surround area towards Kakkadasapura Dodanagundi SWD Mahadevapura Zone |
13 |
204-09-N-J-N-D-FO-007 |
|
Providing lead of drain from Nagavara Palya upto SWD of Bennigana Halli-Kaggadasapura SWD in Mahadevapura Zone |
14 |
204-09-N-J-N-D-FO-006 |
|
Providing RCC U shape box drain from Ch:0 m to 270 m of SWD from Vibhutipura tank waste weir to Kallappa block and Balance work |
15 |
204-09-N-J-N-D-FO-004 |
|
Construction of RCC box drain from Basavanapura Main Road to Manjunath Layout. CH:0.0 m to 540 m. |
16 |
204-09-N-J-N-D-FO-003 |
|
Construction of RCC deck slab culverts at CH:1220m of SWD from Rammurthy Nagar to ITI Compound |
17 |
204-09-N-J-N-D-FO-002 |
|
Construction of Box Culverts across at Ch:1800m of SWD from Doddanakundi tank to HAL Marathahalli main Road |
18 |
204-09-N-J-N-D-FO-001 |
|
Construction of RCC deck slab culverts at CH:1332m of SWD from Rammurthy Nagar to ITI Compound |
19 |
204-09-N-G-E-D-FO-027 |
|
construction of SWD from 4th cross of Ghandipura to Dommasandra gudisallu halla in mahadevapura area near white field |
20 |
204-09-ME-E-D-E-001 |
|
Desilting of SWD from Basavanapura Main Road (Krishna Talkies) to junction of Vengayana Kere to Seegehalli Tank. |
21 |
204-09-M-J-N-D-FO-004 |
|
Construction of RCC box drain from Basavanapura main road to Manjunatha layout ch 0 to 540 M |
22 |
204-09-M-G-E-D-FO-027 |
|
Construction of SWD from 4th Cross Road of Gandipura To Dommaragudisalu Halla in Mahadeva pura Area Near White Field. |
23 |
203-N-J-N-D-FO-008 |
|
Resectioning of SWD upstream side and downstream side of Shivapuratank upto Narasappalli tank |
24 |
203-09-N-P-P-O-M1-001 |
|
Consultant service for preparation of DPR for Remodelling of SWD in Dasarahalli Zone |
25 |
203-09-N-J-N-D-FO-017 |
|
Formation and construction of RCc box drain from HMT Layout to Rukmini nagar (Nagasandra colony) Dasarahlli Zone |
26 |
203-09-N-J-N-D-FO-016 |
|
Construction of Box drain & Protective works at Ch.250.00m to ch.325.00m of SWD From Arunodaya Vidya Samsthe to Herohalli tank in Mahadeshwara Nagara |
27 |
203-09-N-J-N-D-FO-015 |
|
Resectioning of Storm water drain from East West college Road(Anjananagar) to Nice road Via. Byadarahalli & Kempegowda nagara |
28 |
203-09-N-J-N-D-FO-014 |
|
Construction of Box Drain Protection works at CH 210 of SWD From Arunodaya Vidya samsthe to Herohalli tank in Mahadeshwara Nagara |
29 |
203-09-N-J-N-D-FO-013 |
|
Construction of Box drain & Protective works @ Ch.270.00m and Ch.350.00m of SWD Syndicate layout to Herohalli |
30 |
203-09-N-J-N-D-FO-012 |
|
Resectioningof Storm water Drain from Heggenahalli to Herohalli tank via Vigneshwara Prasanna Maruthi Mahadeshwara layout on to Andarahalli |
31 |
203-09-N-J-N-D-FO-011 |
|
Providing Lead of Drain & Protective works from East West College road to WasteWeir canal in Anjananagara |
32 |
203-09-N-J-N-D-FO-010 |
|
Resectioning of Storm Water Drain From Herohalli Tank to Muddainapalya Tank |
33 |
203-09-N-J-N-D-FO-009 |
|
Construction of RCC box culvert at Nagendra colony |
34 |
203-09-N-J-N-D-FO-008 |
|
Resectioning of SWD upstream side and downstream side of Shivapura tank Narasapalli tank of Dasarahalli Zone |
35 |
203-09-N-J-N-D-FO-006 |
|
Resectioning of SWD from Hesaragatta main road-Guddadhally tank via Guddadahally vally of Dasarahally zone |
36 |
203-09-N-J-N-D-FO-005 |
|
Constructoin of RCC Retaining wall for SWD From Ch:1800m to Ch:2470 m of Doddanakundi tank to HAL Marathahalli Main Road |
37 |
203-09-N-J-N-D-FO-004 |
|
Construction of Strom water Drain infront of Kempegowda nagar near Outer Ring road in Laggere at Dasarahalli Zone |
38 |
203-09-N-J-N-D-FO-002 |
|
Formation and construction of Strom water drain in Chowdeshwari nagr in Laggere range of Dasrahalli ZOne |
39 |
202-09-NJND-F0-002 |
|
Resectioning and widening of Rajakaluves from Amruthahally tank to Rachenally Tank and Rachenally tank to Mariyannanapalya drain in Hebbal valley P-III |
40 |
202-09-NJND-F0-001 |
|
Resectioning and widening of Rajakaluves from Attur lake to Puttenahally lake and Yalahanka tank to Rachenahally tank via Jakkur Tank.? |
41 |
202--09-N-P-P-O-M1-001 |
|
Consultancy Service for Preparation for remodelling of Storm Water Drain in Byatarayanapura(Yelahanka Zone) |
42 |
201-09-N-J-N-D-FO-001 |
|
Construction of Strom work drain @ Kalastree nagar of Dasarahalli Zone |
43 |
084-09-NJND-F0-001 |
|
Construction of box culvert across SWD leading to Benniganahalli tank at 2nd cross road in Kasturi Nagar HV-4 |
44 |
084-09-N-G-H-P-LS-001 |
|
Desilting of SWD from Greenview park in Kasturi Nagar upto Benniganahalli tank and reconstruction of SSM retaining wall upto outer ring road |
45 |
083-08-N-G-E-R-PL-001 |
|
Providing lead off Storm Water Drain From 5th main malleshpalya and surrounding areasUp To Kagadasapura -Doddanakundi SWD |
46 |
076-10-N-W-E-D-FO-004 |
|
Construction of RCC SWD from rear side of Satya sai hospital to Pattundur Agrahara from chainage 225 to 300 m in Mahadevapura zone |
47 |
076-10-N-W-E-D-FO-003 |
|
Construction of RCC SWD from rear side of Satya sai hospital to Pattundur Agrahara from chainage 150 to 225 m in Mahadevapura zone |
48 |
076-10-N-W-E-D-FO-002 |
|
Construction of RCC SWD from rear side of Satya sai hospital to Pattundur Agrahara from chainage 75 to 150 m in Mahadevapura zone |
49 |
076-10-N-W-E-D-FO-001 |
|
Construction of RCC SWD from rear side of Satya sai hospital to Pattundur Agrahara from chainage 0 to 75 m in Mahadevapura zone |
50 |
068-09-N-J-N-D-FE-002 |
|
PROVIDING CHAINLINK FENCING AND SOLID CONCRETE BLOCK WALL FOR SWD IN ASHWINI LAYOUT AND S.T.BED LAYOUT WARD NO.68 IN KORAMANGALA VALLEY PACKAGE |
51 |
068-09-N-J-N-D-FE-001 |
|
ESTIMATE FOR THE WORK OF PROVIDING CHAINLINK FENCING FOR STORM WATER DRAIN IN WARD NO.68 AT DIFFERENT LOCATIONS IN KORAMANGALA VALLEY PACKAGE -2 |
52 |
062-08-M-G-T-S-LG-001 |
|
Construction of Storm Water drain from Pattalamma layout to Dakshina pinakini river Siddartha layout ( from Ch: 0 m to 300 m) |
53 |
054-10-N-G-H-O-MI-001 |
|
Remodelling of Secondary of V.Valley in pipeline Road 3rd Cross Malleshwaram(Ch:300 to 325mtrs) in Vrishabhavathi Valley Pcckage-1 |
54 |
043-10-N-W-E-D-FE-006 |
|
Providing Bed Protection Chain link fencing to SWD at Lakshmanamurthy nagar ( Bhovi colony) from Ch: 600m to 700m |
55 |
043-10-N-W-E-D-FE-005 |
|
Providing Bed Protection Chain link fencing to SWD at Lakshmanamurthy nagar ( Bhovi colony) from Ch:500m to 600m |
56 |
043-10-N-W-E-D-FE-004 |
|
Providing Bed Protection Chain link fencing to SWD at Vijinapura Ambedkar Slum from Ch: 450 m to 600 m |
57 |
043-10-N-W-E-D-FE-003 |
|
Providing Bed Protection Chain link fencing to SWD at Vijinapura Ambedkar Slum from Ch: 300m to 450m |
58 |
043-10-N-W-E-D-FE-002 |
|
Providing Bed Protection Chain link fencing to SWD at Vijinapura Ambedkar Slum from Ch:150 m to 300 m |
59 |
043-10-N-W-E-D-FE-001 |
|
Providing Bed Protection Chain link fencing to SWD at Vijinapura Ambedkar Slum from Ch:0m to 150m |
60 |
038-06-N-H-N-D-IM-001 |
|
remodelling of primary & secondarry storm water drain in vrishabavathi valley package-3 from ch 0.0mts to 6500.0mtrs (V2VD-III) |
61 |
036-09-N-J-N-D-FO-004 |
|
Construction of Existing Culvert in Sec. SWD Crossing the junction of 1st Cross Kaveripura in Muneshwaranagara Vrishabhavathi Valley P-4 |
62 |
034-06-IS-E-R-IM-001 |
|
Remodelling of Primary and Secondary Storm Water Drain in Vrishabhavathi Valley Package-1 |
63 |
034-06-I-S-E-R-JM-001 |
|
Remodelling of Primary & Secondary SWD & Construction of Culverts/Bridges & Formation of Service Rd's Karthiguppe Minor Vally VVP-5 |
64 |
034-06-I-S-E-R-IM-002 |
|
Remodelling of primary and secondary SWD in V. Valley from Magadi road to Mysore road. |
65 |
029-09-N-J-N-D-FO-001 |
|
Remodelling of Sec. drain V-106 frm Ch:990 to 11000m in w.n-29 by providing Bed treatment & Railway Bridge to 8th Cross of Nethaji Nagara in K.P.Agrahar in VVP-1 |
66 |
029-08-N-J-N-D-FO-001 |
|
Construction of Storm Water Drain at Cottonpet Road to Mill Road in Vrishabhavathi Valley Package-1 |
67 |
028-10-N-G-E-D-FO-007 |
|
Construction of RCC Box Drain along 14th Cross of Byrasandra from Malnad Apartments up to Kaggadasapura tank |
68 |
0203-N-J-N-D-FO-007 |
|
Resectioning of SWD from Kuvempunagar to Abbigre tank passing through Singapura in Kammagondanahally |
69 |
016-09-N-J-N-D-FO-001 |
|
Construction of RCC Retaining wall in Secondary drain near Kamalanagara Ward No-16 in Vrishabhavathi Valley P-3 |
70 |
013-09-N-J-N-D-FO-001 |
|
construction of RCC Retaining wallin secondary drain V202at 3rd cross 1st B main behind geleyara balaga park jc nagar |
71 |
001-10-N-J-N-D-FO-027 |
|
Providing Chain link Fencing from vengayana Kere to Seegehalli Kere |
72 |
000-123456-aa |
|
kamalanagar |
73 |
000-123444-aa |
|
kamalanagar |
74 |
000-10-NJND-F0-065 |
|
Construction of RCC U shape drain from RS Palya tank bed upto fire station in Hebbal valley -IV |
75 |
000-10-N-P-P-D-FO-003 |
|
Remodelling of Secondary drain V 114 Ch 450mtrs to 550 mtrs of V Valley by U Shape Drain in Ward No 8 lakshminarayanapura frm Harichandra Gatt 4th Main in VVP 1 |
76 |
000-10-N-P-I-R-BE-062 |
|
Construction of U Shape RCC drain from Bagalagunte tank to Sharadha VIdyapeta in Dasarahalli Zone (LinkDH232-34) From 650 to 1325m |
77 |
000-10-N-J-N-D-FO-O26 |
|
Construction of SWD from Vijana pura (Ambedkar Slum) to Ramamurthy Nagar Main Road via ITI compound. From Ch:550 m to Ch:750 m. |
78 |
000-10-N-J-N-D-FO-101 |
|
Remodelling of Sec. SWD V-112 17th Cross of Malleshwarm to 6th Cross Rajajinagar 1st Block(frm Mysore Lamps to Railyway Culvert) VVP-1 |
79 |
000-10-N-J-N-D-FO-099 |
|
Construction of RCC Box drain from Ch:2110 to 2250mtrs(Frm Sepping Road at Shivajinagar) in Challagatta Valley Package-2 |
80 |
000-10-N-J-N-D-FO-095 |
|
Construction of ?R.C.C. U shaped drain to SWD at the bell mouth of Allalasandra kere in Yelahanka zone. |
81 |
000-10-N-J-N-D-FO-094 |
|
Construction of R.C.C. U Box Culvert across SWD BP163@ ch:180 m Surabhi Layout in Yelahanka zone. |
82 |
000-10-N-J-N-D-FO-093 |
|
Construction of Culverts for C.M.H.Road and Old Madras Road for crossing of Secondary drain C-102 in Challagatta Valley Packege-2 |
83 |
000-10-N-J-N-D-FO-089 |
|
Constreuction of Rcc box culvert at Ch 470 m Of Ambedkar nagara SWD Near Maheshwaramma temple in Mahadevapura zone |
84 |
000-10-N-J-N-D-FO-087 |
|
Construction of RCC Retaining on RHS V-100 Ch:3050 to 3750m frm Vattalnagara Rd to Joining of Sec.drain to Pri.drain in Vrishabhavathi Valley Package-1 |
85 |
000-10-N-J-N-D-FO-086 |
|
Construction of RCC Retaining wall on left side in V-100 at Ch:3530m to 3750m frm Vattal Nagaraj Rd joining of Sec.drain in Vrishabhavathi Valley Package-1 |
86 |
000-10-N-J-N-D-FO-071 |
|
Reconstruction of LHS SSM Side wall in V-100 at Ch:4200 & V-108 Ch:780m on Sec. drain in Gopalapura area in Vrishabhavathi Valley Package-1 |
87 |
000-10-N-J-N-D-FO-064 |
|
Reconstruction of Collapsed and Providing RCC Deck Slab to SWD shashtri Nagara in Vrishabhavathi Valley Package 5 |
88 |
000-10-N-J-N-D-FO-063 |
|
Reconstruction of Collapsed SSM in Secondary drain V 122 and V 102 in Rqaghavendra Block in Vrishabhavathi Valley Package 5 |
89 |
000-10-N-J-N-D-FO-061 |
|
Reconstruction of SSM in SWD V300 at Srinagara 4th Main 12th Cross bahind Yallamma Temple and Repairs to existing Bridge V300 in VVP5 |
90 |
000-10-N-J-N-D-FO-060 |
|
Reconstruction of SSM in SWD V 300 1st B Main 1st Cross of Srinivasnagara in Vrishabhavathi Valley Package 5 |
91 |
000-10-N-J-N-D-FO-059 |
|
Construction of RCC Box culvert across SWD 2nd A Main 7th A Cross Satyanarayana Temple street Srinivasnagar in ward No 54 in Vrishabhavathi Valley Package 5 |
92 |
000-10-N-J-N-D-FO-049 |
|
Remodelling of SWD at 33rd and 1st Main of Ashshta Lakshmi layout in Bommanahalli Zone |
93 |
000-10-N-J-N-D-FO-048 |
|
Construction of Box Culvert at Ch:910m of SWD from Vengayanakere to Segehalli tank in K.R.Puram |
94 |
000-10-N-J-N-D-FO-047 |
|
Providing MS Steel Foot Bridge across SWD V 303 near Kakatinagara Ittamadu in Vrishabhavathi Valley Package 5 |
95 |
000-10-N-J-N-D-FO-045 |
|
Remodelling of Sec SWD V-112 frm 6th Cross of rajajinagara 1st Block to Varalakshmi Nursing Home in Vrishabhavathi Valley Package-1 |
96 |
000-10-N-J-N-D-FO-044 |
|
Remodelling of Secondary Storm Water Drain V-112 From Milk Colony to 17th cross of Malleswaram |
97 |
000-10-N-J-N-D-FO-033 |
|
CONST. OF CULVERT RCC AT CH:675 M & RECONST. OF FLOOD DAMAGED RETAINING WALL & WIDENING OF SECONDARY DRAIN C204 NEAR JEEVANAHALLI UNDER CVP-1 |
98 |
000-10-N-J-N-D-FO-029 |
|
Cost Estimate For Construction of Storm Water Drain (MD459) From Backside Sai Baba Ashram to Dakshina Pinakini River (From Ch:749.5m to 1348m) |
99 |
000-10-N-J-N-D-FO-028 |
|
Construction of SWD from Vijana pura (Ambedkar Slum) to Ramamurthy Nagar Main Road via ITI compound. From Ch:750 m to Ch:940 m. |
100 |
000-10-N-J-N-D-FO-023 |
|
Construction of Box Culvert Protective works at Ch 960 m of SWD in Prasanna layout (Heggenahalli to Herohalli tank SWD) |
101 |
000-10-N-J-N-D-FO-020 |
|
Reconstruction of SSM R/W in V-112 Sec.valley frm Ch:3250 to 3350 in V.Valley W.No-25 in Ramchandrapura in VVP-1 |
102 |
000-10-N-J-N-D-FO-017 |
|
Construction of Box Culvert at Ch:1100mtrs from Doddabommasandra outlet weir to Tatanagara |
103 |
000-10-N-J-N-D-FO-016 |
|
Construction of Box Culvert at Ch:600 to 1250m & 180m and resection of existing drain from Yall NT Allekere in B-Zone |
104 |
000-10-N-J-N-D-FO-014 |
|
RESECTIONING OF RAJAKALUVE FROM GK VK UPTO DODDA BOMSANDRA TANK IN TINDLU |
105 |
000-10-N-J-N-D-FO-012 |
|
Construction of Box Culvert at Ch:775 m of SWD from Vengayanakere to Segehalli tank in K.R.Puram |
106 |
000-10-N-J-N-D-FO-008 |
|
Construction of Box Culvert at Ch:650 mtr from Gurudarshini layout to inlet of Doddabommasandra |
107 |
000-10-N-J-N-D-FO-006 |
|
CONSTRUCTION OF RCC BOX CULVERT AT CH 1900 M 17251775 AND CH 1825 M IN SECONDARY DRAIN H-201 IN JALADARSHINI LAYOUT |
108 |
000-10-N-J-N-D-FO-002 |
|
CONSTRUCTION OF BRIDGE ACROSS YOGESH NAGAR MAIN ROAD AT CH 4375 (H-100) |
109 |
000-10-N-J-N-D-FD-005 |
|
CONSTRUCTION OF RCC BOX CULVERT TO SECONDARY DRAIN H-201 AT CH 1585 FOR ISRO MAIN ROAD |
110 |
000-09-NJND-FO-166 |
|
Reconstruction of collpased /dilapidated SSM wall in H-300 Ch:2000.00m to 5000.0m in HVP-III |
111 |
000-09-NJND-FO-151 |
|
Reconstruction of collapsed/dilapidated SSM walls from Ch:275 to 340 and Ch:400m to 450 in seconadry drain H-103 in Krishnappa block in HVP-I |
112 |
000-09-NJND-F0-64 |
|
Construction of bridge across primary drain H-300 in Hennur main road at Ch:6815m in Hebbal valley P-IV |
113 |
000-09-NJND-F0-174 |
|
Construction of SWD (missing bit) in Ramachandrappa Layout to join H-304 of Hebbal valley P-III |
114 |
000-09-NJND-F0-173 |
|
Construction of U shape drain to Primary drain H-300 from Ch:1835.00m to Ch:1965.00m near Petrol bunk from Hennur main road in Hebbal Valley P-III |
115 |
000-09-NJND-F0-165 |
|
Construction of dilapidated /damaged SSM retaining wall in secondary SWD H-308 of HVP-III |
116 |
000-09-NJND-F0-136 |
|
Construction of box drain along 80 feet road from Ch:300.00m to 450.00m joing H-306 to H-300 in Hebbal Valley P-III |
117 |
000-09-NJND-F0-135 |
|
Construction of box drain along 80 feet road in HBR layout connecting H-306 to H-300 Ch:450.00 to Ch:600.00m in Hebbal Valley P-III |
118 |
000-09-NJND-F0-134 |
|
Construction of box drain along 80 feet road from Ch:150.00m to 300.00m joining H-306 to H-300 in Hebbal Valley P-III |
119 |
000-09-NJND-F0-131 |
|
Construction of box drain along 80 feet road in HBR layout connecting H-306 to H-300 Ch:0.00 to Ch:150.00m in Hebbal Valley P-III |
120 |
000-09-NJND-F0-128 |
|
Construction of U shape drain in H-306 from Ch:350 to Ch:1100m in Hebbal Valley P-III |
121 |
000-09-NJND-F0-076 |
|
Construction of drain from HKBK college to H-300 at Ch:4700 of Hebbal valley P-3 |
122 |
000-09-NJND-F0-057 |
|
Construction of bridge at Ch:1965 of H-300 in Hebbal Valley P-III near Chandrika soap factory |
123 |
000-09-NJND-F0-041 |
|
Construction of SSM to SWD (missing bit) on either side of railway bridge near Banaswadi railway station from Lingarapuram to Kanakadasa Layout in HVP-III |
124 |
000-09-NJND-DE-002 |
|
Removal of silt in primary and secondary swd in Hebbal valley P-III |
125 |
000-09-N-P-P-OM1-019 |
|
Preparation of detailed project report for Remodelling of Storm Water Drains in New Zones of BBMP area Rajarajeshwari Nagara Zone. |
126 |
000-09-N-P-P-O-M1-031 |
|
Consultency Service for Preparation of Master Plan for Remodelling of SWD in all Zones of Entire BBMP Area |
127 |
000-09-N-J-ND-FO-073 |
|
CONSTRUCTION RCC RETAINING WALL TO PRIMARY DRAIN H-100 FROM CH2650TO3000 IN HVP-1 |
128 |
000-09-N-J-N-FO-020 |
|
Construction of RCC Retaining wall along right side of Vrishubavathi Valley opposite to BWSSB Sewage treatment plant at Mylsandra by the side of Mysore Road |
129 |
000-09-N-J-N-D-FO-188 |
|
CONSTRUCTION OF RCC BOX CULVERT AT CH 500 MTR AND RCC BOX DRAIN FROM CH 260 TO 520 MTR TO SECONDARYT DRAIN FROM TATA NAGAR ALONG KODIGEHALLI MAIN ROAD |
130 |
000-09-N-J-N-D-FO-187 |
|
construction of RCC Box Drain CULVERT 175 M AND RCC BOX DRAIN FROM CH 0 TO 260 TO SECONDARY DRAIN FROM TATA NAGAR ALONG KODIGEHALLI MAIN ROAD |
131 |
000-09-N-J-N-D-FO-181 |
|
Remodelling of Millers Road culvert at Ch:377.00 M providing and fixing precast elementary in C.V.P-II |
132 |
000-09-N-J-N-D-FO-180 |
|
REMOVAL OF EARTH IN SECONDARY DRAIN MISSING BIT IN MATADAHALLI AND RECONSTRUCTION OF COLLASEPED SSM RETAINING WALL IN HVP -1 |
133 |
000-09-N-J-N-D-FO-163 |
|
CONSTRUCTION OF RCC BRIDGE AT CH:2540 M IN C200 AT MORE ROAD UNDER CHALLAGATTA VALLEY PACKAGE -1. |
134 |
000-09-N-J-N-D-FO-158 |
|
Reconstruction of RHS SSM r/w in bet. Ch:235 to 265m in Sec.Valley in W.n-30 in Sidharthanagara TCM Rayan Rd in VVP-1 |
135 |
000-09-N-J-N-D-FO-157 |
|
Construction of RCC Box drain frm ch:1640 to 1700m & Construction of Shopes over the Box drain in CVP-2 |
136 |
000-09-N-J-N-D-FO-156 |
|
CONSTRUCTION OF RCC RETAINING WALL FROM CH 4200 TO 4500 IN H-100 |
137 |
000-09-N-J-N-D-FO-155 |
|
Constructioin of RCC Box drain frm Ch:1700 to 1760 & Construction of sgape over the Box drain in Challagatta Valley Package-2 |
138 |
000-09-N-J-N-D-FO-154 |
|
Construction of RCC Box drain frm Ch:1820 to 1880 & Construciton of Shopes over the Box drain in Challagatta Valley Pakage-2 |
139 |
000-09-N-J-N-D-FO-153 |
|
Construction of RCC Box drain frm Ch:1760 to 1820 & Construction of SHops over the Box drain in CVP-2 |
140 |
000-09-N-J-N-D-FO-152 |
|
CONSTRUCTION OF COLLAPSED / DILAPILATED SSM WALLS FROM CH 100 TO 175 AND 375 TO 450 IN PRIMARY DRAIN H-100AND REMOVAL OF EARTH |
141 |
000-09-N-J-N-D-Fo-148 |
|
Construction of RCC Retaining wall between ch:10100 to 10125mtrs on left hand side in K-100near Jakkasandra in KV Package - 2 |
142 |
000-09-N-J-N-D-FO-144 |
|
IMPROVEMENTS TO DRAIN OF AMAR JYOTHI LAYOUT @ kormangalla inner ring road under challagatta valley package-3 |
143 |
000-09-N-J-N-D-FO-139 |
|
Reconstruction of collapsed/dilapidated SSM retaining wall of SWD along outer ring road upto Benniganahalli tank in Kasturi Nagar |
144 |
000-09-N-J-N-D-FO-131 |
|
Construction of box drain along 80 feet road in HBR layout connecting H-306 to H-300 (Ch:0.0m to 150.00M) in Hebbal valley P-III |
145 |
000-09-N-J-N-D-FO-130 |
|
Estimate for the work of remodelling of Secondary SWD starting from Viveknagar 4th main 7th cross and upto primary drain K-100 in Koramangala valley package-2. |
146 |
000-09-N-J-N-D-FO-124 |
|
construction of SSM Drain and RCC deck slab from 1st main road to 4th main road RMV 2nd stage in HVP-2 |
147 |
000-09-N-J-N-D-FO-121 |
|
Remodelling of RCC Box Culvert at V-106 Secondary drain in ward No-31 KP Agrahara 8th Cross Magadi Rd in Vrishabhavathi Valley P-1 |
148 |
000-09-N-J-N-D-FO-117 |
|
Remodelling f silt at Critical Points in Challagatta Valley Package-I |
149 |
000-09-N-J-N-D-FO-089 |
|
providing chain link fencing from tumkur road (NH4) to industrial sub urb yeshvanthpur in v- valley package-3. |
150 |
000-09-N-J-N-D-FO-087 |
|
Recosntruciton nof damaged Culvert at Ch:875(Sheshadri Rd) in Primary drain C-200 under Challagatta-I |
151 |
000-09-N-J-N-D-FO-075 |
|
Remodelling of V-110 Secondary drain of Vrishabhavathi Valley in Pipeline road 3rd Cross Malleshwaram in BBMP(Ch:300 to 325mtr) |
152 |
000-09-N-J-N-D-FO-071 |
|
CONSTRUCTION OF BOX CULVERT ACROSS PRIMARY DRAIN H-100 AT CH 350 MTRS (AT 5TH MAIN 3RD CROSS) HVP- 1 |
153 |
000-09-N-J-N-D-FO-070 |
|
CONSTRUCTION OF RCC RETAINING WALLFROM CH 2400TO26009(BOTH SIDES) IN HVP-1 |
154 |
000-09-N-J-N-D-FO-069 |
|
CONSTRUCTION OF BOX DRAIN IN SECONDARY DRAIN H-103 FROM CH.1100.00 TO CH.1130.00M IN PILLAPPA BLOCK IN HVP - 1. |
155 |
000-09-N-J-N-D-FO-068 |
|
RECONSTRUCTION OF COLLAPSED DILAPILATED SSM WALL IN H-104 FROM CH 1800 TO 1900 MTR IN ANAND NAGAR IN HVP-1 |
156 |
000-09-N-J-N-D-FO-067 |
|
CONSTRUCTION OF BOX CULVERTS AT CH 625 675720 & 760 MTS AND BOX DRAIN FROM CH 200 TO 230M IN SECONDARY DRAIN H-103 IN HVP - I |
157 |
000-09-N-J-N-D-Fo-061 |
|
Providing improvements to secondary drain SWD from 21st cross Egipura and 7th cross joining primary drain K-100 near everest high school in KVP |
158 |
000-09-N-J-N-D-FO-059 |
|
Construction of RCC Box drain from Ch:387 to 490(Frm Miller Rd to Ambedkar bhavan cmp end) in Challagatta Valley P-2 |
159 |
000-09-N-J-N-D-FO-058 |
|
CONSTRUCTION OF SSM STORM WATER DRAIN FROM CH:549 M TO CH:910 M IN KATALIPALYA DRAIN INSIDE MEG & CENTRE UNDER CHALLAGATTA VALLEY PACKAGE-1. |
160 |
000-09-N-J-N-D-FO-055 |
|
Remodelling of Box drain in V-100 Ch:1685-1890 Opp. Executive Engineer Office Malleshwaram Near Rajiv Gandhi Circle in Vrishabhavathi Valley Package-1 |
161 |
000-09-N-J-N-D-FO-054 |
|
Reconstruction of collapsed/dilapidated SSM retaining wall in primary drain H-400 at Ch:800m in Hebbal valley P-IV |
162 |
000-09-N-J-N-D-FO-053 |
|
Reconstruction of Collapsed/delapilated SSM Retaining wall in Challagattta Valley Package-I |
163 |
000-09-N-J-N-D-FO-051 |
|
Reconstruction of Collapsed/dilapilated SSM Walls in Challagatta Valley PAckage-2 |
164 |
000-09-N-J-N-D-FO-050 |
|
Remodelling of Box Culvert at Ch:2600 across Kamraj Road in Challagatta Valley Package-2 |
165 |
000-09-N-J-N-D-FO-049 |
|
providing chainlink fencing to primary drain in yashavanthpur brindavan nagar nethaji slum in hebbal package-2 |
166 |
000-09-N-J-N-D-FO-044 |
|
Construction of RCC culverts at Ch:495mtrs(MVC-6) and 531mtrs (MVC-7) in Primary drain C-200 Near Krishnana Garden Under Challagatta Valley P-I |
167 |
000-09-N-J-N-D-FO-043 |
|
Construction of RCC Retaining wall & SSM Wall frm Ch:613 to 743mtrd for C-203 Secondary SWD in Challagatta Package-1 |
168 |
000-09-N-J-N-D-FO-035 |
|
Providing Fabricating crash barring with MS Channelanglesrods & Fixing with CC foundation in Primary& Sec drain of CVP-3 |
169 |
000-09-N-J-N-D-FO-030 |
|
Removing of silt in SSWD K-103 from Victoria bridge to Palm groove road bridge in Victoria layout |
170 |
000-09-N-J-N-D-FO-028 |
|
Construction of RCC Retaining wall Adjacent to Nandhini Hotel in Challagatta Valley Package-3 |
171 |
000-09-N-J-N-D-FO-027 |
|
SHIFTING OF AYYEPPA TEMPLE TC NO.63 500 KVA AT KRISHNAMMA GARDEN IN WARD 92 UNDER CHALLAGATTA VALLEY PACKAGE -1 |
172 |
000-09-N-J-N-D-FO-025 |
|
Realignment of 3x400 Sq.mm XLPE HTUG Cable and 240 Sq.mm LTUG Cable at Jn of Nala Road& Kamraj Rd W.N-81 in CVP-2 |
173 |
000-09-N-J-N-D-FO-024 |
|
Rerouting of existing 3x400 Sq.mm and 3x95 Sq.mm X LPE HT UG Loop Cable at St.John Road Sree Jn Ulsoor in Wd No.-81 in CVP-2 |
174 |
000-09-N-J-N-D-FE-002 |
|
providing chain link fencing along primary and secondery storm water drain in v.valley from maruthi nagar to vrishabhavathi nagar. |
175 |
000-09-N-J-N-D-DE-007 |
|
REMOVAL OF SILT / DEBRIES IN SECONDARY DRAIN H-101 FROM CH.0 TO CH.625.00M IN HVP - 1. |
176 |
000-09-N-J-N-D-DE-006 |
|
REMOVAL OF SILT / DEBRIES IN PRIMARY DRAIN H-100 FROM CH.1200.00 TO CH.3300.00M IN HVP - 1 |
177 |
000-09-N-J-N-D-DE-005 |
|
REMOVAL OF SILT / DEBRIES IN PRIMARY DRAIN H-100 FROM CH 0 TO 1200 AND SECONDARY DRAIN H-103 FROM CH 230 TO 1100 IN HVP-1 |
178 |
000-09-N-J-N-D-DE-003 |
|
REMOVAL OF SILT/ DEBRIES IN STORM WATER DRAIN H-104 FROM CH.100 TO CH.2800M IN HVP-1. |
179 |
000-09-N-J-N-C-FO-001 |
|
Construction of RCC retaining wall along right side of V-Valley opp to BWSSB STP at Mailasandra by the side of Mysore Road Ch:17630 to 17750 Mtrs |
180 |
000-09-N-J-D-FO-032 |
|
CONSTRUCTION OF U SHAPED RCC DRAIN FROM CH:1560 M TO CH:1905 M IN C200 AT 106 INFANTRY BATTALION AREA S.K.GARDEN UNDER CHALLAGATTA VALLEY PACKAGE -I |
181 |
000-08-NJND-PC-001 |
|
Providing Bed treatment to Primary drain H-300 from Ch-2000 to Ch-5000 in Hebbal Valley P-III |
182 |
000-08-NJND-FO-029 |
|
Providing fabricating crash barrier with MS channel angle rods and laying and fixing with concrete foundation in primary and secondary SWD of Hebbal valley |
183 |
000-08-NJND-FO-008 |
|
Providing and fixing chainlink fencing to H-300 from Ch:3300.0m to 5000.00m in HVP-III |
184 |
000-08-NJND-FE-021 |
|
Providing and fixing chainlink fencing to seconadry drain H-304 and H-305 in HVP-III |
185 |
000-08-NJND-FE-020 |
|
Providing and fixing chainlink fencing in Hebbal Valley P-IV primary drain H-400 wherever necessary |
186 |
000-08-NJND-FE-010 |
|
Providing and fixing Chainlink fencing in Hebbal valley P-I primary drain from Ch:00m to Ch:4375.00m and H-104 secondary drain from Ch:0m to Ch:2650m in Hebbal Valley P-I |
187 |
000-08-NJND-FE-001 |
|
Providing and fixing Chainlink fencing in Hebbal valley P-III secondary drain H-306. |
188 |
000-08-NJND-F0-002 |
|
Construction of RCC retaining wall near Dr.Ambedkar Medical College in Hebbal Valley P-III (Missing bits) |
189 |
000-08-NJNC-FO-001 |
|
Construction of SSM retaining wall to primary drain H-300 from Ch:3000.00m to Ch:5000.00m in Hebbal Valley P-III |
190 |
000-08-N-J-N-D-FO-067 |
|
Construction of SSM drain with deck slab accross 5th main and 2nd cross road leading to lottegollahalli in RMV 2nd stage near sterling apartment. |
191 |
000-08-N-J-N-D-FO-063 |
|
Construction of SSM SWD in Badappa Colony frm Ch:450 to 700m Katalipalya drain frm Ch:360 to 544 inside MEG & Centre Remodelling in CVP-I |
192 |
000-08-N-J-N-D-FO-061 |
|
Construction of Box drawin fromCh: 650.00 to 813.00 M (from Gurunanak Bhavan to Badminton Association in C.V.P.-II |
193 |
000-08-N-J-N-D-FO-041 |
|
Providing chain link fencing from Tumkur ring road to Laggere bridge near Nandini Layout in V-Valley P-3 |
194 |
000-08-N-J-N-D-FO-028 |
|
Emergent construction of bridges RCC retaining RCC U-shape drain SSM retaining walls in CVP-II |
195 |
000-08-N-J-N-D-FO-023 |
|
Construction of cultrs @ MEG & Centre & Reconstruction of damaged SSM Retaining wall at Muddamma Garden in CVP-I |
196 |
000-08-N-J-N-D-FO-022 |
|
construction of RCC Drain from Ch5.7km to6.3km to vrishabavathi valley V200 at Sannakki bayalu. |
197 |
000-08-N-J-N-D-FO-016 |
|
Remodelling of Culvert at Ch:1850m Excutive Engineer Office(West) in in Vrishabhavathi Valley Package-1 |
198 |
000-08-N-J-N-D-FO-015A |
|
Remodelling of Culvert at Ch:1900m at Rajive Gandhi Circle Jakkarayana Kert in Vrishabhavathi Valley Package-1 |
199 |
000-08-N-J-N-D-FO-015 |
|
Soil Investigation at the site for the proposed Bridge Construction at Rajiv Gandhi ground in Vrishabhavathi Valley Package-1 |
200 |
000-08-N-J-N-D-FO-011 |
|
Remodeling of SWD from Vishveshwaraiah Cirlcle SMS layout To 18th Cross of Gowramma Layout In Bommanahalli Zone |
201 |
000-08-N-J-N-D-FO-007 |
|
Remodeling of Storm Water Drain from Puttenahalli Tank Waste Weir To Esteem Park Apartment Ayodyanagara |
202 |
000-08-N-J-N-D-FO-003 |
|
Remodeling of Storm Water Drain from 1st main of Astalkshmi layout to 24 th mainch 300 to 375375 to 450 ch 450t o 525 |
203 |
000-08-N-J-N-D-FE-019 |
|
Providing Chain link fencing on either side of V.Valley in Primary & Sec. drain frm Sanky Tank to Vattal Nagaraj Road in Vrishabhavathi Valley Package-1 |
204 |
000-08-N-J-N-D-FE-013 |
|
Providing Chainlink Fencing to Primary & Secondary drain of Challagatta valley Package-3 |
205 |
000-08-N-J-N-D-FE-012 |
|
Providing Chainlink Fencing to Primary Storm Water Drain in Challagatta Valley Package-2 |
206 |
000-08-N-J-N-D-FE-001A |
|
Providing Chainlik Fencing to |
207 |
000-08-N-J-N-D-FE-001 |
|
Providing Chailink Fencing for Secondary & part Primary drain in Challagatta Valley Package-2 |
208 |
000-08-N-J-N-C-FO-056 |
|
Construction of SSM retaining wall in secondary drain H-104 in Hebbal valley P-I |
209 |
000-08-N-J-I-R-WD-039 |
|
Providing utility cable ducts and chambers for BESCOM and other utility cables in Hosur Road RHS from Yankey Factory to Ayyappa Temple |
210 |
000-08-N-J-I-R-WD-038 |
|
Providing utility cable ducts and chambers for BESCOM and other utility cables in Hosur Road RHS from Ayyappa Temple to Central Silk Board Junction |
211 |
000-08-N-J-I-R-WD-037 |
|
"Drilling of Borewell in front of Cauvery Guest House in UAS & GKVK Quarters for Horticultural Guarden at Bellary Road" |
212 |
000-07N-Z-I-D-FO-006 |
|
Construction of SWD from Jyothipura slum to Vibhuthipura tank via L.B. Shashtri Nagar. |
213 |
000-07-N-Z-I-D-FO-030 |
|
Construction of SWD from Kalkere Tank to Rampura Tank. |
214 |
000-07-N-Z-I-D-FO-020 |
|
Construction of SWD from Vengaiahnakere to Sigenahalli tank. |
215 |
000-07-N-Z-I-D-FO-019 |
|
Construction of SWD including RCC/SSM Retaining wall CD works and other allied works from Subhash Nagara Tank to V.Valley Main in RR Zone |
216 |
000-07-N-Z-I-D-FO-013 |
|
Construction of SWD from Kalkere Tank to Rampura Tank. |
217 |
000-07-N-Z-I-D-FO-012 |
|
Construction of SWD from Gangashetty Tank to Basavanapura main road via Devasandra main road. . |
218 |
000-07-N-Z-I-D-FO-010 |
|
Construction of SWD from Devasandra tank to Basavanapura main road |
219 |
000-07-N-Z-I-D-FO-009 |
|
Construction of SWD from Vibhuthipura Tank to Basavanagara main road . |
220 |
000-07-N-Z-I-D-FO-008 |
|
Construction of SWD from Nagara kere to Vengaiahnakera. |
221 |
000-07-N-Z-I-D-FO-007 |
|
Construction of SWD from Basavanagara main road to Doddanakundi tank via HAL LC Division |
222 |
000-07-N-Z-I-D-FO-005 |
|
Construction of SWD from Vijayanapura (Ambedkar slum) to Ramamurthy Nagaramain road via (ITI Compound). |
223 |
000-07-N-Z-I-D-FO-004 |
|
Construction of SWD from Vibhuthipura Tank Waste weir to Kalappa Block. |
224 |
000-07-N-Z-I-D-FO-003 |
|
Construction of SWD from Doddanakundi tank via HAL Marathahalli main road. |
225 |
000-07-N-Z-I-D-FO-002 |
|
Construction of SWD from Basavanapura main road to Seegehalli. |
226 |
000-07-N-Z-I-D-FO-001 |
|
Construction of SWD from Vengaiahnakere to Sigenahalli tank. |
227 |
000-07-N-J-I-D-FO-016 |
|
Construction of SWD including RCC/SSM Retaining walls CD works and other allied works from Ullal Main road to Subhashnagar Tank in RR Zone-4 |
228 |
000-06-N-K-P-D-FO-001 |
|
REMODELLING OF PRIMARY AND SECONDARY STORM WATER DRAINS IN HEBBAL PACKAGE -II |
229 |
000-06-N-K-P-D-F0-001(package4) |
|
Remodelling of primary and secondary storm water drain under Hebbal Valley P-IV |
230 |
000-06-N-K-P-D-F0-001(P3) |
|
Remodeling of primary and secondary storm water drain under Hebbal Valley P-III |
231 |
000-06-N-K-P-D-F0-001(P1) |
|
REMODELLING OF PRIMARY AND SECONDARY STORM WATER DRAINS IN HEBBAL VALLEY PACKAGE - I |
232 |
000-06-N-H-N-D-SM-001 |
|
Remodelling of Primary & Secondary drain Storm Water Drain in Vrishabhavathi Valley Package-2 |
233 |
000-04-N-R-N-D-FO-002 |
|
Remodelling of Primary & Seconsary Storm Water Drain in Challagatta Valley Package-3 |
234 |
000-04-N-R-N-D-FO-001 |
|
Remodelling of Primary and Secondary SWD in Kormangala Valley Package-3 |
235 |
000-04-N-P-N-G-FO-002 |
|
Remodelling of Primary and Secondary Storm Water Drain (SWD) in Kormangala Valley Package-1 |
236 |
000-04-N-P-N-FO-001 |
|
Remodelling of Primary and Secondary SWD in Kormanagala Valley Package-1 |
237 |
000-04-N-J-N-D-FO-002 |
|
Remodelling primary and Secondary storm water drain in challaghatta Valley Package 2 |
238 |
000-06-N-K-P-D-F0-001 |
|
REMODELLING OF PRIMARY AND SECONDARY STORM WATER DRAINS IN HEBBAL VALLEY PACKAGE - I |
239 |
000-06-N-K-P-D-F0-001 |
|
Remodelling of primary and secondary storm water drain under Hebbal Valley P-IV |
240 |
000-06-N-K-P-D-F0-001 |
|
Remodeling of primary and secondary storm water drain under Hebbal Valley P-III |
241 |
|
|
Soil Investigation at the site for the proposed Bridge Construction at Rajiv Gandhi ground in Vrishabhavathi Valley Package-1 |
242 |
|
|
Resectioing of earth from the H-300 from STP to Kalkere tank in HVP-IV |
243 |
|
|
Reconstruction of RCC box culverts across SWD (DH-211) Ch1350m on main road of Peenya industrial Association near HDFC bank of Chokkasandra in Dasarahalli Zone |
244 |
|
|
Reconstruction of RCC box culverts /Bridges at Ch.465 & 500m from Bagalgunte tank to Sharadha vidyapeta in Dasarahalli ZOne (Srain DH-232-234) |
245 |
|
|
Re-Construction of RCC box ulverts across SWD (DH-311) at 950m at U/s side of Shivapura Tank at Dasrahalli ZOne in Bagalagunte city near abhiman petrol Bank |
246 |
|
|
Re- Construction of RCC box culverts across SWD (DH-211)at Ch 2175m main road from NH4 to P.Industrial estate near Mahimappa School adjecent to Dasarahalli Tank |
247 |
|
|
Providing and fixing chainlink fencing to H-300 in Telecom layout in HVP-IV |
248 |
|
|
Providing and fixing chainlink fencing to H-300 in Hennur main road (east side Ch:0.00m to 140.00m ) in HVP-IV |
249 |
|
|
Providing and fixing chainlink fencing to H-300 in Hennur main raod from Ch:140.00m to 280.00m in HVP-IV |
250 |
|
|
Providing and fixing chailink fencing to H-400 in Kalyan Nagar in BDA layout in HVP-IV |
251 |
|
|
kamalanagar |
252 |
000-11-NPND-FO-016 |
|
Formation and construction of strom water drain from Jothi nurshing home to Basappanna katte in GKW Layout in Laggere Range at Dasarahalli Zone |
253 |
|
|
construction of U-Shape RCC drain from Hesraghatta main road up to Bagalagunte in Dasrahalli Zone.(Link DH233)from 650 to 1325m. |
254 |
|
|
Construction of U shape RCC drain from Hesraghatta main road up to Bagalgunte in Dasarahalli Zone (Link DH 233) from 0 to 650m |
255 |
|
|
Construction of U shape RCC drain from Bagalagunte tank to Sharada vidyapeta in Dasrahalli Zone (link DH 232-34) from 0 to 650m |
256 |
|
|
Construction of U shape drain to H-400 primary drain Ch:3300.0m to 3800.00m in Hebbal Valley P-4 |
257 |
|
|
Construction of U shape drain from Ch:3800.00m to Ch:4200.00m in HVP-4 |
258 |
|
|
Construction of RCC U shape drain to secondary SWD from Hennur main road near police station to H-300 in HVP-IV |
259 |
|
|
Construction of RCC U shape drain From Dr AMC upto Nagavara main road in HVP-III |
260 |
|
|
Construction of RCC retaining wall to primary SWD H-400 from Ch:2800.00m to 3300.00m in HVP-IV |
261 |
|
|
Construction of RCC retaining wall to H-300 from Hennur main road to STP Ch:6800.00m to 7200.00m in HVP-IV |
262 |
|
|
Construction of RCC box culverts/Bridge at Ch 790m & 1300m of (DH233) from Hesraghatta main road to Bagalgunte tank in Defence colony Dasarahalli Zone |
263 |
|
|
Construction of RCC box culverts/ Bridges at Ch.412m & 570 m of (DH 233) from Hesraghatta main road ro Bagalgunte tank in defence colony Dasarahalli ZOne. |
264 |
|
|
Construction of RCC box culverts /Bridges at Ch125212m & 312m of (DH 233) from Hesraghatta main road to Bagalgunte Tank in Defence colony D.Zone. |
265 |
|
|
Construction of RCC box culverts /Bridges at Ch.350m & 675m from Bagalgunte tank to Sharadha Vidyapeta in Dasarahalli Zone (Drain DH 232-234) |
266 |
|
|
Construction of masonary drain and providing chainlink fencining to SWD (clearing of Encrochment )at Rukmininagar in D.Zone. |
267 |
|
|
Construction of box type drain to SWD in Jai Bharath Nagar in HVP-III |
268 |
|
|
Construction of box type drain from Basavanapura main road upto Dr AMC in HVP-III |
269 |
|
|
Construction of box type culvert to H-300 in Hennur main road at Ch:1800.00m in HVP-III |
270 |
|
|
Construction of box type culvert at Kaval Byrasandra in secondary drain H-308 in HVP-III |
271 |
|
|
Construction of box type culvert across seconadry SWD H-303 joining H-300 in Hebbal Valley P-3 |
272 |
|
|
Construction of box type culvert across H-300 in Janakirama temple in KHB at HVP-III |
273 |
|
|
Construction of box type culvert across H-300 in HBR layout at Ch:2100.00m in HVP-III |
274 |
|
|
Construction of box culvert at Vaddra Palya main road to H-400 in HVP-IV |
275 |
|
|
Construction of Balance U shape drain in Khushal Nagar area in HVP-III |
276 |
|
|
SHIFTING OF AYYEPPA TEMPLE TC NO.63 500 KVA AT KRISHNAMMA GARDEN IN WARD 92 UNDER CHALLAGATTA VALLEY PACKAGE -1 |
277 |
|
|
Resectoning of Storm Water Drain fromBenniganahalli Tank to Kagadasapura Tank |
278 |
|
|
Resectioning of Lead off Drain From GM Palya 4th Main towards Byrasandra - Kagadasapura Tank SWD |
279 |
|
|
Resectioning and widening of Rajakaluves from Amruthahally tank to Rachenally Tank and Rachenally tank to Mariyannanapalya drain in Hebbal valley P-II |
280 |
|
|
Remodelling of Secondary of V.Valley in pipeline Road 3rd Cross Malleshwaram(Ch:300 to 325mtrs) in Vrishabhavathi Valley Pcckage-1 |
281 |
|
|
Reconstruction of RCC box culverts across SWD (DH-211) Ch1350m on main road of Peenya industrial Association near HDFC bank of Chokkasandra in Dasarahalli Zone |
282 |
|
|
Reconstruction of RCC box culverts /Bridges at Ch.465 and 500m from Bagalgunte tank to Sharadha vidyapeta in Dasarahalli ZOne (Srain DH-232-234) |
283 |
|
|
Re-Construction of RCC box ulverts across SWD (DH-311) at 950m at U/s side of Shivapura Tank at Dasrahalli ZOne in Bagalagunte city near abhiman petrol Bank |
284 |
|
|
Re- Construction of RCC box culverts across SWD (DH-211)at Ch 2175m main road from NH4 to P.Industrial estate near Mahimappa School adjecent to Dasarahalli Tank |
285 |
|
|
Providing lead off Storm Water Drain From 5th main malleshpalya and surrounding areasUp To Kagadasapura -Doddanakundi SWD |
286 |
|
|
Providing Lead off Drain From Nagarapalya Upto SWD of Beneganahalli -Kagadasapura Tank SWD |
287 |
|
|
Providing Lead off Drain From Nagarapalya Main Road towards Beneganahalli -Kagadasapura Tank SWD |
288 |
|
|
Providing and fixing chainlink fencing to H-300 in Telecom layout in HVP-IV |
289 |
|
|
Providing and fixing chainlink fencing to H-300 in Hennur main road (east side Ch:0.00m to 140.00m ) in HVP-IV |
290 |
|
|
Providing and fixing chainlink fencing to H-300 in Hennur main raod from Ch:140.00m to 280.00m in HVP-IV |
291 |
|
|
Providing and fixing chailink fencing to H-400 in Kalyan Nagar in BDA layout in HVP-IV |
292 |
|
|
Formation and construction of strom water drain from Jothi nurshing home to Basappanna katte in GKW Layout in Laggere Range at Dasarahalli Zone |
293 |
|
|
construction of U-Shape RCC drain from Hesraghatta main road up to Bagalagunte in Dasrahalli Zone.(Link DH233)from 650 to 1325m. |
294 |
|
|
Construction of U shape RCC drain from Hesraghatta main road up to Bagalgunte in Dasarahalli Zone (Link DH 233) from 0 to 650m |
295 |
|
|
Construction of U Shape RCC drain from Bagalagunte tank to Sharadha VIdyapeta in Dasarahalli Zone (LinkDH232-34) From 650 to 1325m |
296 |
|
|
Construction of U shape RCC drain from Bagalagunte tank to Sharada vidyapeta in Dasrahalli Zone (link DH 232-34) from 0 to 650m |
297 |
|
|
Construction of U shape drain to H-400 primary drain Ch:3300.0m to 3800.00m in Hebbal Valley P-4 |
298 |
|
|
Construction of U shape drain from Ch:3800.00m to Ch:4200.00m in HVP-4 |
299 |
|
|
construction of SWD of Kadugudi-Channasandra road to FCI compound of Kadugudi (From Chainage: 300.00 m to 900.00 m) |
300 |
|
|
Construction of Storm Water drain from Pattalamma layout to Dakshina pinakini river Siddartha layout ( from Ch:870m to 1750m) |
301 |
|
|
Construction of Storm Water drain from Pattalamma layout to Dakshina pinakini river Siddartha layout ( from Ch: 0 m to 300 m) |
302 |
|
|
construction of Storm Water Drain from Nallurahalli Kere to Seemantha halli kere near Borewell Road White field Area Mahadevapura Zone. |
303 |
|
|
Construction of RCC U shape drain to secondary SWD from Hennur main road near police station to H-300 in HVP-IV |
304 |
|
|
Construction of RCC U shape drain From Dr AMC upto Nagavara main road in HVP-III |
305 |
|
|
Construction of RCC retaining wall to primary SWD H-400 from Ch:2800.00m to 3300.00m in HVP-IV |
306 |
|
|
Construction of RCC retaining wall to H-300 from Hennur main road to STP Ch:6800.00m to 7200.00m in HVP-IV |
307 |
|
|
Construction of RCC Box Drain along 14th Cross of Byrasandra from Malnad Apartments up to Kaggadasapura tank |
308 |
|
|
Construction of RCC box culverts/Bridge at Ch 790m and 1300m of (DH233) from Hesraghatta main road to Bagalgunte tank in Defence colony Dasarahalli Zone |
309 |
|
|
Construction of RCC box culverts/ Bridges at Ch.412m and 570 m of (DH 233) from Hesraghatta main road ro Bagalgunte tank in defence colony Dasarahalli ZOne. |
310 |
|
|
Construction of RCC box culverts /Bridges at Ch125 212m and 312m of (DH 233) from Hesraghatta main road to Bagalgunte Tank in Defence colony D.Zone. |
311 |
|
|
Construction of RCC box culverts /Bridges at Ch.350m and 675m from Bagalgunte tank to Sharadha Vidyapeta in Dasarahalli Zone (Drain DH 232-234) |
312 |
|
|
Construction of masonary drain and providing chainlink fencining to SWD (clearing of Encrochment )at Rukmininagar in D.Zone. |
313 |
|
|
Construction of box type drain to SWD in Jai Bharath Nagar in HVP-III |
314 |
|
|
Construction of box type drain from Basavanapura main road upto Dr AMC in HVP-III |
315 |
|
|
Construction of box type culvert to H-300 in Hennur main road at Ch:1800.00m in HVP-III |
316 |
|
|
Construction of box type culvert at Kaval Byrasandra in secondary drain H-308 in HVP-III |
317 |
|
|
Construction of box type culvert across seconadry SWD H-303 joining H-300 in Hebbal Valley P-3 |
318 |
|
|
Construction of box type culvert across H-300 in Janakirama temple in KHB at HVP-III |
319 |
|
|
Construction of box type culvert across H-300 in HBR layout at Ch:2100.00m in HVP-III |
320 |
|
|
Construction of box culvert at Vaddra Palya main road to H-400 in HVP-IV |
321 |
|
|
Construction of Balance U shape drain in Khushal Nagar area in HVP-III |
322 |
No |
|
Reomdelling of Secondary SWD k-209 from Bannerughatta Road to Ranka colony in Koramangala Valley P-3 |
323 |
CC-DD-EE |
|
RRRRRRRRRRRRRRRR |
324 |
BB-EE-DD |
|
FFFFFFFFFFFFF |
325 |
BB-CC-DD |
|
bbbbbbbbbB |
326 |
AA-BB-CC |
|
AAAAAAAAAAAAAAAAAA |
327 |
205-09-N-J-N-D-FO-005 |
|
Reconstruction of Collapsed SSM Wall at Sumanahalli Near Magadi Road of SWD from Ring Road to V.Valley in RR Nagara Zone |
328 |
205-09-N-J-N-D-FO-004 |
|
Construction of RCC Box at Uttarahalli Tank and Reconstruction of collapsed SSM Wall in SWD in K.S.Layout in RRN Zone |
329 |
205-09-N-J-N-D-FO-001 |
|
Remodeling of SWD from Kumaraswamy layout To Dorekere ch 0.00 to 420 mtr |
330 |
205-08-N-J-N-D-FO-001 |
|
Construction of Box culvert across Bangalore-Nysore Main Road in front of THE CLUB in Vrishabhavathi Valley package-4 |
331 |
204-09-N-J-N-D-FO-011 |
|
Formation of SWD from Sarakki Tank inlet weri to Sarkki Tank Waste Weir in Bommanahalli Zone |
332 |
201-09-N-P-P-O-M1-001 |
|
Consultency Service for Remodeling of SWD in Bommanahalli Zone |
333 |
201-09-N-J-N-D-FO016019010020 & 022 |
|
Construction of RCC Box culvert at ch 750 782 960 to 1030 in SWD from Arekere Tank Waste Weir To Royal residence layout and to 80 feet of BDA Road in bommanahalli Zone |
334 |
201-09-N-J-N-D-FO-034 |
|
Formation of new drain and resectioning of Rajakaluve from KPTCL muss to tank bed Bommanahalli |
335 |
201-09-N-J-N-D-FO-027 |
|
Remodeling of swd from Begur Waste weir to NH7 Bnagalore Hosur Road from ch:1000 to 1500m in Bommanhalli |
336 |
201-09-N-J-N-D-FO-025 |
|
Remodeling of SWD from Begur Tank Waste Weir to NH-7 of Bangalore-Hosur Road ch 500.00 to 1000.00 in bommanahalli zone |
337 |
201-09-N-J-N-D-FO-007 |
|
Remodeling of swd from Begur waste weir to nh7 Bangalore Hosur road from ch:1500 to 2000m in Bommanahalli |
338 |
201-09-N-J-N-D-FO-006 |
|
Remodeling of SWD from Begur tank waste weir to NH-7 of bangalore Hosur road Ch 2000.00 to 2500.00 mtr in bommanahalli zone |
339 |
201-09-N-J-D-FO-008014010015018&026 |
|
Construction of RCc Box Type Culvert at ch 130 225 290 325 360 and 390 in SWD from Arikere Tank Waste Weir To Royal Residency layout in Bommanahalli Zone |
340 |
201-05-M-O-E-D-DE-014 |
|
Construction of RCC Box Drain@ Puttenahalli Annaiah Reddy layout of 28th main to 24th main .ch 525 to 665 in bommanahalli Zone |
341 |
201-0-N-J-N-D-FO-029 |
|
Remodeling of SWD from Begur Tank Waste Weir to NH-7 of Bangalore- Hosur Main road in bommanahalli zone |
342 |
053-09-N-J-N-D-FO-001 |
|
Construction of RCC Box drain from 11th Cross Srinagara to Kalidasa layout BMTC Bus Stand in Vrishabhavathi Valley Package-5 |
343 |
053-08-N-J-N-D-FO-004 |
|
Construction of RCC drain from 13th Main Road of Srinagara to kalidasa Layout in Vrishabhavathi Valley Package-5 |
344 |
053-08-I-J-N-D-IM-001 |
|
Remodelling of drain from Bank Colony to Venkateshwara Temple and Maruthi Circle to Venkateshwara Temple in VVP-5 |
345 |
049-08-I-T-N-D-IM-001 |
|
Remodelling of SWD drain Vidyarthi Bhavana to Ramkrishana Mutt in Vrishabhavathi Valley Package-4 |
346 |
043-N-J-N-D-FO-001 |
|
Construction of RCC Box Culvert at 6th Cross and Providing improvement to drains in 7th and 8th Cross of Padarayanapura in Vrishabhavathi Valley Package-1 |
347 |
041-09-N-J-N-D-FO-056 |
|
Reconstruction of collapsed SSM Retaining wall Near barial ground at Shree Ranga Nagara |
348 |
041-09-N-J-N-D-F0-056 |
|
Reconstruction of collapsed SSM retaining wall near Burial Ground at Shree Ranga Nagara at ward No 41 |
349 |
039-09-N-J-N-D-FO-002 |
|
Remodelling of Road Side Secondary SWD frm 2nd Cross to Nayandahalli Main Road near Railway Gate Vrishabhavathi Valley Package-4 |
350 |
039-09-N-J-N-D-FO-001 |
|
Remodelling of eixisting brdge at 80ft Road in Chandra Layout on Secondary Drain Vrishabhavathi Valley Package-4 |
351 |
038-06-N-H-N-D-IM-001A |
|
Construction of RCC Box drain from Bull Temple Road Shakarapuram Telephone Exchange to Kempabudi Tank in KG Nagara Ward No.49 in VVP-5 |
352 |
037-09-N-J-N-D-FO-001 |
|
Formation of 60feet approach raod to Bridge of Vrishubavathi Valley at Pattegarapalya of Ward No-37 in Bangalore city |
353 |
036-09-N-J-N-D-FO-003 |
|
Construction of U-Shape drain to Sec. SWD frm 5th Cross along 1st Main up to 1st Cross of Muneshwara Nagara in VVP-4 |
354 |
036-09-N-J-N-D-FO-001 |
|
Construction of RCC box drain to secondary SWD from Eastern side 1st main (Dhanvanhriclinic) of Kaveripura to Balainakere valley of ward no-36 in Bangalore city |
355 |
035-09-N-J-N-D-FO-001 |
|
Remodelling of Secondary SWD frm 2nd Crosss to 3rd Cross GKW Layout near Kanakanagara |
356 |
034-06-I-S-E-R-IM-001A |
|
Remodelling of SWD from Kalidasa Nursing Home to Kempegowda nagara main Road in Vrishabhavathi Valley Package-5 |
357 |
034-06-I-S-E-R-IM-001 |
|
Construction of RCC bridge across SWD in V.Valley 1st Main Kaveripura |
358 |
032-09-N-G-N-D-FO-001 |
|
Reconstruction of Side walls in Vrishabhavathi Valley at Bhuvaneshwari Nagara ward-4 K.P.Agrahara area of P and S drains in V.V Package-1 |
359 |
000-SWD2 |
|
Reconstruction of (Repeated work deleted)- to upload new work |
360 |
000-SWD |
|
Construction of (Repeated work Deleted) - (to upload other work) |
361 |
000-10-N-J-N-U-EM-002 |
|
Remo of SWD U/S of BG Road near Ranka Colony Shifting/reallinment of HT/LT cables crossing SWD D/S of Bridge |
362 |
000-10-N-J-N-U-EM-001 |
|
Remodeling of SWD K209 U/S of BG road- ranka colony Shifting of HT/LT cables Crossing SWD U/S of bridge |
363 |
000-10-N-J-N-FO-039 |
|
Construction of RCC Retaining wall ( Bothside) from Ch: 5200 to 5640.0m for Pri SWD K-100 of KV betw LR Slum and Annepalya |
364 |
000-10-N-J-N-D-MI-001 |
|
Preparation of design drawing for construction of 250KLD STP at V.Valley frm Magadi Road to Mysore Road Vrishabhavathi Valley Package-4 |
365 |
000-10-N-J-N-D-FO-100 |
|
construction of Retaining wallat the Junction of University and Vrishabavathi main valley left side from Ch:13230 to 13385mtrs |
366 |
000-10-N-J-N-D-FO-098 |
|
Constn of RCC box drain for Secondary SWD in K-103 and RCC pre cast segment of size 3.0 x 2.6m for rd portn at Magarath road near Garuda Mall in koramangala valley P-I |
367 |
000-10-N-J-N-D-FO-097 |
|
Construction of RCC box drain and SSM Retaining wall for secondary SWD K-107 at Vinayakanagar 3rd cross in KVP-1 |
368 |
000-10-N-J-N-D-FO-090 |
|
Construction of Bridge across V-300 at Ch:1905m across Girinagara 2nd Phase in Vrishabhavathi Valley Package-5 |
369 |
000-10-N-J-N-D-FO-088 |
|
Construction of C.D.Works and RCC Box drain for SWD frm Jayanagara Naftinal College to Petrol Punk Circle and Behind Big Bazar to Petrol Bunk KVP-3 |
370 |
000-10-N-J-N-D-FO-084 |
|
Construction of RCC U-shape SWD frm Hosure Rd to Parappana Aghrahar Tank in G.K.Layout Ch:5500 to 1070mtrs in Bommanahalli Zone |
371 |
000-10-N-J-N-D-FO-082 |
|
Construction of RCC Box drain from Navodaya layout to J.P.Nagar 6th Phase Joins K-210 frm Ch:350to 750 in Koramangala Valley Package-3 |
372 |
000-10-N-J-N-D-FO-081 |
|
Construction of RCC Retaining wall near Sanjayanagara Slum in Tmber Yard layout SWD -Secondary drain V-102 Ch:750 to 800m of VVP-5 |
373 |
000-10-N-J-N-D-FO-080 |
|
consrtuction of RCC retaining wall in Primary Drain K-100 on Ejipura side (Left Hand Side) from chainage 7084 mts to 7650 mts in Koramangala Valley Package €“II. |
374 |
000-10-N-J-N-D-FO-079 |
|
Reconstruction of Collapsed SSM (M.T.B) for Secondary SWD in K_209 at Marenahalli in Koramangala Valley Package-3 |
375 |
000-10-N-J-N-D-FO-078 |
|
Construction of SSM Side wall in V-100 Primary Valley at Ch:5800 to 6000 at Chelluvappa Garden in Vrishabhavathi Valley Package-1 |
376 |
000-10-N-J-N-D-FO-077 |
|
Reconstruction of dilapilated right side SSM Side wall Primary valley V-100 after Padarayan Bridge in Ch:6250-6300 in Vrishabhavathi Valley Package-1 |
377 |
000-10-N-J-N-D-FO-076 |
|
Construction of Side SSM wall in V-100 Primary valley at Ch:4900 beside Magadi Main Raod in Vrishabhavathi Valley Package-1 |
378 |
000-10-N-J-N-D-FO-075 |
|
Remodelig of Tertiary drain in V.Valley in magadi road in 10th cross Back side of Mariyamma temple in ward No-32 |
379 |
000-10-N-J-N-D-FO-074 |
|
Reconstruction of SSM Side wall and disilting Sec. Valley and Primary Valley in K.P.Agrahara of Vrishabhavathi Valley Package-1 |
380 |
000-10-N-J-N-D-FO-073 |
|
Reconstruction of Side wall in V-106 Sec drain in JJR Nagara Rayapura Main Road in ward No-44 in Vrishabhavathi Valley Package-1 |
381 |
000-10-N-J-N-D-FO-072 |
|
Remodelling of SSM Retaining wall in Sec Valley V-105 ward No-44 at V.S.Garden near Padarayanapura in Vrishabhavathi Valley Package-1 |
382 |
000-10-N-J-N-D-FO-069A |
|
Reconstruction of SSM Side wall in V-112 Secondary Valley in Prakash Nagara 8th Cross in ward No-23 Ch:2000 to 2100 in Vrishabhavathi Valley Package-1 |
383 |
000-10-N-J-N-D-FO-068 |
|
Construction of RCC Box Drain frm Chikkanahalli to Sriram Nagara Joints SWD frm Beguru tank At Hongasandra in Bommanahalli Zone |
384 |
000-10-N-J-N-D-FO-067 |
|
Construction of RCC Box Culvert for SWD in front of Mukthi Dhama 13th Main Road of Srinivasanagara ward No-54 of Vrishabhavathi Valley Package-5 |
385 |
000-10-N-J-N-D-FO-066 |
|
Reconstruction of Bridge Using RCC Precast Cellular Segments near BMTC Depo kamakya Ring Rd in Vrishabhavathi Valley Package-5 |
386 |
000-10-N-J-N-D-FO-062 |
|
Providing and fabricating MS steel Foot Bridge across SWD v-303 at ch 3800m at Ittamadu and prvdg C.C to cellular elements and rd at CT bed area in BSK 3rd stage |
387 |
000-10-N-J-N-D-FO-060 |
|
Reconstruction of SSM Side wall in V-112 Secondary Valley in Prakash Nagara 8th Cross Ward No-23 in Vrishabhavathi Valley Package-1 |
388 |
000-10-N-J-N-D-FO-058 |
|
Reconstruction of SSM in SWD at Chamundeshwari Slum in Girinagara and CT Bed in Ward No-54 in Vrishabhavathi Valley Package-5 |
389 |
000-10-N-J-N-D-FO-057 |
|
Reconstruction of SSM in SWD V-303 behind Co-operative Training Institute Gururaj Layout and 5th Cross of Bagirathi Nagar Syndicate Bank VVP-5 |
390 |
000-10-N-J-N-D-FO-056 |
|
Construction of RCC Box for SWD from Hulimavu tank to Madivala tank Ch:500 to 650mtrs in Bommanahalli Zone |
391 |
000-10-N-J-N-D-FO-055 |
|
Construction of RCC Box for SWD frm Hulimavu Tank to madivala Tank in Bommanahalli tank Ch:350 to 500mtr in Bommanahalli Zone |
392 |
000-10-N-J-N-D-FO-054 |
|
Formation of RCC U-shape SWD frm Hulimavu tank to Madivala tank(BTM 4th stg to Kodichikkannahalli) in Bommanahalli Zone |
393 |
000-10-N-J-N-D-FO-053 |
|
Construction of SWD(RCC Box drain) frm New Mico layout SWD of Dodda Beguru Tank Ch:500 to 1000mtrs in Bommanahalli Zone |
394 |
000-10-N-J-N-D-FO-052 |
|
Construction of SWD(RCC U-shaped) frm Chikka Begur Waste Weir to Nea Mico Layout at Bommanahalli Zone |
395 |
000-10-N-J-N-D-FO-051 |
|
Construction of RCC U-shape SWD from Hosure Rd to Parapana AgraharaTank in G.K.layout frm Ch:0 to 550m in Bommanahalli Zone |
396 |
000-10-N-J-N-D-FO-050 |
|
Rising of SSM wall over Existing retaining wall of SWD K-209 at J.P.Nagara Dollers Colony frm Ch:3400 to 3640m in Kormangala Valley P-3 |
397 |
000-10-N-J-N-D-FO-046 |
|
Construction of RCC Box Drain V-301 frm Ch:115 to 165 mtr Near 6th Main Road Between 4th and 5th Cross of N.R.Colony Sec. drain in Vrishabhavathi Valley Package-5 |
398 |
000-10-N-J-N-D-FO-042 |
|
Allied works to the proposed precast segment bridge at maruthi nagar main road of K-200 Kormangala Valley P-3 |
399 |
000-10-N-J-N-D-FO-038 |
|
Construction of RCC Retaining wall both side from CH 6120mtr to 6360 mtrs for primary SWD K-100 of KVP between L.R slum and Anepalaya |
400 |
000-10-N-J-N-D-FO-037 |
|
Construction of RCC Retaining wall both side from CH 5640mtr to 5880 mtrs for primary SWD K-100 of KVP between L.R slum and Anepalaya |
401 |
000-10-N-J-N-D-FO-036 |
|
Construction of RCC Retaining wall both side from CH 5880mtr to 6120 mtrs for primary SWD K-100 of KVP between L.R slum and Anepalaya |
402 |
000-10-N-J-N-D-FO-031 |
|
Construction of RCC Rwall and SSM wall on left side of Padarayanapura bridge d/s V-100 in Vrishabhavathi Valley Package-1 |
403 |
000-10-N-J-N-D-FO-030 |
|
construction of RCC Retaining wall between chainage 8841 to 8923 mt on left hand side in drain no. K-100 near Inner Ring Road in Koramangala Valley Package - 2. |
404 |
000-10-N-J-N-D-FO-025 |
|
Remodelling of SWD from Anjanadri layout to Doddakallasandra tank near bank colony (Soudhamini choultry) of Bommanahalli zone |
405 |
000-10-N-J-N-D-FO-024 |
|
Reconstruction of SWD and Protective works from Iliyasnagara to K.S.layout 2nd stage in Rajajeshwari Nagra Zone |
406 |
000-10-N-J-N-D-FO-022 |
|
Construction of Bridge using Pre-Cast segment for primary SWD -K -100 at KH road of Koramangala valley |
407 |
000-10-N-J-N-D-FO-019 |
|
Construction of RCC U-shape drain from Banashakari to Navodaya Layout which Joins K-210 (frm Ch:0 to 350mts)in Koramangala Valley P-3 |
408 |
000-10-N-J-N-D-FO-018 |
|
Construction of RCC Box Culvert across Primary SWD in V-300 at Ch:225 at 8th Cross of Girinagra 2nd Phase in Vrishabhavathi Vally Package-5 |
409 |
000-10-N-J-N-D-FO-015 |
|
Construction of Secondary SWDk-103 at Rsidency road and shifting of Power cABLES |
410 |
000-10-N-J-N-D-FO-013 |
|
.Construction of RCC Drain across SWD k-103@ Junction of Residency road and Bridgade Road of Richmond town ward of Bangalore City |
411 |
000-10-N-J-N-D-FO-011 |
|
Construction of collapsed/dilapilated SSM Wall of K-210 near Sindhur kalayan Matapa and 38th Main of Rose Garden of J.P.nagara in KVP-3 |
412 |
000-10-N-J-N-D-FO-010 |
|
Reconstruction of Retaining wall in SWD V-300 frm Ch:3300 to 3328m at 8th Main kalidas Layout in Hosakerahalli Vrishabhavathi Valley P-5 |
413 |
000-10-N-J-N-D-FO-009 |
|
Construction of Retaining wall near in SWD V-303 Ch:3450 to 3425m Near Studio Rd Bhuvaneshwarinagara in VVP-5 |
414 |
000-10-N-J-N-D-FO-004 |
|
CONSTRUCTION OF RCC BOX DRAIN FROM CH 0 TO 260 IN SECONDARY DRAIN H 206 MISSING LONG |
415 |
000-10-N-J-N-D-FO-003 |
|
Providing RCC U-Shape Surface drain along retaining wall frm 1st Cross to 9th Cross of Kamkaya Layout in VVP-5 |
416 |
000-10-N-J-N-D-FO-001 |
|
Construction of Retaining wall for SWD at kadirenahalli Park in Vrishabhavathi Valley Package-5 |
417 |
000-10-M-J-N-D-MI-002 |
|
Providing pole barricading to SWD in differnt locations in KV |
418 |
000-10-M-G-E-D-MI-001 |
|
Removing of silt by Engneering JCB and Tippers from Central silk board junction to Agram lake of primary drain K-200 in P-3 |
419 |
000-10-I-P-P-D-FO-002 |
|
Reconstruction of collapsed SSM wall of K-209 at Dollars colony in KvP-3 |
420 |
000-10-I-P-P-D-FO-001 |
|
Reconstruction of collapsed SSM wall of K-209 at the U/s of Bannerughatta road bridge KV-5 |
421 |
000-09N-J-N-D-FO-045 |
|
Work of removing of silt at diferent locations in Koramangala valley package -2- drain K-100 and drains K-115 K-113 . |
422 |
000-09-N-J-N-D-FO-O39 |
|
Removing silt from masonary drain in 3 rd cross Vinayakanagar from burial burial up to k 100. |
423 |
000-09-N-J-N-D-FO-186 |
|
Construction of RCC Bridge across SWD V-303 at Ch:3800mtr Kakathinagara(Ittamadu) in Vrishabhavathi Valley Package-5 |
424 |
000-09-N-J-N-D-FO-184 |
|
CONSTRUCTION OF BRIDGE ACROSS PRIMARY DRAIN H 200 AT CH 3715 MTR AT NEW BEL ROAD |
425 |
000-09-N-J-N-D-FO-182 |
|
Remodelling of RCC Box Culvert V-105 Secondary Drain from Ch:1110 to 1200 in Vrishabhavathi Vallley Package-1 |
426 |
000-09-N-J-N-D-FO-179 |
|
Remodelling of RCC Box culvert in V-105 of V.Valley 18th Cross of K.P.Agrahara Wn-20(Handi Gudisalu) Vrishabhavathi Valley Package-1 |
427 |
000-09-N-J-N-D-FO-178 |
|
Construction of Sec. SWD K-103 by providing precast segment at residency Road at Koramangala Valley Package-1 |
428 |
000-09-N-J-N-D-FO-176 |
|
Cpnstruction of Earth Retaining structures by providing RCC Precast Cellular Segments of size 2.2X3.0X1.0 man for Side walls of V-301 at Ch:1985 Near CT Bed area VVP-5 |
429 |
000-09-N-J-N-D-FO-172 |
|
Construction of 250KLD STP in Gayitri devi park in ward No-23 in V-116 in Vrishabhavathi Valley Package-1 |
430 |
000-09-N-J-N-D-FO-171 |
|
Opening of covered secondary SWD K-109 from kasturaba road to grant/vitatal Malya road in CTS NO 453 in KV1 |
431 |
000-09-N-J-N-D-FO-170 |
|
Construction of Retaining wall using RCC Pre-cast box of size 3.0x3.0x1.0mtrs in V. Valley on both side fromCH:9.15 to 9.20 Km with road in Vrishabavathi Valley. |
432 |
000-09-N-J-N-D-FO-169 |
|
Construction of Retaining wall using RCC Pre-cast box of size 3x3x1mtr in V.Valley on left side from Ch:9.00 to 9.10Km with road in V Valley. |
433 |
000-09-N-J-N-D-FO-168 |
|
Construction of Retaining wall using RCC Pre-cast box of size 3.0x3.0x1.0mtrs in V.Valley on left side fromCH:8.90 to 9.00 Km with road in Vrishabavathi Valley. |
434 |
000-09-N-J-N-D-FO-162 |
|
Reconstruction of Collapsed SSM and deeping Drain from Shanimahathama Temple to Boregowda Slum in Vrishabhavathi Valley P-5 |
435 |
000-09-N-J-N-D-FO-161 |
|
Reconstruction of Collapsed SSM and Deeping of drain from Timber yard upto Raghavendra layout in Vrishabhavathi Valley Package-5 |
436 |
000-09-N-J-N-D-FO-160 |
|
Remodelling of SSM r/w and Side drain ad desilting in Secondary Valley V-105 Ch:940 to 1000m in W.N-44 of V.Valley Package-1 |
437 |
000-09-N-J-N-D-FO-150 |
|
PROVIDING CHAINLINK FENCING FOR DRAIN NO.100 AT DIFFERENT LOCATIONS FROM CHAINAGE 6600MTS. TO 10300 MTS.ON LHS AND RHS IN KORAMANGALA VALLEY PACKAGE-2. |
438 |
000-09-N-J-N-D-FO-147 |
|
Construction of Retaining wall using RCC Box of size 3.00x3.00x1.00mtrs in Vrishabhavathi Valley in curve portion from chainage 10.260 km to 10.320km. |
439 |
000-09-N-J-N-D-FO-146 |
|
Construction of 1.50mtrs OGEE SPILLWAY in Vrishabavathi Valley at chainage 10.350 km and allid works in Vrishabavathi Valley. |
440 |
000-09-N-J-N-D-FO-145 |
|
Construction of STP of 1MKLD in Vrishabhavathi Valley V-200 near challukya nagara in Vrishabhavathi Valley Package-4 |
441 |
000-09-N-J-N-D-FO-143 |
|
Construction of RCC Retaining wall on LHS frm 5287 to 5299 of K-100 Primary in Koramangala Package-1 |
442 |
000-09-N-J-N-D-FO-142 |
|
Construction of RCC Retaining wall on LHS frm Ch:5275 to 5287 of K-100 Primary SWD in Kormangala Valley Package-1 |
443 |
000-09-N-J-N-D-FO-141 |
|
Construction of RCC Retaining wall on LHS frm Ch:5263 to 5275 of K-100 in Kormangala Valley Package-1 |
444 |
000-09-N-J-N-D-FO-138 |
|
Construction of Retaining Wall from down stream of Rajarjeswarinagar Bridge to Junction of University in V Valley right side from chainage 13385 m to 13695 m |
445 |
000-09-N-J-N-D-FO-133 |
|
Reconstruction of SSM side wall and removing silt in the side drain deeping of drain providing hume pipe crossing in V.Valley in V-116 VVP-1 |
446 |
000-09-N-J-N-D-FO-126 |
|
Remodelling of Box Culvert at Ch:2850 in V-116 Secondary Valley beside Mondovi Motors near Vijayanagara Tolgate in Vrishabhavathi Valley Package-1 |
447 |
000-09-N-J-N-D-FO-125 |
|
Construction of RCC Retaining wall at Cambridge Road frm Ch:6200 to 6470mtrs in Challagatta Valley Package-2 |
448 |
000-09-N-J-N-D-FO-122 |
|
Remodelling of Side drain by the side of P and T Office and Basaveshwara Choultry and Hostel Joining V-116 Sec.drain in Vrishabhavathi Valley Package-1 |
449 |
000-09-N-J-N-D-FO-120 |
|
Remodeling of Secondary Valley V-114 at Ch:550m to 590m of Vrishubavthi Valley by U shape drain in W.No-23 |
450 |
000-09-N-J-N-D-FO-118 |
|
Providing Bed protection work to SWD frm Muneshwara block to Balaiankere and 11th Cross Kavaeripura to Mahadeshwara Rd VVP-4 |
451 |
000-09-N-J-N-D-FO-116 |
|
Construction of Retaining wall for Sec. Storm Water Drain near Kempanna Thota in ward No-37 in Vrishabhavathi Valley Package-4 |
452 |
000-09-N-J-N-D-FO-115 |
|
Construction of RCC Box drain to V.Valle-207 at Shiva Temple Gangagodanahalli Vrishabhavathi Valley Package-4 |
453 |
000-09-N-J-N-D-FO-114 |
|
Construction of RCC Retaining wall to V.Valley V-207 at Hanumanthappa Layout in Vrishabhavathi Valley Package-4 |
454 |
000-09-N-J-N-D-FO-112 |
|
Remodelling of Seccondary SWD frm BDA Layout 2nd Main to 3rd Main Kaveripura in Vrishabhavathi Valley Package-4 |
455 |
000-09-N-J-N-D-FO-111 |
|
Construction of U-Shape RCC Box Drain in missing length of SWD in Mahadeshwara road at ranganathapura. |
456 |
000-09-N-J-N-D-FO-109 |
|
Construction Of RCC box drain along MC layout Marenhalli from upstream of 5th main Road to 7th Main Road of Subbanna Garden |
457 |
000-09-N-J-N-D-FO-108 |
|
Construction of RCC Box drain along M.C Layout Marenahalli from Upstream of 22nd Main Rd to Upstream of 5th Main Rd in Subbanna Garden VVP-4 |
458 |
000-09-N-J-N-D-FO-107 |
|
Remodelling of Secondary drain in V-116 in ward No-21 frm Papanna Garden to Magadi Rd Beside Raheja Towers in Vrishabhavathi Valley Package-1 |
459 |
000-09-N-J-N-D-FO-106 |
|
Remodelling of Secondary drain in V-116 in ward No-21 frm Agrahar Dasarahalli to Magadi Rd in Vrishabhavathi Valley Package-1 |
460 |
000-09-N-J-N-D-FO-105 |
|
Remodelling of Sec. drain in V-116 frm Basaveshwaranagara Main Ro to Magadi Rd in rajajinagara Industrial area VVP-1 |
461 |
000-09-N-J-N-D-FO-104 |
|
Const of RCC Box Drain in Secondary drain (V-207) in V Valley at Shivananda Nagara. |
462 |
000-09-N-J-N-D-FO-103 |
|
Const of RCC Box Drain in Secondary drain (V-207) in V Valley at Canara Bank Layout. |
463 |
000-09-N-J-N-D-FO-102 |
|
Construction of Box drain in Vrishubavathi Valley V-207 at Skyline Apartment in Ward No-35 |
464 |
000-09-N-J-N-D-FO-101A |
|
Construction of RCC Box Drain in V.Valley V-207 at Hanumanthappa Layout in Vrishabhavathi Valley Package-4 |
465 |
000-09-N-J-N-D-FO-101 |
|
Construction of RCC Box drain to V. Valley V-207 at Nanjarasappa layout in ward No.35 in Vrishabhavathi Valley Package-4 |
466 |
000-09-N-J-N-D-FO-100 |
|
Construction of RCC Retaining wall on Left side of Sec. SWD frm1st Cross to 3rd Cross Muneshwaranagara Vrishabhavathi Valley Package-4 |
467 |
000-09-N-J-N-D-FO-098 |
|
Providing Bed protection work and Remodelling of Sec. SWD frm Sangolli Rayanna Road to Kempanna Thota in Vrishabhavathi Valley Package-4 |
468 |
000-09-N-J-N-D-FO-097 |
|
Providing Chin link Fencing in Secondary SWD of Vrishabhavathi Valley frm Arundhati nagara to Nayadanahalli Lake in ward no.39 |
469 |
000-09-N-J-N-D-FO-096 |
|
Remodelling of Secondray SWD in Thigalara Badavne near ITI in Bangalore CIty |
470 |
000-09-N-J-N-D-FO-093 |
|
Construction of RCC Box Drain to V.Valley V-207 at Metro layout in Vrishabhavathi Valley Package-4 |
471 |
000-09-N-J-N-D-FO-091 |
|
Construction Retaining wall on LHS of Secondary SWD frm Sangollirayana Rd to 1st Cross Muneshwara layout Vrishabhavathi Valley Package-4 |
472 |
000-09-N-J-N-D-FO-090 |
|
Constructiono of U-Shape RCC Box drain in missing length of Sec. SWD at 11th cross Kaveripura to Mahadeshwara Rd in Vrishabhavathi Valley P-4 |
473 |
000-09-N-J-N-D-FO-088 |
|
Cont. of RCC Retaining wall on LHS from Ch:5200-5305.0m of K-100 PSWD of KV-1 near Annepaly |
474 |
000-09-N-J-N-D-FO-085 |
|
Constructionof RCC Retaining wall from Magadi Road to Manuvana in Vrishabhavathi Valley(V-116 of package-1 |
475 |
000-09-N-J-N-D-FO-083 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6992m to 7074m |
476 |
000-09-N-J-N-D-FO-082 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6910m to 6992m |
477 |
000-09-N-J-N-D-FO-081 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6828m to 6910m |
478 |
000-09-N-J-N-D-FO-080 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6746m to 6828m |
479 |
000-09-N-J-N-D-FO-079 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6664m to 6746m |
480 |
000-09-N-J-N-D-FO-078 |
|
Const of earth Retaining Structure by providing RCC Cellular Segment for the side of V.Valley from Ch:-6582m to 6664m |
481 |
000-09-N-J-N-D-FO-077 |
|
Const. of earth RE structrures by providing RCC precast segment at site for the side walls of v.valley from CH-6500 to 6582 mtrs. |
482 |
000-09-N-J-N-D-FO-074 |
|
RECONSTRUCTION OF COLLAPSED SSM WALL FROM CH 645 TO 845 AND CONSTRUCTION OF BOX CULVERT AND CH 645 AND CH 725 IN SECONDART DRAIN |
483 |
000-09-N-J-N-D-FO-066 |
|
providing Chail link fencing along Primary and Secondary SWD in Katriguppe minor Valley frm Girinagara in Vrishabhavathi Valley Package-5 |
484 |
000-09-N-J-N-D-Fo-062 |
|
Reconstruction of RCC Deck Slab Bridge at Ch 925 Mtrs and Providing Chainlink Fenceing to Secondary SWD K-113 Near Rajendranagar Slum. |
485 |
000-09-N-J-N-D-FO-060 |
|
ESTIMATE FOR THE WORK OF CONSTRUCTION OF BRIDGE AT 80€™ ROAD KORAMANGALA OVER DRAIN NO. K-113. IN KORAMANGALA VALLEY. |
486 |
000-09-N-J-N-D-FO-052 |
|
Construction of RCC Retaining wall near Guru Krupa Badavane near Wochard Hospital at NGEF layout in Rajarajeshwarinagara Zone |
487 |
000-09-N-J-N-D-FO-041 |
|
Construction of Box drain in V-104 at 620mtr to 680m opp. to Shobha masque and Udutti in Old Guddadahalli Pipeline Road in VVP-1 |
488 |
000-09-N-J-N-D-FO-040 |
|
Reconstruction of side wall at Ch:5350 to 6200 Manjunathnagara Vrishabhavathi Valley Package-1 |
489 |
000-09-N-J-N-D-FO-034 |
|
Providing Chain link fencing along primary and Secondary SWD in Katriguppe Minor Valley KAdirenahalli Sec.drain frm Kadirenahalli Hoskerahalli in VVP-5 |
490 |
000-09-N-J-N-D-FO-033 |
|
Providing chain-link fencing along Primary and Seconday Storm Water Drain in Katriguppe Mainor Valley frm Srinivas Nagara to Girinagara and N.R.Colony to Kamakya layout |
491 |
000-09-N-J-N-D-FO-023 |
|
Supplying and Erecting precast element including dismantling of existing structure and preparation of Bed for bridge at Bannerghatta road in Kormangala Valley |
492 |
000-09-N-J-N-D-FO-021A |
|
Construction of RCC and SSM Retaining wall in LHS of V-100 at Ch:6200 m D/s Besides Padarayanapura in Vrishabhavathi Valley Package-1 |
493 |
000-09-N-J-N-D-FO-021 |
|
Providing Chain Link Fencing on either side of Vrishubavathi main valley from Gali Anjanaya Temple to Mysore Road and RPC Layout Secondary Drain. |
494 |
000-09-N-J-N-D-FO-016 |
|
Providing Chain Link Fencing on either side of V.valley from Agromore factory to pipe line bridge and Batarayanapura secondary drain. |
495 |
000-09-N-J-N-D-FO-013 |
|
Construction of RCC Box drain to Sec drain V-207 at Soft Road near Chandra Layout in Vrishabhavathi Valley Package-4 |
496 |
000-09-N-J-N-D-FO-011 |
|
Providing lead off drain and protective works from Byraveshwaranagara to Chunchagatta Main road in Bommanahalli zone |
497 |
000-09-N-J-N-D-FO-003 |
|
Providing chainlink fencing along primery and secondary SWD in Kathriguppe minor valley from Srinivasanagara to Girinagara from NR colony to Kamakya |
498 |
000-09-N-J-N-D-FO-001D |
|
Remodelling existing Culvert in Sec. SWD Crossing Junction of 1st Main Kaveripura and 1st Cross BDA layout Vrishabhavathi Valley Package-4 |
499 |
000-09-N-J-N-D-FO-001C |
|
Remodelling of Secondary SWD in Chandra layout Near Ganga Public School Vrishabhavathi Valley Package-4 |
500 |
000-09-N-J-N-D-FO-001B |
|
Providing Chain Link fening Valley frm Mareanahalli to Arundhathi Nagara in Vrishabhavathi Valley Package-4 |
501 |
000-09-N-J-N-D-FO-001A |
|
Construction of Bo-207 at Skyline Appartment in ward No-35 Vrishabhavathi Valley Package-4 |
502 |
000-09-N-J-N-D-FO-001 |
|
Remodelling of RCC Box Culvert and Secondary drain in ward No- 19 and 20 Timmaya Road in Vrishabhavathi Valley near Pushanajali Theatre in V.Valley P-1 |
503 |
000-09-N-J-N-D-FM-084 |
|
Construction of PILOT Drain in V-100 frm Ch:6600 to 8000 frm Hosahalli Railway Bridge to Gali Anjaneya Temple in Vrishabhavathi Valley Package-1 |
504 |
000-09-N-J-N-D-DE-001 |
|
Removing silt of valurable locations Primary k-100 Valley and Secondary Valley K-103 104 107 109 k-112 of Kormangala Valley Package-1 |
505 |
000-09-N-J-J-D-Fo-063 |
|
PROVIDING IMPROMENTS TO SECONDARY SWD FROM EJIPURA MAIN ROAD AND 7TH CROSS OF PRIMARY DRAIN K-100 IN KORAMANAGALA VALLEY |
506 |
000-09-N-J-D-FO-097 |
|
Contr of RCC Box drain and SSM retaining wall for SSWD K-107 @ Vinyakanagara 3rd cross KVP-1 ward -70 |
507 |
000-09-N-G-N-D-M1-001 |
|
REMOVING SILT FROM K-112 SECONDARY DRAIN IN K-100 AT THE JUNCTION OF K-100 and K-112 IN KUMBARAGUNDI KVP-1 |
508 |
000-09-N-G-N-D-FO-185 |
|
Construction of RCC Retaining wall in Storm Water Drain from Ch:3475 to Ch:3525 at Raghavendra layout in Hosakerahalli VVP-5 |
509 |
000-09-N-E-N-D-DE-001 |
|
Cleaning of Vrishabavathi Valley accumulated near shanumangala Bridge site. |
510 |
000-09-J-N-O-FO-041 |
|
Construction of box drain in VValley at CH 630M to 680M opp to Mosque road and Govt Urdhu higher primary school in old GUDDADAHALLI pipe line road |
511 |
000-08-N-J-ND-FO-059 |
|
Providing chain link fencing over/adjacent retaining wall of primary SWD K-100 in KVP 1 at LR Slum |
512 |
000-08-N-J-N-D-PE-018 |
|
Providing Chain-link fencing along Primary and Secondary Storm Water Drain in Vrishabhavathi Valley from Telecom Layout to Rajajinagara in Vrishabhavathi Valley P-1 |
513 |
000-08-N-J-N-D-FO-53 |
|
Construction of STP of 250 KLD in Vrishabhavathi Valley V-200 near NGEF layout in Vrishabhavathi Valley Package-4 |
514 |
000-08-N-J-N-D-FO-51 |
|
Construction of STP of 250KLD in Vrishabhavathi Valley V-200 Nagarabhavi 2nd Stage 12th Block(Behind 6th Main) Vrishabhavathi Valley Package-4 |
515 |
000-08-N-J-N-D-FO-50 |
|
Const of Civil Works including Sewage Treatment Plant Electrical works and its accessories in V. Main Valley in Nagarabhavi II Stage in Bangalore City. |
516 |
000-08-N-J-N-D-FO-49 |
|
Const of Civil Works including Sewage Treatment Plant Electrical works and its accessories in V. Main Valley in Nagarabhavi 9th Block in Bangalore City. |
517 |
000-08-N-J-N-D-FO-129 |
|
Constriction of R.C.C SWD from Hosur Blore mai road upto primary drain K-200 at madivala in Kormangala Valley of Package-3 |
518 |
000-08-N-J-N-D-FO-111A |
|
Construction of RCC Box drain along along M.C.layout Marenahalli from Upstream of 21st Main Road to 23rd Main Rd of Subbanna Garden in V.V.P-4 |
519 |
000-08-N-J-N-D-FO-096 |
|
Remodelling of Secondary Storm Water Drain in Thigalara Badavane Near ITI layout in Ward No-39in Vrishabhavathi Valley Package-4 |
520 |
000-08-N-J-N-D-FO-062 |
|
Construction of RCC Box drain in V-112 at Ch:930m to 1000m of Opp. Varalakshmi Nursing Home in Vrishabhavathi Valley Package-1 |
521 |
000-08-N-J-N-D-FO-059 |
|
Providing Chain link fencing over/adjacent Retaining wall of Primary drain K-100 in Koramangala Valley Package-3 |
522 |
000-08-N-J-N-D-FO-058 |
|
Providing Chainlink fencing over/adjacent retaining wall of primary SWD-K-200 in kormangala valley Package-III |
523 |
000-08-N-J-N-D-FO-057 |
|
Providing Chainlink fencing over adjacent to Retaining walls of Secondary SWD of K-103 K-108 and K-111 in Kormangala Valley Package-1 |
524 |
000-08-N-J-N-D-FO-055 |
|
Construction of STP of 250KLD in Vrishabhavathi Valley V-200 Jnanabharathi near Water Treatment Plant in Vrishabhavathi Valley Package-4 |
525 |
000-08-N-J-N-D-FO-054 |
|
Construction of STP 250KLD V.Valley V-200 in Jnanabharathi Teachers layout in Vrishabhavathi Valley Package-4 |
526 |
000-08-N-J-N-D-FO-052 |
|
Construction of STP of 250KLD in V.Valley V-200 near Sport Authority of India in Vrishabhavathi Valley Package-4 |
527 |
000-08-N-J-N-D-FO-048 |
|
Construction of STP of 250KLD in Vrishabhavathi Valley V-200 Near Kalyan nagara in Vrishabhavathi Valley Package-4 |
528 |
000-08-N-J-N-D-FO-047 |
|
Construction of all Civil works erecting commissing of STP of 250-KLD capacity including all elecrical works by side of V.Valley V-200 near Krishanandangr in VVP-4 |
529 |
000-08-N-J-N-D-FO-046 |
|
Construction of STP of 250KLD in Vrishabhavathi Valley V-200 Near Malagala(Srinivasa nagara0) in Vrishabhavathi Valley Package-4 |
530 |
000-08-N-J-N-D-FO-045 |
|
Construction of STP of 250KLD in Vrishabhavathi Valley V-200 near Malagala in Vrishabhavathi Valley Package-4 |
531 |
000-08-N-J-N-D-FO-043 |
|
Reconstruction of Delapidated Bridge at Maruthi nagar main road at SWD-K-200 Kormangala vally package 3 |
532 |
000-08-N-J-N-D-FO-039 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Golf Club of SAI upto Mysore road. |
533 |
000-08-N-J-N-D-FO-038 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Primisies of Sport Authority of India. |
534 |
000-08-N-J-N-D-FO-037 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from JnanaBharthi to Shooting Complex(SAI). |
535 |
000-08-N-J-N-D-FO-036 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from JnanaBharathi (Ph.D.Hostel) to Gandhi bhavan road. |
536 |
000-08-N-J-N-D-FO-035 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Nagarabhavi 2nd Stage Vinayaka Nagara to Teachers Layout. |
537 |
000-08-N-J-N-D-FO-034 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Nagarabhavi 2nd Stage Hoysala nagara to NGEF Layout. |
538 |
000-08-N-J-N-D-FO-033 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Nagarabhavi 2nd Stage to Chalukya nagara. |
539 |
000-08-N-J-N-D-FO-032 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Mudalapalya to Adarshnagara. |
540 |
000-08-N-J-N-D-FO-031 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Kalyan Nagara to Shakthi Garden. |
541 |
000-08-N-J-N-D-FO-030 |
|
Remodelling of RCC Box Culvert at "A" MAin Rd in Bhuvaneshwarinagara Mini Bridge at Ch:55560m along Primary Drain V-100 in Vrishabhavathi Valley Package-1 |
542 |
000-08-N-J-N-D-FO-029 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Magadi road to Leprosy V.T.Unit. |
543 |
000-08-N-J-N-D-FO-027 |
|
Remodeling of SWD from low level waste veir of Madiwala lake upto culvertin NH7 near Silk Board |
544 |
000-08-N-J-N-D-FO-026 |
|
Construction of RCC retaining wall from Ch: 6984mtrs to 7084mtrs Behind Ravi Theatre Ejipura in Drain No K-100 Koramangala Valley Package-2. |
545 |
000-08-N-J-N-D-FO-012 |
|
Construction of RCC Retaining wall in SWD From Muddayanapalya Tank to Ullal Main Road(Mallathalli Sy.N-82)in RR Nagara New Zone |
546 |
000-08-N-J-N-D-FO-010 |
|
Remodeling of SWD from 24th Main To Vishveshraraiah Circle(SMS layout) in Bommanahalli Zone. |
547 |
000-08-N-J-N-D-FO-009 |
|
Remodelling of Secondary SWD K-209 from Ranka colony to sanjay shah appartment in koramangala vally pacakage-3 |
548 |
000-08-N-J-N-D-FO-004 |
|
Remodeling of SWD from Konanakuntte Tank Waste Weir To Omshivashakthinagara in Bommanahalli Zone |
549 |
000-08-N-J-N-D-FO-001 |
|
Manufacturing and Supply of RCC Box Precast Segment for Bridge Across Sec. SWD K-209 in Koramangala Valley Package-3 |
550 |
000-08-N-J-N-D-FM-029 |
|
Construction of RCC Box Culvert at Telecom Layout Vijayanagara Ch:6425 of V-100 Primary drain in Vrishabhavathi Valley Package-1 |
551 |
000-08-N-J-N-D-FM-028 |
|
Construcion of RCC Box culvert at Chaluvappa in V-100 at Ch:9575 in Vrishabhavathi Valley Package-1 |
552 |
000-08-N-J-N-D-FM-020 |
|
Construction of RCC Box Culvert at GIS English School at new Guddadahalli V-100 in Vrishabhavathi Valley Package-1 |
553 |
000-08-N-J-N-D-FM-019 |
|
Construction of Box Culvert at 4th Main Road Bhuvaneshwari Nagrara in Vrishabhavathi Valley Package-1 |
554 |
000-08-N-J-N-D-FM-018 |
|
Construction of RCC Box Culvert at Chaluvappa Garden Ch:5867m of V-100 Primary drain in Vrishabhavathi Valley Package-1 |
555 |
000-08-N-J-N-D-FM-017 |
|
Construction of RCC Box Culvert at 1st "C" main Road at Bhuvaneshwari Nagara in Vrishabhavathi Valley P-1 |
556 |
000-08-N-J-N-D-FM-013 |
|
Construction of Box drain along the Mysore Road from Torino Factory infront of R.R.Nagara to Vrishabhavathi Valley Near Jnana Bharathi |
557 |
000-08-N-J-N-D-FF-005 |
|
Providing Chain Link fencing along Primary and Secondary storm water drain in Vrishubavathi Valley from Mallathalli Road to Teachers Layout |
558 |
000-08-N-J-N-D-FE-022 |
|
Providing Chain Link fencing for Secondary storm water drain in the permises of National Law School of India. |
559 |
000-08-N-J-N-D-FE-018 |
|
Providing Chain link fencing along Primary and Secondary Storm Water Drain in Vrishavalley from Telecom Layout to Bapujinagara |
560 |
000-08-N-J-N-D-Fe-015 |
|
REMODELLING OF SECONDRY SWD K209 FROM SHANJAYSHA APARTMENTS TO MADIWALA LAKE |
561 |
000-08-N-J-N-D-FE-012 Dt:29/11/2007 |
|
chain link fencing near Rajendranagar slum along drain no. 113 in Koramangala valley Package-2 from chainage 900 mts. to 1225 mts. |
562 |
000-08-N-J-N-D-FE-007 |
|
PROVIDING AND FIXING OF CHAINLINK FENCING IN PRIMARY STORM WATER DRAIN IN HVP-II FROM YESHWANTH PUR TO CHIRANJEEVI LAYOUT |
563 |
000-08-N-J-N-D-FE-004 |
|
Providing Chain Link fencing along Primary and Secondary storm water drain in Vrishubavathi Valley from Mudalapalya to kalaya Nagar Bridge. |
564 |
000-08-N-J-N-D-FE-003 |
|
Providing Chain Link fencing along Primary and Secondary storm water drain in Vrishubavathi Valley from Jnana Bharathi Area to Mysore Road. |
565 |
000-08-N-J-N-D-F0-056 |
|
Providing and fixing chain link fencing Over /adjacent retaining wall of secoundry SWD-K-206 K207 and K209 in kormagala valley package--III |
566 |
000-08-N-J-N-D-F-F-002 |
|
Chain Link fencing on either side if Vrishubavathi Valley in primary and secondary drain from Magadi road to pancahseela Nagar |
567 |
000-08-N-J-N-D-030 |
|
Providing and Laying 600mm dia S and S type RCC pipe line along Vrishubavathi Valley from Malagala to Panchasheela Nagara. |
568 |
000-07-N-Z-I-D-FO-018 |
|
Construction of SWD including RCC/SSM Retaining wall CD Works and other allied Works from Muddayana Palya Kere to Ullal Main Road |
569 |
000-07-N-Z-I-D-FO-016 |
|
Construction of SWD including RCC/SSM Retaining walls CD works and other allied works from Ullal Main road to Subhashnagar Tank in RR Zone-4 |
570 |
000-07-N-Z-I-D-FO-015 |
|
Construction of SSM/Rcc Wall Culverts/Bridges in SWD from Sunkadakatte Magadi road To Muddaiahna Palya Tank In RR Nagara Zone |
571 |
000-04-N-P-N-G-FO-001/2 |
|
Shifting / rea laying and jointing of HT/LT/UG cables and other utlities croosing SWD @ Victoria road Palm groove road |
572 |
000-04-N-P-N-G-FO-001/07 |
|
Shifting realing and jointing of 450 300 100mm dia water supply line crossing SWD KV |
573 |
000-04-N-P-N-G-FO-001 |
|
Shifting relaying and jointing of 450mm 300mm and 100mmdia water supply line crossing SWD at Victoria Road near Hyderabad Biryani Hotel. |
574 |
000-N-Z-I-D-FO-017 |
|
Construction of SSM/Rcc wallculverts/Bridges in SWD from Malathalli Circle to Ullal Main road in RR Nagara zone |
575 |
000-N-Z-I-D-FO-017 |
|
Construction of SSM/Rcc wall culverts/Bridges in SWD from Malathalli Circle to Ullal Main road in RR Nagara zone |
576 |
000-10-N-J-N-D-FO-083 |
|
Construction of SSW in K111adjacent to RV Road near petrol Bunk(Kanakana Pallaya)of Kormangala Valley Package 1 |
577 |
|
|
Remodelling of SWD K-209 from Sanjaya Sha Apartment to Madival Tank in Koramangala Valley Package-3 |
578 |
201-09-N-J-N-D-FO-006 |
|
Remodelling of swd from Begur tank waste weir to NH7 of Bangalore Hoosur Road from Ch:2000 to 2500m in Bommanahalli zone |
579 |
|
|
Remodelling of Secondary Storm Water Drain K-209 from Ranka Colony to Sanjayashah Apartment in Koramangala Valley P-3 |
580 |
|
|
Providing chainlink fencing on either side of V Valley in Primary and secondary drain from Biscute factory to Treatment Plant. |
581 |
|
|
Providing chain link fencing on either side of Vrishabavathi valley in primary and secondary drain from Treatment plant to Rajarajeshwari Nagar |
582 |
000-11-N-P-N-D-FO-001 |
|
Construction of RCC U shape SWD( BH578) from Chikkanahalli - Sreeramanagara Joins SWd from Begur tank Hongasandra BZ ( Ch:0.0-600m) |