CE SWM Head Office Projects Details Total Projects : 64 |
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
205-08-N-G-F-V-MN-002 |
|
EARTH WORK EXCAVATION HDPE LINER CLAY MATERIALS AND MAINTENANCE WORKS FOR SCIENTIFIC LAND FILL IN BBMP LAND SY NO 143 OF SUBBARAYANAPALYA R R NAGAR BANGALORE. |
2 |
204-09-N-G-F-B-FO-004 |
|
Hydraulic Excavator of 1 cum bucket for compressing loading and unloading MSW in Transfer Point in BBMP land in Sy.No.142 B.Narayanpura. |
3 |
204-09-N-G-F-B-FO-003 |
|
Construction of Barricading and Size Stone Masonry for MSW transfer point in BBMP land in Sy.No.142 B.Narayanpura. |
4 |
204-09-N-G-F-B-FO-002 |
|
Construction of Water Bound Macadam Road for transportation of Municipal Solid Waste in transfer point in BBMP land in Sy.No.142 B.Narayanpura. |
5 |
204-09-M-N-F-0-MN-002 |
|
EARTH WORK EXCAVATION HDPE LINER CLAY MATERIALS AND MAINTENANCE SCIENTIFIC LAND FILL IN SOUTH EASTERN PART SY NO 155 OF MANDUR |
6 |
204-09-M-N-F-0-MN-001 |
|
EARTH WORK EXCAVATION HDPE LINER CLAY MATERIALS AND MAINTENANCE WORKS FOR SCIENTIFIC LAND FILL IN B.B.M.P.LAND IN S BINGIPURA BANGALORE. (Shifted to Mandur) |
7 |
204-09-M-G-F-O-MI-006 |
|
SEGREGATION AND RECLYING OF MSW THOUGH DECENTRALLISED PROCEESING UNITS in Sy no 155 Mandur Bangalore |
8 |
204-09-M-G-F-O-MI-005 |
|
SEGREGATION AND RECLYING OF MSW THOUGH DECENTRALLISED PROCEESING UNITS in Sy no 142 B.Narayanapura block BANGALORE. |
9 |
204-09-M-G-F-O-MI-003 |
|
Disposal of Municipal Solid Waste from Transfer Point to designated places by using 10 wheel truck Tipper in BBMP land in RR Nagar Bangalore. |
10 |
204-09-M-G-F-O-MI-002 |
|
Disposal of M SW from Transfer Point to designated places by using 10 wheel truck Tipper in BBMP land in Sy.No.142 B.Narayanpura Bangalore. Mandur |
11 |
204-09-M-G-F-O-MI-001 |
|
Disposal of M SW from Transfer Point to designated places by using 10 wheel truck Tipper in BBMP land in Sy.No.142 B.Narayanpura Bangalore. Mavallipura |
12 |
056-09-M-N-F-O-MN-001 |
|
EARTH WORK EXCAVATION HDPE LINER CLAY MATERIALS AND MAINTENANCE WORKS FOR SCIENTIFIC LAND FILL IN C A SITE BANASHANKARI BANGALORE.(sHIFTED TO SEEGEEHALLI) |
13 |
000-11-N-G-E-U-BD-003 |
|
Drilling Of Borewell and providing rasining main at Ramagonddanahalli |
14 |
000-11-N-G-E-U-bd-002 |
|
Drilling of Borewell and Providing Submerrsible Raising main at Subeddarpalya |
15 |
000-11-N-G-E-U-006 |
|
Driiling Of Borewell and Providing Raising main at Mavallipura Viilage |
16 |
000-11-N-G-E-U-005 |
|
Drilling of Borewell and and providing raising main at Mavallipura Ashraya layout |
17 |
000-11-N-G-E-U-004 |
|
Drilling Of Borewell and providing raising main at Doddabelakere |
18 |
000-11-N-G-E-O-BD-001 |
|
Drilling of Borewell and providing Sunmerssible raising main at Muddepalya |
19 |
000-10-N-P-L-O-MI-002 |
|
Construction of Road Work Supply and Fixing of B.S.Slab Mangalore Tiles and Water storage Tank in Slaughter House at Tannery Road. |
20 |
000-10-N-P-L-O-MI-001. |
|
Supplying and fixing of collapsible steel shutter gate M.S steel gate wood work and R.C.C drain towards booty stall of small animal area |
21 |
000-10-N-P-L-O-FO-003 |
|
Construction of RCC drain and Supply and fixing of Mangalore tiles water line and compound wall in slaughter house at Tannery road. |
22 |
000-10-N-P-L-D-FO-002. |
|
Construction of R.C.C drain and covering slab in b/w small animal and large animal area at tannery road slaughter house |
23 |
000-10-N-P-L-D-FO-001. |
|
Construction Of R.C.C Drain And Covering Slab At Front Side And Back Side Of Tannery Road Slaughter House |
24 |
000-10-N-P-L-D-BS-001 |
|
Providing and fixing of new BS Slab at entrance of Slaughter House Phase 1 and Patch up work inside and out side of slaughter house at tannery road at Slaughter house. |
25 |
000-10-N-P-F-R-FO-003 |
|
Construction of RCC Drain from Hosur gate to KCDC Plant |
26 |
000-10-N-P-F-R-FO-001 |
|
Construction of Road work from hospalya to bandepalya road. |
27 |
000-10-N-P-F-R-F0-002 |
|
Construction of Road work from Hosur Main gate to Kudulu Panchayat Chainage 0 Mt to 1000 Mt |
28 |
000-10-N-P-F-R-AS-002 |
|
Construction of Internal peripheral road in Segehalli Bangalore. |
29 |
000-10-N-P-F-R-AS-001 |
|
Construction of peripheral road in Northern Part of Sy.No.155 of Mandur Biderahalli hobli Bangalore. |
30 |
000-10-N-P-F-O-MI-003. |
|
Disposal of MSW through 10 wheel trucks from identified transfer points landfill to designated process plants landfill of BBMP area on point to point basis |
31 |
000-10-N-P-F-O-MI-002. |
|
Providing and supplying Installation testing and commissioning of fire hydrant system for KCDC garbage yard |
32 |
000-10-N-P-F-O-FO-001 |
|
CONSTRUCTION OF R.C.C SUMP AT K.C.D.C GARBAGE YARD |
33 |
000-10-N-P-F-C-FO-001 |
|
Construction of culvert and Chainlink fencing to hospalya road |
34 |
000-10-N-P-F-B-FO-003 |
|
Construction of Compound wall at S.Bingipura MSW quarry pit |
35 |
000-10-N-P-F-B-FO-002 |
|
Construction of Compound wall at Devarachikkanhalli |
36 |
000-10-N-P-F-B-FO-001 |
|
Construction of compound wall to K.C.D.C garbage yard near SOMASUNDRA tank in B.B.M.P.B€™lre. |
37 |
000-10-N-P-F-B-F0-004 |
|
Construction of Compound wall at Sy No 43 Gudddadahalli Bangalore North |
38 |
000-10-N-G-E-U-BD-007 |
|
Drilling of Borewell and Providing raising main at Lingarajapuram |
39 |
000-10-M-N-G-R-AS-003 |
|
Providing and Asphalting to Ambabhavani Temple road from 1st Phase Chikkabettahalli Cross to Arch Raod at Ambabhavani Circle |
40 |
000-10-M-N-G-R-AS-002 |
|
Strengthing of Road and asphalting of road from Mavallipura village to Cross road at Waste Dumping Yard |
41 |
000-09-N-G-L-B-FO-001 |
|
Construction of Compound wall alround Modern Abattoir at Iggalur Village Anekal Taluk |
42 |
000-09-N-G-F-FO -005 |
|
Construction of RCC plat form for Municipal Solid Waste Transfer Point in BBMP land in Kormangala Bangalore. |
43 |
000-09-N-G-F-FO -004 |
|
Construction of RCC ramp for Municipal Solid Waste Transfer Point in BBMP land in Kormangala Bangalore |
44 |
000-09-N-G-F-D-FO-001 |
|
Construction of side drain and construction of culverts from Hosur gate to KCDC plant |
45 |
000-09-M-N-F-D-F0-001 |
|
Construction of side drain from nursery to Bandepalya quarry pit CH 0.00 Mts to 700 Mts |
46 |
000-09-M-G-F-O-MI-003 |
|
Construction of RCC ramp for Municipal Solid Waste Transfer Point in BBMP land in Vinayaka Nagar Bangalore |
47 |
000-09-M-G-F-O-MI-001. |
|
Construction of RCC plat form for Municipal Solid Waste transfer point in BBMP land in Vinayaka Nagar Bangalore |
48 |
000-09-M-G-F-O-MI-001 |
|
SEGREGATION AND RECLYING OF MSW THOUGH DECENTRALLISED PROCEESING UNITS in CA Site no 05 Banashankari 5TH STAGE 6th block BANGALORE. |
49 |
000-08-N-N-F-C-DS-001 |
|
construction of precast slabs from KCDC Nursery to Bandepalya |
50 |
000-08-M-N-F-V-FE-001 |
|
CONSTRUCTION OF COMPOUND CHAIN LINK FENCING TO ADUGODI IN BBMP. |
51 |
000-08-M-N-F-R-MN-003 |
|
Dozing and leveling of construction of debris at Devarchikanhalli |
52 |
000-08-M-N-F-R-MN-002 |
|
Disposal of Solid Waste through operator Integrated Municipal Solid Waste processing Engineered landfill facility |
53 |
000-08-M-N-F-R-MI-002 |
|
Hiring of JCB for dozing the construction debris in Hennur Bande |
54 |
000-08-M-N-F-O-RH-001 |
|
Construction Of RWH pond Balancining Reseviour Connecting pipeline injection borewells Darins with filters at Sy no 155 Mandur Bidderahalli Hobli Bangalore |
55 |
000-08-M-N-F-O-R-001 |
|
Maintenance of Existing scientific sanitary landfill of Municipal Solid Waste in BBMP land sy.no.155 Mandur (Northern Part) bangalore |
56 |
000-08-M-N-F-O-MN-006 |
|
Providing Security services to Kannahalli |
57 |
000-08-M-N-F-O-MN-003 |
|
Vibuthipura Security service estimate |
58 |
000-08-M-N-F-O-MN-002 |
|
Providing Security Services to Hennur Banasavadi |
59 |
000-08-M-N-F-O-MN-001 |
|
Providing Security Services to B Narayanapua Quarry pit |
60 |
000-08-M-N-F-0-MN-003 |
|
Providing Security Services to Giddenahalli |
61 |
000-08-M-G-L-B-SR-001 |
|
"Maintenance ETP at Tannery road Operation and maintenance of existing ETP for a period of one year in slaughter house at Tannery road." |
62 |
00-10M-N-G-R-AS-001 |
|
Strengthening of Road and asaphalting from Mavaliipura Road Cross to Wsate Dumping Yard |
63 |
000-08-N-N-F-O-RH-001 |
|
Construction of RWH pond Balancing resrvoir connecting pipeline injection bore wells drains with filters at sy.no.155 Mandur Bangalore |
64 |
000-08-N-N-F-O-RH-001 |
|
Construction of RWH pond Balancing reservoir connecting pipeline Injection bore wells Drains with filters at Sy.No.155 of Mandur Bangalore |