Giri Nagar Ward (Wardno:162) Project Details Total Projects : 341
|
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
7A) 054-09-M-S-E-D-IM-012 7B)054-09-N-SCE(S)ADMN/A |
|
7A) IMPROVEMENS TO DRAIN CULVERTS COVERING SLAB TO IYYAPPA SWAMY TEMPLE ROAD CT BED TO KATHRIGUPPE MAIN ROAD |
2 |
7A) 054-09-M-S-E-D-IM-012 7B)054-09-N- |
|
7A) IMPROVEMENS TO DRAIN CULVERTS COVERING SLAB TO IYYAPPA SWAMY TEMPLE ROAD CT BED TO KATHRIGUPPE MAIN ROAD |
3 |
123-N-G-E-R-IM-005 |
|
Improvements to Roads Road side drains & Providing Covering slabs at Khadi Commission & Cauvery Layout Surroundings Roads (Balance Portion) Srinivasanagar in ward No-54. |
4 |
123-N-G-E-R-IM-004 |
|
Improvements to Roads Road side drains & Providing Covering slabs at S.B.M Colony and Srinivasanagar BSK 3rd Stage in ward No-54. |
5 |
123-M-G-E-D-IM-017 |
|
Improvements to drain at Neharu Road & Sourrodings Roads in Girinagara in ward no-54. |
6 |
123-M-G-E-D-IM-009 |
|
Improvements to drain at Kempegowda Layout & Srinivasanagara Roads in ward no-54. |
7 |
123-10M-G-E-R-DC-001 |
|
DEPOT COLLECTION FOR THE YEAR 2009-10 IN WARD NO-54. |
8 |
123-10-N-G-T-S-LG-005 |
|
Providing 250 W S.V. Fittings in Important area/Junctions and automatic control switches along with connected accessories |
9 |
123-10-N-G-T-S-LG-003 |
|
Providing Mini High Mast Lighting System 80 feet Road and PES College Main Road Junction in Ward No. 123 (Old Ward No. 5354) |
10 |
123-10-N-G-T-S-LG-002 |
|
Providing Mini High Mast Lighting System at Vidya petta Main Road and Kamakya Main Road Junction in Ward No. 123 (Old Ward No. 5354) |
11 |
123-10-N-G-E-R-PC-001 |
|
Improvements to Roads Road side drains & Providing Covering slabs at Girinagara Park Surrouning Road BSK 3rd Stage BDA Avalahalli in ward No-54. |
12 |
123-10-N-G-E-R-IM-002 |
|
Improvements to Roads Road side drains & Providing Covering slabs at Shakthi Ganesh Temple Surrouning Roads BSK 3rd Stage Hosakerehalli in ward No-54. |
13 |
123-10-N-G-E-R-IM-001 |
|
Improvements to Vidyapeeeta road and surroundings road footpath |
14 |
123-10-M-G-T-P-LG-001 |
|
Providing Pathway Sound System To Srikanteshwara park Chennammanakere Achukattu Srinivasa Nagara ward No. 123 (Old W-54) |
15 |
123-10-M-G-E-R-MN-001 |
|
For Maintainance to roads a) for pot holes and road cuting filling in Old no-54. |
16 |
123-10-M-G-E-R-AS-004 |
|
Improvements to drain at Manjunatha swamy temple road & sourroding roads bank Colony BSK 3rd Stage in ward-54 |
17 |
123-10-M-G-E-R-AS-003 |
|
Providing Asphaltin to Bad roads of Vidyanagara area in ward No.54 |
18 |
123-10-M-G-E-R-AS-002 |
|
Providing AsphaltinG to Bad roads of Hosakerehalli area B.S.K 3rd Stage in ward No.54 |
19 |
123-10-M-G-E-D-IM-024 |
|
IMPROVEMENTS TO SECONDARY DRAIN AT MANJUNATHA NAGARA AREA IN WARD NO-54. |
20 |
123-10-M-G-E-D-IM-023 |
|
Improvements to drain at Poorna Pragna Layout B.S.K 3rd Stage in ward no-54. |
21 |
123-10-M-G-E-D-IM-022 |
|
Improvements to drain at 6th Block near B.T.S Depo B.S.K 3dr Stage 3rd Phase in ward no-54. |
22 |
123-10-M-G-E-D-IM-021 |
|
Improvements to drain at 6th Block Behind Big Bazar B.S.K 3rd Stage 3rd Phase in ward no-54. |
23 |
123-10-M-G-E-D-IM-020 |
|
IMPROVEMENTS TO SECONDARY DRAINS AT 80 FEET ROAD PARK IN SIDE BSK 3RD STAGE 3RD PHASE IN WARD NO-54. |
24 |
123-10-M-G-E-D-IM-019 |
|
Improvements to drain at 2nd Block BSK 3rd Stage 3rd Phase in ward no-54. |
25 |
123-10-M-G-E-D-IM-018 |
|
Improvements to drains at 1st Block BSK 3rd Stage 3rd Phase in ward No-54. |
26 |
123-10-M-G-E-D-IM-013. |
|
IMPROVEMENTS TO SECONDARY DRAINS IN BANK COLONY IN WARD NO-54. |
27 |
123-10-M-G-E-D-IM-012. |
|
Improvements to secondary drains at Hosakerehalli opposite to shakthi Ganapathi temple in ward No-54. |
28 |
123-10-M-G-E-D-IM-011 |
|
Improvements to drain at Vivekanandanagara (East side of Kathriguppe Road) Roads in ward no-54. |
29 |
123-10-M-G-E-D-IM-010 |
|
IMPROVEMENTS TO DRAIN AT KAVERINAGARA LAYOUT ROADS IN WARD NO.54 |
30 |
123-10-M-G-E-D-IM-008 |
|
Improvements to drain at Shanthi Niketana School sourrodings Roads in Girinagara in ward no-54. |
31 |
123-10-M-G-E-D-IM-007. |
|
IMPROVEMENTS TO ROADS ROAD SIDE DRAINS AN PROVIDING COVERING SLABS AT BALAJI LAYOUT AND GURURAJA LAYOUT VIDYAPEETA IN WARD -54. |
32 |
123-10-M-G-E-D-IM-007 |
|
Improvements to drain at Vidyanagara Layout Hosakerehalli Roads BSK 3rd Stage in ward no-54. |
33 |
123-10-M-G-E-D-IM-006. |
|
IMPROVEMENETS TO ROADS SIDE DRAINS AND RROVIDING COVERING SLABS AT KATHRIGUPPE SURROUDINGS ROADS BSK 3RD STAGE IN WARD NO-54. |
34 |
123-10-M-G-E-D-IM-006 |
|
Improvements to drain at Hosakerehalli near Adon school sourrodings Roads BSK 3rd Stage in ward no-54. |
35 |
123-10-M-G-E-D-IM-003 |
|
Improvements to drain at Chennammanakere Achukattuofficesourrodings Roads in ward -54 |
36 |
123-10-M-G-E-D-IM--022 |
|
Improvements to drain at 6th Block near B.T.S Depo B.S.K 3dr Stage 3rd Phase in ward no-54. |
37 |
123-10-M-G-E-D-IM--020 |
|
Improvements to drain at 4th Block B.S.K 3rd Stage 3rd Phase in ward no-54. |
38 |
123-10-M-G-E-D-IM--011 |
|
Improvements to drain at Siddivinayaka Layout BSK 3rd Stage in ward no-54. |
39 |
123-10-M-G-E-D-IM--008 |
|
Improvements to Roads Road side drains & Providing Covering slabs at Vinayaka Layout Srinivasanagar in ward No-54. |
40 |
123-10-M-G-E-D-IM--005 |
|
Improvements to drain at 14th Main Road to 17th Main Road & Cross Roads Bank Colony BSK 3rd Stage in ward no-54. |
41 |
123-10-M-G-E-D-IM--003 |
|
Improvements to drain at Byrappa Garden BSK 3rd Stage inward no-54. |
42 |
116-M-G-E-R-MN-001 |
|
MAINTENANCE TO WARD ROADS A) FOR POT HOLES AND ROAD CUTTING FILLING WARD-54 |
43 |
116-10-N-G-T-S-LG-005 |
|
Providing 250 W S.V. Fittings in Important area/Junctions and automatic control switches along with connected accessories in Ward No. 116 (Old Ward No. 5354) |
44 |
116-10-N-G-T-S-LG-004 |
|
Providing Mini High Mast Lighting System at Girinagara double road and Girinagara Main Road Junction in Ward No. 116 (Old Ward No. 5354) |
45 |
116-10-N-G-T-S-LG-001 |
|
Providing Mini High Mast Lighting System at 80 feet Road and Manjunatha Temple Road Junction in ward No. 116 (Old Ward No. 53 54) |
46 |
116-10-N-G-E-R-IM-003 |
|
Improvements to Vidyapeeta road and surroundings road footpath in ward No. 54 |
47 |
116-10-M-G-T-P-LG-004 |
|
Providing Pathway sound System to Park AT BSK 2nd Stage 80 feet road Srinivasa Nagara Ward No. 116 (Old W-54) |
48 |
116-10-M-G-T-P-LG-001 |
|
Providing Pathway sound System to Pushpanjali Park Girinagara area Srinivasa Ward No. 116 (Old W-54) |
49 |
116-10-M-G-E-R-MN-002 |
|
MAINTENANCE TO WARD THROUGH ENGAGED LABOURS IN WARD NO-54 NEW WARD NO-116. |
50 |
116-10-M-G-E-R-DC-001 |
|
DEPOT CPLLECTION FOR THE YEAR 2009-10 WARD NO-54. |
51 |
116-10-M-G-E-D-IM-002 |
|
Improvements to drain at Chennammanakere achukattu in ward No. 54 |
52 |
116-10-M-G-E-D-IM-001 |
|
Improvements to drain at Chennammanakere achukattu in ward No. 54 |
53 |
054-09-N-S-T-S-LG-002 / 003 / 004 / 005 |
|
Providing Mini High Mast Lighting System at ORR Hosakerehally Main Road Junction (NCERT) and Providing Mini High Mast Lighting System at Outer Ring Road |
54 |
054-09-N-G-T-S-IN-002 |
|
Providing Mini High Mast Lighting System at Hosakere Halli Main Road & Girinagara Main Road Junction (Near Srinagara Club) In Ward No. 54 |
55 |
054-09-N-G-T-S-IN-001 |
|
Providing Double End Brocket along with 250 W S.V fittings to Neharu road Giri nagara 2nd Phase W.No.54 |
56 |
054-09-N-E-E-R-AS-001 |
|
Providing asphalting to KEB layout Balaji layout Vivekanandha nagara & Surroundings roads in Ward No.54 |
57 |
054-09-M-S-E-D-IM-013 |
|
Imrprovements to drain culverts flagging course and covering slab to Ramamandhira road from 9th B main srinivasanagara to Kathriguppe main in ward No-*54. |
58 |
054-09-M-S-E-D-IM-006 |
|
IMPROVEMENTS TO 3RD MAIN ROAD AND 7TH CROSS ROAD OF 4TH MAIN ROAD OF SRINIVASANAGARA IN WARD NO-54. |
59 |
054-09-M-G-T-E-RE-001 |
|
Repairs to Electrical Installation in Avalahalli BDA Park Giri Nagara Srinivasa Nagara W.No. 54 |
60 |
054-09-M-G-E-B-MN-001 |
|
IMPROVEMENTS TO TOILETS IN WARD NO-54. |
61 |
054-09-M-G-E-B-MI-001 |
|
DEMOLITION OF UN AUTHORIZED CONSTRUCTION IN WARD NO-54. |
62 |
054-08-M-G-T-P-EG-008 |
|
Repairs to Electrical Panel Board at Avalahalli BDA Park Girinagara Srinivasa Nagara in ward No. 54 |
63 |
054-08-M-G-T-P-EG-003 |
|
Repairs to Electrical Installation in Pushphanjali Park Girinagara Srinivasanagara Ward No. 54 |
64 |
054-08-M-G-T-B-EM-001 |
|
Providing Motor Pump set to Anganavadi Center at Shankaranag Circle Srinivasa nagara in Ward No. 54 |
65 |
054-07-M-G-T-B-EF-002 |
|
Providing Electrification to ARO Offices at C.T. Community Hall C.T. Bed in Ward No. 54 |
66 |
000-N-P-P-R-IM-047 |
|
PROVIDING ASPHALTING TO BAD ROADS OF BSK 3RD STAGE 3RD PHASE OF 4TH AND 6TH BLOCK IN WARD NO-54. |
67 |
000-10-N-P-PR-IM-048 |
|
Providing asphalting bad roads of Banashanakari 3rd Stage chennamanakere achukattu Layout. |
68 |
000-10-N-P-PR-IM-045 |
|
Providing asphalting bad roads of Banashankari 3rd Stage 3rd Phase of 1st & 3rd Block. |
69 |
000-10-N-P-PR-IM-044 |
|
Providing asphalting bad roads of Girinagara from 19th Main to 14th Cross. (Venkateshwara temple road) |
70 |
000-10-N-P-PR-IM-039 |
|
Improvements to road and drainage at Khadhi commission Layout. |
71 |
000-10-N-P-P-R-IM041 |
|
Improvements to road and drainage at Kathriguppe village |
72 |
000-10-N-P-P-R-IM-050 |
|
Providing asphalting bad roads of Kempegowda Layout and Ram Rao Layout |
73 |
000-10-N-P-P-R-IM-043 |
|
Improvements to road and drainage at I.T.I Layout & Balaji Layout. |
74 |
000-10-N-P-P-R-IM-042 |
|
Improvements to road and drainage at Chennammanakere achukattu Layout. |
75 |
000-10-N-P-P-R-IM-040 |
|
Improvements to road and drainage at Vinayaka layout |
76 |
000-10-N-P-P-R-IM-035 |
|
Improvements to road and drainage at Girinagara from 10th Main to 14th Cross. |
77 |
000-10-N-P--P-R-IM-051 |
|
PROVIDING ASPHALTING TO BAD ROADS OF ITI LAYOUT AND VIVEKANANDA NAGARA IN WARD NO-54. |
78 |
000-10-N-P--P-R-IM-040 |
|
IMPROVEMENTS TO SECONDARY DRAINS AT SRINIVASANAGARA AND VINAYAKA NAGARA IN WARD NO-54. |
79 |
000-10-N-P--P-R-IM-038 |
|
Improvements to raods and drain at KEB Layout ward No-54. |
80 |
000-10-N-P--P-R-IM-034 |
|
IMPROVEMENTS TO ROAD AND DRAINS FROM GIRINAGARA 20TH MAIN TO 9TH CROSS ROAD IN WARD -54. |
81 |
000-06-I-H-P-R-IM-076 |
|
Providing asphalting to unasphalted roads/ correcting narrow roads/ Resurfacing selected roads including damage side walks in Bangalore city ward no-54 (rechange.no-67) |
82 |
|
|
Constructing High Raised pedestrian Crossing in Banashankari Area. |
83 |
|
|
Providing and construction of Toilet at A) Kathriguppe village B) Manjunathanagara |
84 |
000-10-N-P-P-R-IM-054 |
|
PRVD ASPH TO BAD RDS OF 2ND PHAS3RD STAGE 3RD PHASE OF 4TH AND 6TH BLK IN WARD NO. 54 |
85 |
122-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 122 |
86 |
123-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 123 |
87 |
132-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 132 |
88 |
132-11-N-G-O-P-PL-002 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 132 |
89 |
154-11-N-G-O-P-PL-002 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 154 |
90 |
154-11-N-G-O-P-PL-003 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 154 |
91 |
155-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 155 |
92 |
155-11-N-G-O-P-PL-002 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 155 |
93 |
162-11-000001 |
|
Filling up of pot holes and road curttings in ward 162 (first stage from Apr-2010 to Sep-2010) |
94 |
162-11-000002 |
|
Maintaince of Drains and roads by Tractor and Gangman |
95 |
162-11-000003 |
|
Depo Collection in ward no 162 |
96 |
162-11-000004 |
|
Earth Work Excavation and pot hole filling for Roads in ward no 162 (First Stage (April -2010 to Sept 2010) |
97 |
162-11-000005 |
|
Maintaince of Pedestrains road, road side drains kerb stones and Painting |
98 |
162-11-000006 |
|
Providing Name Boards in Nagendra Block, Raghavendra Block Girinagar T Block Banashankari 1st , 3rd and 4th Block |
99 |
162-11-000007 |
|
Painting to Old Name Boards writing and kerb stones maintainance in ward no 162 |
100 |
162-11-000008 |
|
Emergency Work in ward no 162 |
101 |
162-11-000009 |
|
Widening of road at Northern part of 13th Main Road of Muneshwara Block and improvements to drain in ward 162 |
102 |
162-11-000010 |
|
Widening of road at Northern part of 6th Main Road of Nagendra Block and improvements to drain in ward 162 |
103 |
162-11-000011 |
|
Widening of road at Northern part of SBM Colony in 16th Main Road and improvements to drain in ward 162 |
104 |
162-11-000012 |
|
Widening of Road in Banashankari 3rd Stage, 3rd Block, in 1st and 2nd Cross Road and drain improvements |
105 |
162-11-000013 |
|
Widening of Road and Drain improvements in Sai Mandira Road, Girinagar 2nd Stage, 8th B Cross Road. |
106 |
162-11-000014 |
|
Widening of Road and Drain improvements to 1st Main Road of Hosakarehalli Layout at Shakthi Ganapathi temple |
107 |
162-11-000015 |
|
Improvements of Drain and widening of Road in 6th main road of 4th Block Banashankari 3rd Stage |
108 |
162-11-000016 |
|
Improvements of Drain and widening of Road in 25th Main in Girinagar T Block |
109 |
162-11-000017 |
|
Improvements of Drain and widening of Road in 26th Main in Girinagar T Block |
110 |
162-11-000018 |
|
Widening and Improvements of 1st and 3rd main road in 1st and 3rd main road of Banashankari 1st block. |
111 |
162-11-000019 |
|
Widening and Improvments of 11th main Road and cross roads in Nagendra Block ward no 162 |
112 |
162-11-000020 |
|
Improvements of Drain and widening of Road in 7th cross of Sachidananda Ashram Road in Girinagar 2nd Stage |
113 |
162-11-000021 |
|
Improvemnts of Drain and widening of Vasavi Road, 2nd C , 5th c cross roads in girinagar 2nd stage. |
114 |
162-11-000022 |
|
Improvements of Drain and widening of Road at 3rd B main road, Kavith Jain Road Girinagar 2nd Stage. |
115 |
162-11-000023 |
|
Filling up of Potholes and road cuttings in ward 162 (second stage from 0ct-2010 to march-2010) |
116 |
162-11-000025 |
|
Providing 250 Watts SV Fittings/Poles/Control Wires/Park Lightings/Switches Etc,. in Ward No.162 |
117 |
162-11-000026 |
|
Rain Water Harvesting at Aralu Mallige Parthasarathi Road Play ground in W N 162 |
118 |
162-11-000027 |
|
Rain Water Harvesting at Pachavati Park in W N 162 |
119 |
162-11-000028 |
|
Rain Water Harvesting at Pachavati Park in W N 162 |
120 |
162-11-000029 |
|
Rain Water Harvesting at Pachavati Park in W N 162 |
121 |
162-11-000030 |
|
Rain Water Harvesting at Pushpanjali Park in W N 162 |
122 |
162-11-000031 |
|
Rain Water Harvesting at Vivekananda Park in W N 162 |
123 |
162-11-000032 |
|
Rain Water Harvesting in backside of Srinath House in W N 162 |
124 |
162-11-000033 |
|
Improvements of road in Banashakari 3rd stage,1st block and Byrappa garden 3rd block and bank colony |
125 |
162-11-000034 |
|
Improvements of road in banashankari 3rd stage,4th block,6th block(Hosakerehalli) and surrounding Pushapajali Park. |
126 |
162-11-000035 |
|
Construction of Cross drainage work at 21st, 23rd and 25th main road at Ragavendra Block ward no.162 |
127 |
162-11-000036 |
|
Improvement of Drain and widening of 3rd and 4th cross of BDA Layout Giringara in ward no. 162 |
128 |
162-11-000037 |
|
Improvement of Drain and widening of 4th main road of BDA Layourt girinagar in ward no. 162 |
129 |
162-11-000038 |
|
Improvement of Drain and widening of 5th cross road at 2nd stage Girinagara in ward no. 162 |
130 |
162-11-000039 |
|
Improvement of Drain and widening of 8th cross road of SBM Colony in ward no. 162 |
131 |
162-11-000040 |
|
Improvements drain and Widening of 3rd cross road at BSK 3rd stage, 3rd block in ward no. 162 |
132 |
162-11-000041 |
|
Improvements of Drain and widening in northern side roads 13th cross road at 2nd stage Girinagar in ward no.162 |
133 |
162-11-000042 |
|
Improvements of Drain and widening of 2nd main road at BSK 3rd stage 1st block in ward no. 162 |
134 |
162-11-000043 |
|
Improvements of Drain and widening of 3rd cross road at BSK 3rd stage 1st block in ward no. 162 |
135 |
162-11-000044 |
|
Improvements of Drain and widening of Southern side 13th cross road at 2nd stage Girinagar in ward no.162 |
136 |
162-11-000045 |
|
Imrpovement of Drain and widening of Southern side of 3rd cross at BSK 3rd stage 1st block ward no. 162 |
137 |
162-11-000046 |
|
Providing Water supply through tanker in ward no. 162 |
138 |
162-11-000047 |
|
Improvements to 12th main road and other cross road, road cutting and drain at Shamanna Slum in ward No-162 |
139 |
162-11-000048 |
|
Construction of Anganavadi Building in Shamanna Slum in ward No-162 |
140 |
162-11-000049 |
|
Improvements to drain in footpath in T R Shammana slum main roads and cross roads and others roads in ward no 162 |
141 |
162-11-000050 |
|
Construction of building in T R Shammana slum in ward no 162 |
142 |
162-11-000051 |
|
Land purchasing fo SC/ST and construction of induvidual houses buildings in ward no 162 |
143 |
162-11-000052 |
|
REPAIRS AND MAINTAINENCE OF BOREWELL AND PANEL BOARD IN PARKS IN WARD-162 |
144 |
162-11-000053 |
|
REPAIRS AND PAINTING TO EXISTING FENCING, PATHWA TO THE PARK COMING UNDER WARD NO 162 |
145 |
162-11-000054 |
|
PROVIDING AND FILLING SAND TO THE CHILDREN PLAY AREA AND PROVIDIING GRANITE BENCHES TO THE PARKS COMING UNDER 162 |
146 |
162-11-000055 |
|
TREE PLANTING IN WARD 162, 163 AND 164 |
147 |
162-11-000056 |
|
MAKING OF LEAF LITTER COMPOST IN PARKS IN WARD-162 |
148 |
162-11-000057 |
|
Development works in Panchavati Park in Ward no. 162 |
149 |
162-11-000058 |
|
Construction of Tailoring Training Centre in TR Shamanna Slum Area in ward no. 162 |
150 |
162-11-000059 |
|
Improvements to side drain and widening of footpath of 1st E Main road towards east(Dr. Rajendra Prasad Road) |
151 |
162-11-000060 |
|
IMPROVEMENTS TO SIDE DRAINS AND WIDENING OF FOOTPATH OF 1ST E MAIN ROAD TOWARDSWEST (DR. RAJENDRA PRASAD ROAD) |
152 |
162-11-000061 |
|
IMPROVEMENTS TO SIDE DRAIN AND WIDENING OF FOOTPATH OF 1ST A CROSS AND 1ST B CROSS OF 6TH BLOCK IN BANASHANKARI LAYOUT |
153 |
162-11-000062 |
|
improvements to side drain and widening of foorpath of 1st d croos of 6th block in banashankri layout |
154 |
162-11-000063 |
|
IMPROVEMENTS TO SIDE DRAIN AND WIDENING OF FOOTPATH OF EAST OF 1ST F CROSS OF 6TH BLOCK IN BANASHANKARI LAYOUT |
155 |
162-11-000064 |
|
improvements to side drain and widening of footpath of west of 1st F Cross 6th block in banashankri layout |
156 |
162-11-000065 |
|
improvements to side drain and wideining of footpath of balance roads of 2nd stage in girinagara |
157 |
162-11-000066 |
|
IMPROVEMENTS TO SIDE DRAIN AND WIDENING OF FOOTPATH OF 1ST H CROSS OF 2ND STAGE IN GIRINAGAR |
158 |
162-11-000067 |
|
improvements to side drain and widening of footpath of 1st D Cross of 2nd stage in girinagara |
159 |
162-11-000068 |
|
Balance work of footpath widening and drainage improvements in B S K 6th block in ward 162 |
160 |
162-11-000069 |
|
Balance work of footpath widening and drainage improvements in B S K 3rd Stage Avalahalli B D A Layout in ward 162 |
161 |
162-11-000070 |
|
Balance work of foorpath widening and drainage improvements in girinagara 1st stage 1st F Main and Cross roads in ward 162 |
162 |
162-11-000071 |
|
Improvement to side drain and widening of footpath of BSK III Stage, VI Block, I Cross Roads |
163 |
162-11-000072 |
|
Improvement to side drain and widening of Roads of BSK III Stage, VI Block, I ABC Cross Road |
164 |
162-11-000073 |
|
Improvement of side drain and widening of Roads of BSK III Stage VI Blcok, ID E cross Road |
165 |
162-11-000074 |
|
Improvement to side drain and widening of remaining Roads of BSK III Stage, VI Block 4,5,6 Main |
166 |
162-11-000080 |
|
Improvement to side drain and widening of remaining Roads of South side of 13 Main in Muneshwara Block. |
167 |
162-11-000081 |
|
Improvement to balance portion Drain in SBM colony in W.N 162 |
168 |
162-11-000082 |
|
BALANCE WORK OF FOOT PATH WIDENING AND DRAINAGE IMPROVEMENTST IN GIRINAGARA 1ST STAGE 7TH CROSS IN WARDNO. 162 |
169 |
162-11-000083 |
|
improvements to side drain and widening of footpath of balance roads in 1st stage in girinagara |
170 |
162-11-000084 |
|
Sinking, energing and commissioning including pipeline and erection of mini water tank for the new bore wells at ward no 162 |
171 |
162-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 162 |
172 |
162-11-N-G-O-P-PL-002 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 162 |
173 |
162-12-000001 |
|
Asphalting to Girinagara 80 feet road ward No.162 |
174 |
162-12-000002 |
|
Asphalting to Nehru main road and Chowdeshwari tent road in Ward no.162 |
175 |
162-12-000003 |
|
Asphalting to Girinagara 50 feet road from BDA park to 14th cross road and Dr.Mutthuraj road from Vidyapeetha |
176 |
162-12-000005 |
|
Construction of Brick platform (Brick on edges) for trees in ward no 162 |
177 |
162-12-000006 |
|
Construction of Dry Waste Collection Centre at Service Road, Vidyanagar, near SWD drain Giringara |
178 |
162-12-000007 |
|
Providing Percolation pit in side drains of roads in ward no 162 |
179 |
171-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 171 |
180 |
177-11-N-G-O-P-PL-003 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 177 |
181 |
182-11-N-G-O-P-PL-001 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 182 |
182 |
182-11-N-G-O-P-PL-002 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 182 |
183 |
R-162-11-000001 |
|
PRVD ASPH TO BAD RDS OF GIRINAGARA 2ND PHASE FROM 2ND C/R TO 14TH C/R IN WARD NO. 54 |
184 |
162-13-000001 |
|
Improvements To Drain Footpath In 7Th Main Nagendra Block In Ward No-162 |
185 |
162-13-000002 |
|
Improvements To Drain Footpath In 18Th Main To 1St Cross Muneshwara Block In Ward No-162 |
186 |
162-13-000003 |
|
Improvements To Drain Footpath In 9Th Main Nagendra Block In Ward No-162 |
187 |
162-13-000004 |
|
Improvements To Drain Footpath In 2Nd A Cross Nagendra Block In Ward No-162 |
188 |
162-12-000004 |
|
Desilting Of Storm Water Drain From 14Th Main Srinivasanagara To Ring Road In Juridction Of Girinagara In Ward -162. |
189 |
162-13-000005 |
|
Improvements To Drain Footpath In 17Th Main Muneshwara Block In Ward No-162 |
190 |
162-13-000006 |
|
Improvements To Drain Footpath In 24 Main, Girinagar T Block To 3Rd Cross Girinagar 1St Phase 1St Cross Girinagar 2Nd Phase In Ward No-162 |
191 |
162-13-000007 |
|
Improvements To Drain Footpath In 1St 2Nd Cross Of Raghavendra Block In Ward No-162 |
192 |
162-12-000008 |
|
Providing Rain Water Harvesting Well In Vacant Area Behind Bbmp Contact Point, Near Hosakerehalli In Ward No. 162 |
193 |
162-13-000008 |
|
Improvements To Drain Footpath In Southern Side Of 2Nd A Main Girinagar 1St Phase Addition In Ward No-162 |
194 |
162-12-000009 |
|
Providing Rain Water Harvesting Well In Shakthi Ganapathi Temple Park, Bsk 3Rd Stage, 7Th Block, In Ward No. 162 |
195 |
162-13-000009 |
|
Improvements To Drain Footpath In North Side Of 2Nd A Main Girinagar 1St Phase Addition In Ward No-162 |
196 |
162-13-000010 |
|
Improvements To Drain Footpath In 2Nd C Cross Girinagar 1St Phase Addition In Ward No-162 |
197 |
162-12-000010 |
|
Providing Rain Water Harvesting Well In Play Ground Girinagara 1St Stage, 2Nd Main Road In Ward No. 162 |
198 |
162-12-000011 |
|
Providing Rain Water Harvesting Well In Panchavati Park, Bsk 3Rd Stage, 7Th Block In Ward No. 162 |
199 |
162-13-000011 |
|
Improvements To Drain Footpath In Southern Side Of 3Rd C Main Girinagar 2Nd Phase In Ward No-162 |
200 |
162-12-000012 |
|
Providing Rain Water Harvesting Well Lin Vishveshwaraiah Park, In Avalahalli Bda Park, In Ward No. 162 |
201 |
162-13-000012 |
|
Engaging Private Tractor Gang In Rainy Season In Ward No- 162 |
202 |
162-12-000013 |
|
Providing Rain Water Harvesting Well In Swami Vivekananda Park In Girinagara 1St Stage In Ward No. 162 |
203 |
162-13-000013 |
|
Providing Cement Concrete Road To 3Rd Cross In Byrappa Garden In Ward No-162 |
204 |
162-12-000014 |
|
Construction Of Rcc Bridge Across Swd V-300 Behind Girinagara Police Station Vrishbavathi Valley Ward No-162 |
205 |
162-13-000014 |
|
Restoration Of Drain Slabs Kerbs And Painting In Ward No- 162 |
206 |
162-13-000015 |
|
Maintenance Of Tractor Gangmens In Ward No-162 |
207 |
162-12-000015 |
|
Improvements Ot Drain And Footpath To Chowdeshwari Tent Road From Swd To 2Nd Cross At Girinagara |
208 |
162-13-000016 |
|
Emergency Grant |
209 |
162-12-000016 |
|
Improvements To Drain And Footpath To 60Feet Road From 19Th Main Road To 7Th Main Road At Muneshwara Block Girinagra |
210 |
162-12-000017 |
|
Improvements To Drain And Footpath To 60Feet Road 7Th Main Road To 12Th Cross Road At Girinagara |
211 |
162-13-000017 |
|
Filling Pot Holes In Ward No-162 |
212 |
162-13-000018 |
|
Asphalting To 1St F Main 1St Gmain And 8Th A Cross Roads In Girinagara 2Nd Phase Ward No 162 |
213 |
162-12-000018 |
|
Improvements To Drain And Footpath To 60Ft Road From 12Th Cross To 14Th Cross At Girinagara |
214 |
162-13-000019 |
|
Asphalting To 1St H Main And 8Th Cross Roads In Girinagara 2Nd Phase Ward No 162 |
215 |
162-12-000019 |
|
Filling Of Pot Hole And Road Cutting In W.N 162 |
216 |
162-12-000020 |
|
Depo Collection For 2011-12 In W.N 162 |
217 |
162-12-000021 |
|
Emergency Grants In Ward 162 |
218 |
162-13-000022 |
|
Asphalting To 8Th B Crossand 8Th C Cross Roads In Girinagara 2Nd Phase Ward No 162. |
219 |
162-12-000022 |
|
Filling Road Cutting By Bwssb In 80 Feet Main Road In Ward No 162 |
220 |
162-12-000023 |
|
Filling Road Cutting By Bwssb In Girinagar 80 Feet Road |
221 |
162-12-000024 |
|
Filling Road Cutting By Bwssb In Girinagar Neharu Road |
222 |
162-12-000025 |
|
Filling Pot Holes Road Cutting In Ward No 162 Girinagar |
223 |
162-12-000026 |
|
Construction Of Ward Office In Vivekananda Park Girinagara In Ward No 162 |
224 |
162-12-000027 |
|
Reconstruction Of Culverts In Ward No 162 |
225 |
162-12-000028 |
|
Construction Of Culverts In Ward No 162 |
226 |
162-12-000029 |
|
Improvements To Side Drain Foot Path In 8Th Main Girinagar 2Nd Stage In Ward No 162 |
227 |
162-12-000030 |
|
Improvements To Side Drain Foot Path In 8Th 9Th Cross Girinagar 2Nd Stage In Ward No 162 |
228 |
162-12-000031 |
|
Improvement To Side Drain Foot Path In 10 Th 11Th Cross In Sbm Colony |
229 |
162-12-000032 |
|
Improvements To Side Drain Foot Path In 8Th C Cross Girinagar 2Nd Stage |
230 |
162-13-000033 |
|
Improvements To Drain And Footpath In 2B Cross Girinagara 1St Phase Additional In Ward No 162 |
231 |
162-12-000033 |
|
Improvements To Side Drain Footpath In 1St Cross Southern Side Bsk 1St Block 3Rd Stage |
232 |
162-12-000034 |
|
Providing Cement Concrete Road To 5Th Cross Siddivinayaka Layout |
233 |
162-12-000035 |
|
Providing Cement Concrete Road To 3Rd Cross Girinagar 1St Stage |
234 |
162-12-000036 |
|
Maintenance Of Tractor And Gangmens |
235 |
162-13-000036 |
|
Improvements To Drain And Footpath In 2Nd A Cross Girinagara 1St Phase Additional In Ward No 162 |
236 |
162-12-000037 |
|
Filling Of Bwssb Pipeline Trenches In Phase Girinagara Ward 162 |
237 |
162-13-000037 |
|
Improvements To Drain And Footpath In 2Nd B Main Road Girinagara 1St Phase Additional In Ward No 162 |
238 |
162-12-000038 |
|
Filling Bwssb Pipeline Trenches In 2Nd Pahse Girinagara Ward 162 |
239 |
162-13-000038 |
|
Improvements To Drain And Footpath In 2Nd C Main And Construction Of Culverts Girinagara 1St Phase Additional In Ward No 162 |
240 |
162-13-000039 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Girinagara Ii Phase In Ward No 162. |
241 |
162-12-000039 |
|
Replacement Of Damaged And Choked Up Pipeline In Nagendra Block In Ward 162 |
242 |
162-13-000040 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Bda Layout In Ward No 162. |
243 |
162-12-000040 |
|
Replacement Of Damaged And Choked Up Pipe Line In Muneshwara Block Ward 162 |
244 |
162-12-000041 |
|
Providing Borewell To Proposed Ward Office In Vivekananda Park Girinagara 162 |
245 |
162-13-000041 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Muneswara Block And Girinagara T- Block In Ward No 162. |
246 |
162-13-000042 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Nagendra Block In Ward No 162. |
247 |
162-12-000042 |
|
Construction Of Rcc Retaining Wall For Swd V 300 In Girinagara 2Nd Stage |
248 |
162-13-000043 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Raghavendra Block In Ward No 162. |
249 |
162-12-000043 |
|
Reconstruction Of Size Stone Masonrywall Forswd V 300 In Girinagara In Ward No 162 |
250 |
162-13-000044 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Bsk 3Rd Stage 3Rd Phase 1St Block In Ward No 162. |
251 |
162-12-000044 |
|
Constructionof Rcc Box Drain From 80 Feet Road To Par Near Adan School In Vidyanagara In Ward No 162 |
252 |
162-12-000045 |
|
Providing 250Watts Sv Fittings Control Wire Control Switches Park Lightings In Ward 162 |
253 |
162-13-000045 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Bsk 3Rd Stage 3Rd Phase 3Rd Block In Ward No 162. |
254 |
162-13-000046 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Bsk 3Rd Stage 2Nd Phase 7Th Block In Ward No 162. |
255 |
162-12-000046 |
|
Providing Electrification And Fixtures To The Contact Point In Ward No 162 |
256 |
162-13-000047 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Sbm Colony And Byrappa Garden In Ward No 162. |
257 |
162-12-000047 |
|
Providing Special Repaires To Highmast Park Panel Boards Timer Control Box In Ward 162 |
258 |
162-13-000048 |
|
Restoration Of Drain Covering Slabs Kerbs And Painting To Kerb Stones In Srinivasanagara In Ward No 162. |
259 |
162-12-000048 |
|
Upgradation Of Street Light At 60 Feet Road From Sita Circle To Hoskere Halli Cross In Ward No 162 |
260 |
162-12-000049 |
|
Remodelling Os Storm Water Drain And Construction Of Ssm And Rcc Retaining Wall At Vulnerable Points For Swd V300 And Construction Of Rcc Box Drain To 80Feet Road Near Adan School In Ward No 162 Girin |
261 |
162-12-000050 |
|
Construction Of Rcc Retaining Wall At Vivekananda Park And Widening Of Road With Cc |
262 |
162-12-000051 |
|
Providing Asphalting To Damaged Roads In Vivekananda Park |
263 |
162-12-000052 |
|
Asphalting To Damaged Roads At Bsk 3Rd Stage 2Nd Phase 6Th Block (Balance Portion) |
264 |
162-12-000053 |
|
Asphalting To Damaged Road Of Sri Rama Mandira Road And Damaged Roads Of Nagendra Block And Muneshwara Block (Balance Portion) In Ward No162 |
265 |
162-13-000054 |
|
Improvements To Drain And Footpath In Northern Side Of 50 Feet Road From 3Rd Main To 11Thmain Girinagar In Ward No- 162 |
266 |
162-12-000054 |
|
Restoration Of Bwssb Road Cutting Portion In Ward No 162 |
267 |
162-13-000055 |
|
Asphalting To 1St Main And 1St B Main Road And 2Nd Cross Roads In 7Th Block Bsk 3Rd Stage2 Avb Cross 3 Cross I St Phase Girinagar In Ward No 162 |
268 |
162-12-000055 |
|
Providing Rcc Box Type Drain To Secondary Drain At Across The 80Ft Road Balance Portion (Opp Aden School) |
269 |
162-12-000056 |
|
Improvements To Side Drains And Footpath In 4Th And 5Th Main Nagendra Block In W.No 162 |
270 |
162-13-000056 |
|
Asphalting To 1St 2. 3. 4. Th Mainroad In Bda Layoutgirinagar In Ward No 162 |
271 |
162-12-000057 |
|
Improvements To Side Drains And Footpath In 5Th Main Ragavendra Block In W.No 162 |
272 |
162-13-000057 |
|
Asphalting To 3 C 3B 4Th Main Road And 5Th Main Abcd Corss 8Th And 9Th Cross In 2 Phase Girinagar In Ward No 162 |
273 |
162-13-000058 |
|
Asphalting To In 5. 6. 7 And 8Th Main Roadand 10. 11. 12. 13Th Cross In 2 Phase Girinagar In Ward No 162 |
274 |
162-12-000058 |
|
Improvemenst To Side Drains And Footpath In 12Th Main Of Nagendra Block And 14Th Main Nagendra Block In W.No 162 |
275 |
162-13-000059 |
|
Asphalting To To Balance Road Work In 6 Block Sbm Colony And Girinagar T Block In Ward No 162 |
276 |
162-13-000060 |
|
Providing Asphlting To 1St Addtion Girinagar From 80 Ft (Westen)Road To Bsk Iii Stage Connected To Link Roads In Girinagar In Ward No 162 |
277 |
162-12-000060 |
|
Repairs And Maintainence Of Borewell In Parks In Ward No 162 |
278 |
162-13-000061 |
|
Providing Asphlting To Connected Roads Of Bhirappa Garden And Hosakerehalli Cross Road (Water Tank Roads) In Bsk Iii Stage Girinagar In Ward No 162 |
279 |
162-13-000062 |
|
Improvements To Drain And Footpath In Aralu Mallige Parthasarathi Road In Ward No 162 Girinagar |
280 |
162-13-000063 |
|
Improvements To Drain And Footpath In Manjunatha Swamy Temple Road In Ward No 162 Girinagar |
281 |
162-13-000064 |
|
Providing 250Watts Sv Fittings Control Wire Control Switches Park Lightings In Ward 162 |
282 |
162-13-000065 |
|
Providing Fencing To The Pushpanjili Park Play Ground In 3Rd A Main Bsk 3Rd Stage 2Nd Phase 6Th Block In Ward No 162 |
283 |
162-13-000066 |
|
Providing Asphalting To Balancing Link Roads Connecting Water Tank In Bsk 3Rd Stage In Ward No 162 |
284 |
162-13-000067 |
|
Providing Electricals Works To Basvangudi Constituancy Ward 162 |
285 |
162-13-000068 |
|
Dry Waste Collection And Sorting Center In Ward No 162 |
286 |
162-13-000069 |
|
Pot Holes Filling To The Arterial And Sub Arterial Roads During In Ward 162 |
287 |
162-11-000075 |
|
Improvement To Side Drain And Widening Of Remaining Roads Of Nagendra Block, 11 Main. |
288 |
162-11-000076 |
|
Improvement To Side Drain And Widening Of Roads Of 1 Phase, Ii E Cross, Ii B Cross, I B Main And Iii Cross In Girinagar. |
289 |
162-11-000077 |
|
Improvement To Side Drain And Widening Of Roads Of B S K Iii Block, Vii Cross Road. |
290 |
162-11-000078 |
|
Improvement To Side Drain And Widening Of Roads Of B S K Iii Phase, Iii Block, Vi Cross Road. |
291 |
162-11-000079 |
|
Improvement To Side Drain And Widening Of Remaining Roads Of North Side Of 13 Main In Muneshwara Block. |
292 |
162-14-000001 |
|
Providing borewells in ward no 162 |
293 |
162-14-000002 |
|
Filling of potholes and road cutting in Ward No.162 |
294 |
162-14-000003 |
|
Maintenance of road and footpaths in Ward No.162 |
295 |
162-14-000004 |
|
Depot collection in Ward No.162 |
296 |
162-14-000005 |
|
Emergency works in Ward No.162 |
297 |
162-14-000006 |
|
Construction of Gazebo in Vivekananda Park in Ward No.162 |
298 |
162-14-000007 |
|
Construction of Corporation Building in Manjunathaswamy Play Ground SBM Colony in Ward No.162 |
299 |
162-14-000008 |
|
Improvements to side drains and providing RCC concrete road to Eastern side of Nehru road from 1st Main BDA Layout to Girinagar 80 Feet Road in Ward No.162 |
300 |
162-14-000009 |
|
Improvements to side drains and providing RCC concrete road to Southern side of Nehru road from 1st Main BDA Layout to Girinagar 80 Feet Road in Ward No.162 |
301 |
162-14-000010 |
|
Improvements to side drains and Footpaths of 2nd C cross Nagendra Block in Ward No.162 |
302 |
162-14-000011 |
|
Improvements to side drains and Footpaths 14th cross Girinagara from Sri D Venkateshmurthy road to ring in ward no 162 |
303 |
162-14-000012 |
|
Improvements to side drains and providing RCC concrete road to 2nd D cross and 3rd cross of Nagendra Block in Ward No.162. |
304 |
162-14-000013 |
|
Improvements to side drains and providing RCC concrete road to 7th main of Nagendra Block in Ward No.162 |
305 |
162-14-000014 |
|
Improvements to side drains and chain fencing to 17th main of Srinivasnagar in Ward No.162 |
306 |
162-14-000015 |
|
Improvements to side drains of 15th main and cross roads of Muneswara Block in Ward No.162. |
307 |
162-14-000016 |
|
Repairs to Shoulder drains in Arterial Sub arterial and interiors roads |
308 |
162-14-000017 |
|
Construction of bridge across storm water drain at 50 feet road Nagendra block |
309 |
162-14-000018 |
|
Reconstruction of SSM retaining wall in place of collapsed SSM wall of secondary SWD of V-122 in Muneshwara block and Boregowda slum in Girinagara ward no.162 and ward no.157 |
310 |
162-14-000019 |
|
Improvements to drain and footpath to East side of Neharu road in ward no 162 |
311 |
162-14-000020 |
|
Maintainence of Pushpanjali Park |
312 |
162-14-000021 |
|
Maintainence of Sir M.Visheshwaraiah Park Avalahalli |
313 |
162-14-000022 |
|
Maintainence of Panchavati Park Shakthi Ganapathi Park and 80 feet MankuThimma Park |
314 |
162-14-000023 |
|
Maintainence of Dr. Muttu Raj Park SBM Colony Park |
315 |
162-14-000024 |
|
Maintainence of Swamy Vivekananda Park |
316 |
162-14-000025 |
|
Improvements to drain and footpath to North side of D Venkatesh Murthy road in ward no 162 |
317 |
162-14-000026 |
|
Developments of roads from 80ft road to Giringara 1st stage link roads in ward no 162 |
318 |
162-14-000027 |
|
Development of balance roads in front of swamy Vivekananda park connecting to Muneshwara block and Nagendra block in ward no-162 Girinagara |
319 |
162-14-000028 |
|
Resurfacing the roads with asphalt of blance roads in BSK 3rd stage 2nd phase 4th block 6th block Girinagara 1st phase, 2nd phase, byrappa garden and muneshwara block blance roads in ward no-162 Girin |
320 |
162-14-000029 |
|
Electrical maintainence works in Basavanagudi constituency W.N 154 , 155, 156, 162, 163, 164 |
321 |
162-14-000030 |
|
Improvements to footpath and side drain at Neharu road Western side from 50feet road up to SW drain Grinagara 1st stage in ward no 162 |
322 |
162-14-000031 |
|
Improvements to side drains footpaths at sourthern side of D Venkateshmurty road in ward no 162 |
323 |
162-14-000032 |
|
Widening and improvements to side drain from 80feet road to Girinagara 1st stage Link road in ward no 162 |
324 |
162-15-000001 |
|
Maintetnance of drains and footpaths in Ward No 162 |
325 |
162-15-000002 |
|
Repairs and potholes filling in Ward No 162 |
326 |
162-15-000003 |
|
Reserve for Emergency |
327 |
162-15-000004 |
|
Improvements and construction of drain at BSK 3rd Stage from 17th main Muneshwara Block to 2nd main Girinagar balance portion in Ward No 162 |
328 |
162-15-000005 |
|
Improvements to footpath and drains at 1st cross from 3rd main Nagendra Block to 17th main of Muneshwara Block in Ward No162 |
329 |
162-15-000006 |
|
Reserve fund |
330 |
162-15-000007 |
|
Improvements and construction of drain and footpath at 2nd cross from 2 C main to SWD in Ward No 162 |
331 |
162-15-000008 |
|
Improvements and construction of drain balance portion at Girinagar 1st Phase addition in Ward No 162 |
332 |
162-15-000009 |
|
Improvements to draina at 4th and 5th main from 1st cross to 2nd cross and sdurrounding area at Nagendra Block in Ward No 162 |
333 |
162-15-000010 |
|
Improvements and construction of drain at 11th cross and 2nd main SBM colony balance portion in Ward No 162 |
334 |
162-15-000011 |
|
Construction of drain and providing CC to road surface at 4th main BSK 3rd stage BDA Layout in Ward No 162 |
335 |
162-15-000012 |
|
Asphalting to 2nd A 2nd B main road at 1st Phase Girinagar in Ward No 162 |
336 |
162-15-000013 |
|
Asphalting to 2nd D main 2nd C cross at 1st Phase addition Girinagar in Ward No 162 |
337 |
162-15-000014 |
|
Repainting and Refixing street name boards in Ward No 162 |
338 |
162-15-000015 |
|
Improvements to drain at 8th cross Srinivasnagar from 16th main to deadend road in Ward No 162 |
339 |
162-15-000016 |
|
Improvements to drain and footpath 6th 7th main and 2C cross Nagendra Block balance portion in Ward No 162 |
340 |
162-15-000017 |
|
Providing electrification and fixtures to Anganwadi and tailoring centre at TR Shamanna Nagar in Ward No 162 |
341 |
162-15-000018 |
|
Shifting of BESCOM poles in Girinagar Ward No 162 |