Malleshwaram Ward (Wardno:45) Project Details Total Projects : 336
|
SL No. |
Workcode |
View / Comments |
Project Name |
1 |
31-10-M G E D IM 011 |
|
aimprovements to drains culverts and footpath at Subedarpalya (Yeshvanthapura) at Malleshwaram in ward no 31 |
2 |
100-09-N-G-H-P-LS-007 |
|
LANDSCAPE DEVELOPEMENT WORK AT N.G.E.F. LAYOUT IN WARD NO-100 |
3 |
100-08-N-G-H-P-FE-009 |
|
PROVIDING CHAINLINK FENCING TO CHILDREN PLAY EQUIPMENT TO THE PARK BY THE SIDE OF WARD OFFICE PARK |
4 |
065-10-N-O-E-O-MI-001(PACKAGE-01) |
|
PROVIDING ADDITIONAL WASHING MACHINE and PROVIDING GENERATOR ALONG ELECTICFICATION POWER @ DHOBI GHAT KODANDARAMPURA W-5 |
5 |
065-10-N-O-E-O-MI-001 |
|
Providing Additional Washing Machine & Providing Generator at Dhobi Ghat in Kodandaramapura. |
6 |
065-10-N-G-E-B-FO-003 (consultancy servi |
|
CONSULTANCY SERVISES FOR CONSTRUCTION OF BBMP OFFICE @ 11TH CROSS MALLESHWARAM |
7 |
065-10-N-G-E-B-FO-003 |
|
Constrcution of BBMP office at 11th cross Malleshwaram ward no. 7 |
8 |
055-10-N-G-H-P-MI-001 |
|
PROVIDING CHILDRENS PLAY EQUIPMENT AND OTHER DEVELOPMENT WORK TO VACANT PARK NEAR EAST WEST PARK IN WARD NO-65 |
9 |
053-10-NGER-UP-001 |
|
Construction of Masonary Drain From Sampige Road to CCA Road Left side at 7th Cross in Malleswaram ward 53 |
10 |
053-10-NGEO-FE-001 |
|
Providing Chain Link Fencing to BBM Property in ward No-53 |
11 |
053-10-MGHP-MN-001 |
|
PROVIDING & REPAIRS TO CHAIN LINCK FENCING AT SIRUR PARK AT MLM -53 |
12 |
032-10-N-G-H-P-LS-001 |
|
LANDSCAPE DEVELOPMENT WORK AT SANKEY KERE PARK IN WARD NO-5 |
13 |
032-10-M-G-H-P-MN-007 |
|
SECURITY OF SANKEY TANK PARK |
14 |
031-10-N-G-H-P-CD-001 |
|
DEVELOPMENT WORK AT BALASUBRAMANYAM PARK |
15 |
031-10-M-G-T-O-MI-01 |
|
Providing lighting system to the Kabbadi ground in Subedarpalya. |
16 |
031-10-M-G-T-B-FT-01 |
|
Repairs & Providing Additional Fixtures to the BBMP Building in Malleshwaram Area |
17 |
027-08-M-G-H-P-LS-009 |
|
LANDSCAPE DEVELOPMENT WORK AT BASHYAM PARK |
18 |
022-08-N-G-H-P-PV-003 |
|
PROVIDING EUROCON TILES PATHWAY AND RAISING CHAINLINK FENCING TO LAKSHMAN RAO PARK |
19 |
018-10-N-G-O-P-PL-017/003/005/ 000-10-N- |
|
RAINING and MAINTENENCE OF 2009/10 MANSOON PLANTATION |
20 |
009-09-M-G-H-P-FE-002 |
|
PROVIDING ORNAMENTAL GRILL TO PATHWAY AT MILK COLONY PARK PART-2 |
21 |
009-09-M-G-H-P-FE-001 |
|
PROVIDING ORNAMENTAL GRILL TO PATHWAY AT MILK COLONY PARK PART-1 IN WARD NO-09 |
22 |
008-08-I-G-D-B-IM-003 (PACKAGE-1) |
|
Repais to public urinals at harichandraghat in ward no. 8 |
23 |
008-08-I-G-D-B-IM-003 |
|
Repais to public urinals at harichandraghat in ward no. 8 |
24 |
007-09-N-G-T-G-LG-001 |
|
Providing Additional lighting to the Malleswaram Play Ground. |
25 |
007-09-N-G-L-O1M-001 |
|
Sub-Est for Providing Electrification to newly constructed automatic washing machine room and improvements to Dobhi Ghat at Kodandarampura malleshwaram in Ward No.5 |
26 |
007-09-N-G-L-O-IM-001Package-01 |
|
Providing and installation of Effluent treatment plant for the work of Construction automatic washing machine and room other works @ Dhobi ghat in Kodandarampura |
27 |
007-09-N-G-H-P-CD-001 |
|
DRILLING OF NEW BOREWELL AT RAILWAY STATION PARK IN WARD NO-7 |
28 |
007-09-N-G-H-P-BD-001 |
|
DRILLING OF NEW BOREWELL AT RAILWAY STATION PARK IN WARD NO - 07 |
29 |
007-09-N-G-E-O-FO-003 |
|
Sub-Estimate for providing electrification to newly Constructed Toilet at 11th Cross Railway Station Opp Manipal Hospital Malleshwaram Ward No.07 |
30 |
007-09-N-G-E-O-FO-001 |
|
Sub-Estimate for providing electrification to newly Constructed Toilet at 7th Cross Opp Krishna Sweets Malleshwaram Ward No.07 |
31 |
007-09-N-G-E-F-G-FO-001 |
|
CONSTRUCTION OF READING ROOM SPORTS ROOM & PAVILLION AT PIT COLONY GROUND IN W-07 |
32 |
007-09-N-G-B-E-EF-001 |
|
Providing Electrification to the Corporation Building (Gokule Institute) at 13th Cross Malleswaram |
33 |
007-09-M-G-H-P-MN-002 |
|
Maintaince Of New Market Park 12 th Cross |
34 |
007-09-M-G-E-O-MI-002 |
|
IMPROVEMENTS TO PIT COLONY GROUND IN WARD NO-07 |
35 |
007-09-M-G-A-B-SR-001 |
|
SPECIAL REPAIRS TO JOINT COMMISSIONER WEST OFFICE |
36 |
006-08-N-G-H-P-IM-005 |
|
LANDSCAPE DEVELOPEMENT WORK AT W.H.GOPAL PARK IN WARD NO-06 |
37 |
005-09-NGEO-DS-001 |
|
CONSTRUCTION OF RCC DRAIN & COVERING SLABS FROM SANKEY TANK TO MARAMMA CIRCLE IN WARD NO-05. |
38 |
005-09-N-G-H-P-LS-002 |
|
LANDSCAPE DEVELOPMENT WORK AT WARD OFFICE PARK IN WARD NO-5 |
39 |
005-09-N-G-E-O-FO-001 |
|
Sub-Estimate for providing electrification to newly Constructed Toilet at 4th Cross S.P.Extn Malleshwaram Ward No.32 |
40 |
005-09-N-G-E-G-FO-001 CONSULTANCY SERVISES |
|
CONSULTANCY SERVISES FOR CONSTRUCTION OF INDOOR SPORTS BASKET BALL STADIUM @ W-8 KODANDARAMAPURA MALLESHWARAM |
41 |
005-09-N-G-E-G-FO-001 CONSULTANCY SERVIS |
|
CONSULTANCY SERVISES FOR CONSTRUCTION OF INDOOR SPORTS BASKET BALL STADIUM @ W-8 KODANDARAMAPURA MALLESHWARAM |
42 |
005-09-N-G-E-G-FO-001 |
|
Construction of Indoor (sports)basket ball stadium at ward no. 5 Kodhandarampura in malleshwaram. |
43 |
005-09-N-G-E-G-CD-001 |
|
IMPROVEMENTS TO CHILDRENS PLAYING AREA & CONSTRUCTING COLLAPSED RETAINING WALL IMPROVEMENT WORKS AT SANKEY TANK IN WARD-05 |
44 |
005-09-M-G-T-O-IL-001 |
|
Providing Temprovary illumination in connection with Immersion of Lord Ganesha Idols to the Sankey Tank |
45 |
005-08-N-G-H-P-PV-006 |
|
RAISING CHAILINK FENCING PATHWAY AND OTHER DEVELOPMENT WORK AT 3RD CROSS NEAR R.V.APARTMENT IN WARD NO-05 |
46 |
005-08-N-G-H-P-LS-001 |
|
LANDSCAPE DEVELOPMENT WORK AT WARD OFFICE PARK IN WARD NO-5 |
47 |
005-08-N-G-E-G-MI-002 |
|
PROVIDING CHILDREN PLAY EQUIPMENTS BESIDE OF SHISHUVIHAR AT VACANT AREA |
48 |
005-05-M-G-H-P-MN-005 |
|
MAINTAINANCE OF GAYITHRI DEVI PARK OPP TO CHOWDESHWARI MEMORIAL HALL |
49 |
005-04-N-G-E-C-OO-001 |
|
Pro Elec. to the Newly cons Open air theatre Gymnasium Building Tennis Sports Building and Improvements of Playground at 12th Cross K.R.Pura |
50 |
003-08-N-G-H-P-FE-001 |
|
PROVIDING ORNAMENTAL GRILL TO MEDIAN AT MATTIKERE MAIN ROAD IN WARD NO -4 |
51 |
000-10-N-P-P-O-MI-006 |
|
perparation of feasibility report for the constrctuion of underpass/srufacepass at opposite to M.S. Ramaiah hospital |
52 |
000-10-N-P-P-O-MI-005 |
|
Perparation of feasibility report of constrction of underpass/surface pass at Near 8th main junction Mallehwaram |
53 |
000-10-N-P-P-O-MI-004 |
|
Perparation of feasibility report for constrctuion of underpass/surface pass at ISRO Junction. |
54 |
000-10-N-P-P-O-MI-001 Package-01 |
|
Modrenisation of Dhobi ghat at Kodandarampura 3rd phase Malleshwaram. |
55 |
000-10-N-P-P-O-MI-001 |
|
Preparation of DPR for Restoration and Comprehensive development of Bellandur Lake |
56 |
000-10-N-P-L-B-FO-004 |
|
Construction of Nirmala Bangalore Toilet Block at Viyalikaval Play ground ward no.99 in Bangalore City |
57 |
000-09-N-P-P-O-MJ-021 |
|
PREPARATION OF FEASIBILITY REPORT FOR CONSTRUCTION OF UNDERPASS AT MALLESHWARAM 18TH CROSS NEAR CET CELL USING R.C.C.PRECAST ELEMENTS |
58 |
000-09-N-P-P-O-MI-021 |
|
PREPARATION OF FEASIBILITY REPORT OF UNDER PASS AT MALLESHWARAM 18TH CROSS NEAR C.E.T.CELL . |
59 |
000-09-N-G-T-S-LG-002 |
|
Providing 250 SV/MH fittings to the Malleswaram constituency in Ward No. 4578 & 9 |
60 |
000-09-M-P-E-R-AS-029 |
|
Asphalting to surrounding roads of R.O.B.& concreting to service roads on either sides of ROB at HMT road Mathikere (towards sourthren side of Mathikere) ITEM NO-04 |
61 |
000-09-M-P-E-R-AS-027 |
|
Asphalting to surrounding roads of ROB concreting to roads service road on either sides of of ROB at HMT road road Mathikere (towards BEL road) item No-3 |
62 |
000-09-M-G-T-B-MN-001 |
|
A.M.C. of Electrical Installation by engaging Electrician wire menHelper with maintenance materials of the BBMP Building etc. complete in Malleswram Constituency |
63 |
000-09-M-G-H-P-MN-002 |
|
PROVIDING CHILDREN'S PLAY EQUIPMENT AT SHIVANAHALLI PARK IN WARD NO-20 |
64 |
000-09-M-G-H-P-MN-001 |
|
SUPPLY OF LABOURERS TO MALLESHWARAM |
65 |
000-09-M-G-H-P-IM-001 |
|
PROVIDING SAND AND OTHER IMPROVEMENTAL WORKS AT CHILDRENS PLAY EQUIPMENT FROM 0 TO 10 WARDS |
66 |
000-09-M-G-H-P-CD-009 |
|
SUPPLY OF ORNAMENTAL PLANTS TO NURSERY WEST ZONE |
67 |
000-09-M-G-H-P-CD-008 |
|
SUPPLY OF RED EARTH HORSE MENURE SAND |
68 |
000-08-N-J-I-R-AS-015 |
|
ASPHALTING TO ROAD FROM SAMPIGE THEATRE TO BWSSB OFFICE NEAR CORPORATION SCHOOL (VIA AYYAPPA SWAMY TEMPLE) |
69 |
007-09-N-G-L-O-IM-001 |
|
PROVIDING & CONSTRUCTING AUTOMATIC WASHING MACHINE & ROOM & OTHER IMPROVEMENT WORKS AT DHOBI GHAT IN KODANDARAMAPURA FOR 600KG'S OF WOOD FIRE BOILER W-07 |
70 |
|
|
Construction of individual houses at New Bagalur layout 3rd & 4th cross €˜A€™ Block |
71 |
|
|
CONSTUCTION OF DRAINS CULVERTS in CHINAPPA GARDENsheshdi roadramakka block marappa thota mudaama garden AND AREAS IN WARD 92 |
72 |
|
|
Construction of reading room sports room pavilion at pit colony ground in ward no. 7 |
73 |
|
|
LANDSCAPE DEVELOPMENT WORK AT K.C.GENERAL HOSPITAL PARK |
74 |
007-09-N-W-E-R-FO-001 |
|
CONSTRUCTION OF THE INDIVIDUAL HOUSES IN SUBEDARPALYA NEW HARIJANA COLONY BHAIRAHAN UMAIAH SLUM & KARIMANDI SLUM & PURCHASE OF LAND IN WARD NO.7 |
75 |
000-10-M-N-A-O-MN-002 |
|
ANNUAL MAINTS OF HELP POINT AND CLEARING THE DEBRIS AND OVER BURDEN EARTH WARD NO 43 |
76 |
031-10-M-W-E-B-MN-001 |
|
REPAIRS TO DWELLING UNIT AND CONST OF ANGANAWADI BUILDING AT VINAYAKA SLUM, PIPELINE RD YESHWANPUR, IN MALLESWARAM WARD NO. 31 |
77 |
045-08-I-G-T-E-IM-001 |
|
SUPPLYING AND FIXING OF STREET LIGHTS WOODEN BOX WITH NECESSARY BOLTS NUTS CLAMPS WIRES IN AJAD NGR WARD |
78 |
045-08-I-W-E-R-IM-001 |
|
IMPTS WORKS at BANDE SLUM IN W-45 |
79 |
045-08-M-G-H-P-MN-001 |
|
HORT MAINTS OF PARK at MYSORE RD BELOW FLY OVER IN W-45 |
80 |
045-08-M-G-H-P-MN-002 |
|
HORT MAINTS OF AJADNAGAR PARK IN W-45 |
81 |
045-08-M-G-H-P-MN-003 |
|
CIVIL MAINTS OF PARK at MYSORE RD BELOW FLY OVER IN W-45 |
82 |
045-08-M-G-H-P-MN-004 |
|
CIVIL MAINTS OF AJADNAGAR PARK IN W-45 |
83 |
045-08-M-G-T-B-EF-001 |
|
PRVD ELF TO SHISHUVIHAR at MYSORE RD IN WN-45 |
84 |
045-08-M-G-T-E-RE-001 |
|
REPAIRS TO SUBMERSIBLE PUMPSET at SAMUDAYA BHAVAN AZAD NGR IN WN-45 |
85 |
045-08-M-G-T-P-EG-001 |
|
REPAIRS TO ELECTRICAL INSTL TO KANIYARA COLONY PARK AZAD NGR IN W-45 |
86 |
045-08-N-G-E-B-FO-001 |
|
CONST OF COMPOUND WALL ( BALANCE PORTION) AND IMPTS TO PLAY GND at OPP TO KASTURABA JUNIOR COLLEGE IN W-45 |
87 |
045-08-N-G-E-C-FO-001 |
|
IMPTS TO CLTS AND RSD at KASTURI NGR IN W-45 |
88 |
045-08-N-G-E-D-FO-001 |
|
CONST OF 2ND STAGE SWD at VITTAL NGR IN W-45 |
89 |
045-08-N-G-E-R-AS-001 |
|
PRVD ASPH TO RAMACHANDRA AGRAHARA AND VIJAYA NGR L/O IN W-45 |
90 |
045-08-N-G-E-R-AS-003 |
|
PRVD RECHIP-CTR TO MN AND CRS RDS OF KASTURIBA NGR VITTAL NGR AND VALMIKI NGR |
91 |
045-10-M-G-T-O-MN-001 |
|
SHIFTING OF ELECTRIC POLES AND TRANSFORMERS IN KRPURA WARD AREA |
92 |
045-10-N-G-T-S-MN-001 |
|
OPERATION and MAINTS OF ST LIGHT IN KRPURA WARD AREA |
93 |
045-10-N-W-T-S-IL-001 |
|
ILLUMINATION and ELF WORKS IN A K CLY IN K R PURA |
94 |
045-11-000001 |
|
Filling of Potholes in ward no.45 |
95 |
045-11-000002 |
|
Improvements to Footpath and drains at 8th main Malleshwaram from 15th cross 18th cross in ward no.45 (Eastern side) |
96 |
045-11-000003 |
|
Improvements to Footpath and drains at 8th main Malleshwaram from 15th cross 18th cross in ward no.45 (Western side) |
97 |
045-11-000004 |
|
Construction of culvert at NH4 near Gokuldas Garments Yeshwanthpur Ward no.45 |
98 |
045-11-000005 |
|
Providing concreting to conservancy roads behind Kashi Matta between 18th and 19th cross in ward no.45 |
99 |
045-11-000006 |
|
Improvements to drain and Footpath at 9th main road from 3rd cross to 4th cross, Gokula 1st stage, 2nd phase in ward no.45 (Both Side) in ward no.45 |
100 |
045-11-000007 |
|
Improvements to drain and Footpath at 8th main road from 3rd cross to 4th cross, Gokula 1st stage, 2nd phase in ward no.45 (Both Side) |
101 |
045-11-000008 |
|
Improvements to drain and Footpath at 5th main road from 4th cross to 7th cross, Gokula 1st stage, 2nd phase in ward no.45 (Both Side) |
102 |
045-11-000009 |
|
Improvements to drain and Footpath at 6th main road from 4th cross 1st phase 2nd stage Gokula to 4th cross K.N. Extn., in ward no.45 (Eastern side) |
103 |
045-11-000010 |
|
Improvements to drain and Footpath at 6th main road from 4th cross 1st phase 2nd stage Gokula to 4th cross K.N. Extn., in ward no.45 (Western side) |
104 |
045-11-000011 |
|
Improvements to drain and Footpath at 5th `A` and `B` cross road from Triveni road to 11th main (Y. Narayanaswamappa Road) 1st phase 4th stage K.N. Extn., in ward no.45 (Both side) |
105 |
045-11-000012 |
|
Maintenance and Improvements of Shoulder drain in 8th main Malleshwaram in Ward no.45 |
106 |
045-11-000013 |
|
Removing and resetting of drain slabs and desilting of drain at K.N. Extn., in Ward no.45 |
107 |
045-11-000014 |
|
Removing and resetting of drain slabs and desilting of drain atGokula 1st stage 2 and 4th phase in Ward no.45 |
108 |
045-11-000015 |
|
Engaging Private Labours and Tractor for Desilting of Drains and in Ward no.45 |
109 |
045-11-000016 |
|
Emergency Works in Subedarpalya ward no.45 |
110 |
045-11-000017 |
|
Emergency Works in Malleshwaram ward no.45 |
111 |
045-11-000018 |
|
Emergency Works in K.N. Extn., ward no.45 |
112 |
045-11-000019 |
|
Emergency Works in Gokula ward no.45 |
113 |
045-11-000020 |
|
Asphalting to roads at Kamalanehru layout in W N 45 |
114 |
045-11-000021 |
|
Asphalting to Roads at Malleswaram Gokul and Subhedhar palya layout in W N 45 |
115 |
045-11-000022 |
|
Providing Cement Concrete to roads at Malleswarm Gokul 1st Stage 2th Phase and Roads in between 4th and 5th Cross roads in W N 45 |
116 |
045-11-000023 |
|
AMC of Electrical Crematorium engaging with required staff including periodically repairs of furnaces, D.G. Sets, Cleaning of Scrubber, Chimnney, repairs to motor etc., at Mediagrahara Electrical Crematorium |
117 |
045-11-000024 |
|
AMC of Electrical Installation,Lift,DG set,Pump set with engaging required staff at Yeshwanthpura Shopping Complex in ward no-45. |
118 |
045-11-000025 |
|
Maintenance and Repairs of DG set,Pump set etc.,at Malleswaram constituency. |
119 |
045-11-000026 |
|
Providing SV/MH Fittings,Control Switch and Connected accessories to the Malleswaram in ward No-45. |
120 |
045-11-000027 |
|
Construction of 6 Individual Houses at Subedar Pallya, Harijana Colony and Siddarth Slum in Ward No. 45 Malleshwarm |
121 |
045-11-000028 |
|
Construction of 4 Individual Houses at Subedar Pallya Harijana Colony and Siddarth Slum in Ward No. 45 Malleshwaram |
122 |
045-11-000029 |
|
Construction of 4 Individual Houses at Subedarpallya, Harijana Colony and Siddarth Slum in W.no.45 Malleshwaram |
123 |
045-11-000030 |
|
Construction of 6 Individual houses at Subedarpallya Harijana Colony and Siddarth Slum in Ward No. 45 Mallesharam |
124 |
045-11-000031 |
|
Construction of 6 Individual Houses at SubedarPallya Harijana Colony and Siddarth Slum in Ward No. 45 Malleshwarm |
125 |
045-11-000032 |
|
Improvements to Govt. School (Santhe Maidana) in Yashavanthapura of Ward no. 45 |
126 |
045-11-000033 |
|
Replacement of Water Supply and UGD Pipe lines from 6 " to 9" in 7 wards of Malleshwaram Assembly Constituency |
127 |
045-11-000034 |
|
Development of Malleshwaram ground for providing and fixing M.S.grill all round the play ground and repairs to existing toilet with sanitaryline at ward No.45 |
128 |
045-11-000035 |
|
Development of Malleshwaram ground for providing and fixing tensile supporting structure Canopy on entrance and change of roof for existing steps |
129 |
045-11-000037 |
|
Maintenance of parks at police station road Yashavanthapur in W.N 45 |
130 |
045-11-000038 |
|
DRILLING OF 10 BOREWELLS PROVIDING SUBMERSIBLE PUMPSET AND PIPELINES IN WARD NO. 045 MALLESHWARAM |
131 |
045-11-000039 |
|
Dry Waste Collection and Sorting Centter at HMT main road Mathikere |
132 |
045-11-000040 |
|
Confinement block around Trees for water retention at Malleshwaram surrounding 17th cross roads in ward no 45 |
133 |
045-11-000041 |
|
Confinement block around Trees for water retention at Malleshwaram 8th cross road to 18th cross road in ward no 45 |
134 |
045-11-000042 |
|
Confinement block around Trees for water retention at Malleshwaram road M S R road Margosa road and Sri C V Raman road in ward no 45 |
135 |
045-11-000043 |
|
PROVIDING DIRINKING WATER SUPPLY TO PUBLIC THROUGH WATER SUPPLY TANKER IN WARD NO.45 |
136 |
045-12-000001 |
|
Drilling of 3Borewell, providing and fixing submersible pumpset and pipeline for water supply in ward no. 045 under 22.75 percent grants |
137 |
045-12-000002 |
|
Desilting of secondary drains in MSR road to triven road 0.35 kms in ward no.36 |
138 |
045-12-000003 |
|
Improvements to Footpath and drain at 18th cross Northern side from 8th main to 14th main ward no. 45 |
139 |
045-12-000004 |
|
Improvements to Footpath and drain at 18th cross southern side from 8th main to 12th main ward no. 45 |
140 |
045-12-000005 |
|
Improvements to drain and culverts at Gayathir Temple road from YPR Circle in ward no. 45 |
141 |
045-12-000006 |
|
Improvements to footpath and drain at 17th cross Both side from 8th main to 14th main ward no. 45 |
142 |
045-12-000007 |
|
Construction of drain at Conservancy from 3rd main K.N. Extn., 1st main (Y. Narayanaswamappa road ) in ward no. 45 |
143 |
045-12-000008 |
|
Desilting of drain at 9th cross Gokula 1st phase 2nd stage in ward no. 45 (Northern side ) |
144 |
045-12-000009 |
|
Desilting of drain at 9th cross Gokula 1st phase 2nd stage in ward no. 45 (Southern side) |
145 |
045-12-000010 |
|
Providing Concreting roads to Conservancy roads in between 5th and 4th cross Gokula 1st stage 2nd phase in ward no. 45 |
146 |
045-12-000044 |
|
x |
147 |
045-12-000045 |
|
x |
148 |
045-12-000046 |
|
x |
149 |
045-12-000047 |
|
x |
150 |
045-12-000048 |
|
x |
151 |
045-12-000049 |
|
x |
152 |
045-12-000050 |
|
x |
153 |
045-12-000051 |
|
x |
154 |
075-11-N-G-O-P-PL-005 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 75 |
155 |
075-11-N-G-O-P-PL-006 |
|
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 75 |
156 |
045-13-000001 |
|
Construciton Of Culverts At Msr Road And C.V. Raman Road Junction In Ward No.45 |
157 |
045-13-000002 |
|
Construction Of Rcc Drain At Shariff Slum In Ward No.45 |
158 |
045-13-000003 |
|
Construction Of Samudaya Bhavana In Ward No.45 |
159 |
045-13-000004 |
|
Emergency Works At Ward No.45 |
160 |
045-13-000005 |
|
Emergency Works At Ward No.45 |
161 |
045-13-000006 |
|
Emergency Works At Ward No.45 |
162 |
045-13-000007 |
|
Engaging Private Labours And Tractor In Ward No.45 |
163 |
045-13-000008 |
|
Improvements To Corportation Building (Tailoring Centre) At Subedarpalya In Ward No.45 |
164 |
045-13-000009 |
|
Improvements To Drain And Footpath At 1St Cross (North Side) Gokula 1St Stage 4Th Phase In Ward No.45 |
165 |
045-13-000010 |
|
Improvements To Drain And Footpath 1St Main Road (Y.Narayanaswamappa Road) (Eastern Side) Ch:500.00Mtrs To 750.00Mtrs Ward No.45 |
166 |
045-12-000011 |
|
Providing And Laying Of 225 Mm Dia Sw Line In Yeshawanthapura Market Slum (Sharifnagar), Yeshawanthapura Coming Under Yeshawanthapura S/S/ |
167 |
045-13-000011 |
|
Improvements To Drain And Footpath 1St Main Road (Y.Narayanaswamappa Road) (Eastern Side) Ch:750.00Mtrs To 1000.00Mtrs Ward No.45 |
168 |
045-12-000012 |
|
Development Of Malleswaram Park In W.N 45 |
169 |
045-13-000012 |
|
Improvements To Drain And Footpath At 4Th Main Road From 8Th Cross Gokula 1St Stage 2Nd Phase To 6Th Cross Gokula 1St Stage 4Th Phase In Ward No.45 (Eastern Side) |
170 |
045-12-000013 |
|
Desilting Of Road Side Drain At Sc Road From Ypr Circle To Railway Sub Way (Shariff Slum) Southern Side In Ward No.45 |
171 |
045-13-000013 |
|
Improvements To Drain And Footpath At 4Th Main Road From 8Th Cross Gokula 1St Stage 2Nd Phase To 6Th Cross Gokula 1St Stage 4Th Phase In Ward No.45 (Western Side) |
172 |
045-12-000014 |
|
Drilling Of Borewell Providing Submersible Pumpset And Pipe Lines At 2Nd Cross Msr Road Kn Extn In Ward No45 |
173 |
045-13-000014 |
|
Improvements To Drain And Footpath At 8Th Main Road From 15Th Cross To 18Th Cross Ch:240.00Mtrs To 350.00Mtrs Both Side In Ward No.45 |
174 |
045-13-000015 |
|
Improvements To Drain At 7Th Main In B/W 18Th And 19Th Cross Malleshwaram In Ward No.45 |
175 |
045-12-000015 |
|
Drilling Of Borewell Providing Submersible Pumpset And Pipe Lines At 3Rd Main Kaali Temple Road Subedarpalya In Ward No-45 |
176 |
045-13-000016 |
|
Providing Name Boards To Roads Ward No.45 |
177 |
045-12-000016 |
|
Drilling Of Borewell Providing Submersible Pumpset And Pipe Lines At 5Th Cross Kn Extn In Ward No-45 |
178 |
045-12-000017 |
|
Relaying Of 9 Dia Ugd Lines At Following Road In Ward No-45 |
179 |
045-13-000017 |
|
Improvements To Drain And Footpath 7Th Main Road From 3Rd Cross To 5Th Cross (Western Side) Gokula 1St Phase 2Nd Stage, Ward No.45 |
180 |
045-12-000019 |
|
Improvements To Drain And Footpath At 7Th Main From Pipeline Road To 2Ndcross (North Side) In Ward No-45 |
181 |
045-12-000020 |
|
Improvements To Drain And Footpath At 7Th Main From Pipeline Road To 2Ndcross (South Side) In Ward No-45 |
182 |
045-12-000021 |
|
Improvements To Drain And Footpath At 8Th Main From Pipeline Road To 2Nd Cross (North Side) In Ward No-45 |
183 |
045-12-000022 |
|
Improvements To Drain And Footpath At 8Th Main From Pipeline Road To 2Nd Cross (Southern Side) In Ward No-45 |
184 |
045-12-000023 |
|
Improvements To Drain And Footpath At 9Th Main From Pipeline Road To 2Nd Cross (North Side) In Ward No-45 |
185 |
045-12-000024 |
|
Improvements To Drain And Footpath At 9Th Main From Pipeline Road To 2Nd Cross (Southren Side) In Ward No-45 |
186 |
045-13-000024 |
|
Re-Doing Road Cut Portion And Providing Asphalting To Triveni Road From Yeshwanthapura Circle To Sswd In Gokula 1St Stage 2Nd Phase In Ward No 45 |
187 |
045-12-000025 |
|
Improvements To Drain And Footpath At 6Th Cross From Subedarpalya 1St Main Road To Triveni Road (Eastern Side) In Ward No-45 |
188 |
045-12-000026 |
|
Improvements To Drain And Footpath At 6Th Cross From Subedarpalya 1St Main Road To Triveni Road (Western Side) In Ward No-45 |
189 |
045-13-000026 |
|
Re-Doing Road Cut Portion And Providing Asphalting To Pipeline Road From 1St Main Ypr To Subedarpalya Main Road In Ward No 45 |
190 |
045-12-000027 |
|
Providing Concreting To Damage Road And Reconstruction Damage Drains At Subedarpalya Harijana Colony Area In Ward No-45 |
191 |
045-13-000027 |
|
Re-Doing Road Cut Portion And Providing Asphalting To To S C Road From Ypr Circle 1St Main In Ward No 45 |
192 |
045-12-000028 |
|
Construction Of Culverts At 1St Main Road Near 6Th Cross Gokul 1St Stage 4Th Phase In Ward No-45 |
193 |
045-12-000029 |
|
Construction Of Drain At Nh-4 Near Gokuldas In Ward No-45 |
194 |
045-12-000030 |
|
Construction Of Rcc Drain At Shariff Slum Yeshwanthpur In Ward No-45 |
195 |
045-12-000031 |
|
Desilting Of Drain At S.C Road In Ward No-45 |
196 |
045-13-000031 |
|
Construction Of Group Houses (Multi Stored Building ) In Bhyrahanumayian Slum In Ward No-45 (2,3 And 4Th Floor) |
197 |
045-13-000032 |
|
Providing Asphalting To 16Th Cross Road 10Th Main And 10Th A Main And 11Th Main Malleshwaram In Ward No 45 |
198 |
045-12-000032 |
|
Engaging Private Labours And Tractor In Ward No-45 |
199 |
045-12-000033 |
|
Filling Of Potholes And Road Cutting In Gokul 1St Stage 2Nd Phase Ward No-45 |
200 |
045-13-000034 |
|
Providing Asphalting To 17Th And 17Th A Cross And 18Th Cross Of Malleshwaram In Ward No 45 |
201 |
045-12-000034 |
|
Filling Of Potholes And Road Cutting In Gokul 1St Stage 4Th Phase Ward No-45 |
202 |
045-13-000035 |
|
Providing Asphalting To 1St Main Road From M S R Road To Bombay Dying Yeshwanthpura In Ward No 45 |
203 |
045-12-000035 |
|
Filling Of Potholes And Road Cutting In K N Extn Area In Ward No-45 |
204 |
045-12-000036 |
|
Filling Of Potholes And Road Cutting In Malleswaram Area In Ward No-45 |
205 |
045-11-000036 |
|
Maintenance Of Balasubramanyam Park 16Th Cross |
206 |
045-13-000036 |
|
Providing Asphalting To Bombay Dying To S C Road Yeshwanthpura Including Providing U Turn In Front Of Metro And Columbia Asia Hospital In Ward No 45 |
207 |
045-12-000037 |
|
Filling Of Potholes And Road Cutting In Malleswaram Area In Ward No-45 |
208 |
045-12-000038 |
|
Improvements To Drain And Foothpath 1St Main Road Y Narayanaswamappa Road Eastern Side Ch:0.00 Mtrs To 250.00 Mtrs In Ward No-45 |
209 |
045-13-000038 |
|
Providing Electrical Maintenance Of Furnance, Dg Set, Motors Etc., Complete At Mediagrahara Electric Crematorim. |
210 |
045-12-000039 |
|
Improvements To Drain And Foothpath 1St Main Road Y Narayanaswamappa Road Eastern Side Ch:250.00 Mtrs To 500.00 Mtrs In Ward No-45 |
211 |
045-13-000039 |
|
Providing Electrical Maintenance Of Yeswanthpura Shopping Complex In Ward No 45 |
212 |
045-13-000040 |
|
A.M.C. Of Dg Set, Pump Set, Wireless Sets And Internal Telephones At Yashwanthapura Shopping Complex In Ward No 45 |
213 |
045-12-000040 |
|
Maintenance Of Foothpath And Drain At Malleswaram And Yeshwanthpur Surrounding Areas In Ward No-45 |
214 |
045-13-000041 |
|
A.M.C. Of Lift No 1 In Yashwanthapura Shopping Complex In Ward No 45 |
215 |
045-12-000041 |
|
Improvements To Drain And Footpath At 10Th Main Road From 3Rd Cross To 5Th Cross (Both Side) Gokula 1St Stage 2Nd Phase Ward No 45 |
216 |
045-13-000042 |
|
A.M.C. Of Lift No 2 In Yashwanthapura Shopping Complex In Ward No 45 |
217 |
045-12-000042 |
|
Improvements To Drain And Footpath At 6Th Cross And Surrounding Road From 6Th Main To 1St Main Road Gokula 1St Stage 2Nd Phase In Ward No 45 |
218 |
045-13-000043 |
|
Providing Additional Street Lights Fittings And Connected Accessories At Malleshwaram. |
219 |
045-12-000043 |
|
Improvements To Drain And Footpath From 7Th 7Th A Cross And Surrounding Roads From 6Th Main To Main Road Gokula 1St Stage 32Nd Phase In Ward No 45 |
220 |
045-13-000044 |
|
Improvements And Providing Chin Fencing And Children Playing Equipments At Parks 13Th Main 17Th Cross In Ward No 45 Malleshwaram |
221 |
045-12-000052 |
|
Improvements To Drain And Footpath At 8Th Cross From Triveni Road To1St Main Road Gokula 1St Stage 2Nd Phase In Ward No 45 |
222 |
045-11-000052 |
|
Repairs To Pathway Compost Pit In Park At Ward No 45 |
223 |
045-12-000053 |
|
Improvements To Drain And Footpath At 3Rd And 4Th Main And Surrounding Road From 6Th Cross To Pipeline Road K N Extn In Ward No 45 |
224 |
045-12-000054 |
|
Improvements To Drain And Footpath And Restoration Of Bwssb Pipeline Cutting And Providing Concreting To Damaged Pipeline A B And C Road From Pipeline Road To S C Road In Ward No 45 |
225 |
045-12-000055 |
|
Improvements To Drain 1St A 2Nd Main Road And 7Tha Cross From 6Th Cross To Pipeline Road In Ward No 45 |
226 |
045-12-000056 |
|
Improvements To Drain Footpath 4Th Cross From Triveni Road To Kali Temple Road (Southern Side) In Ward No 45 |
227 |
045-12-000057 |
|
Improvements To Drain Footpath At 5Th Cross From Triveni Road To 9Th Main Both Side In Wardno 45 |
228 |
045-12-000058 |
|
Improvements To Drain Footpath At 6Th Cross From Subedarpalya 1St Main To Triveni Road In Ward No 45 |
229 |
045-12-000059 |
|
Improvements To Drain And Restoration Of Bwssb Road Cutting And Providing Concreting To Damaged Portion At 3Rd Main Road Behind Margosa And 18Th Cross In Ward No 45 |
230 |
045-12-000060 |
|
Construction Of Rcc Drain At Shariff Slum Yeshwanthpur In Ward No 45 |
231 |
045-12-000061 |
|
Improvements Todrain And Footpath At 7Th A 8Th A Cross From Triveni Road To 4Th Main K N Extn In Ward No 45 |
232 |
045-12-000062 |
|
A.M.C Of Electrical Installation By Engaging The Helper,Wire Men, Electrician Etc., At Yeswanthpura Shopping Complex. |
233 |
045-12-000063 |
|
Amc Of Electrical Crematorium By Engaging Required Staff Including Periodically Repairs Of Furnaces, Dg Sets Cleaning Of Rubber, Chimmney,Repairs To Motors Etc., Complete Atmediagrahara Electric Crema |
234 |
045-12-000064 |
|
Providing Additional Street Lights Fittings And Connected Accessories At Malleshwaram. |
235 |
045-12-000065 |
|
Providing Asphalting To Roads At 1St Main Road And Surrounding Area Of Subhedhar Palya Ward No 45 |
236 |
045-12-000066 |
|
Restoration Of Road Cut Portion By Bwssb In Ward No 45 |
237 |
045-12-000067 |
|
Providing Asphalting At Bad Reaches In Ward No 45 |
238 |
045-12-000068 |
|
Maintenance Of Balasubramanyam Park 16Th Cross In Ward No.45 |
239 |
045-12-000069 |
|
Maintenance Of Park Near Yashavanthapura Police Station In Ward No.45 |
240 |
045-12-000070 |
|
Repair And Maintenance Of Borewell, Pumpset At Park In Ward No.45 |
241 |
045-13-000071 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 1St Cross Surrounding Areas From Subedarpalya 1St Main Road To Msr Road (Both Side) In W-45 |
242 |
045-13-000072 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 2Nd Cross From Triveni Road To 1St Main Road Subedarpalya N H Colony K N Extn (Both Side) In W-45 |
243 |
045-13-000073 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 2Nd Cross Surrounding Areas From Subedarpalya 1St Main Road To Msr Road (Both Side) In W-45 |
244 |
045-13-000074 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 3Rd Cross From Triveni Road To 1St Main Road Subedarpalya N H Colony K N Extn (Both Side) In W-45 |
245 |
045-13-000075 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 3Rd Cross Surrounding Areas From Subedarpalya 1St Main Road To Msr Road (Both Side) In W-45 |
246 |
045-13-000076 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 4Th Cross From Triveni Road To 1St Main Road Subedarpalya N H Colony K N Extn (Both Side) In W-45 |
247 |
045-13-000077 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 5Th Cross From Triveni Road To 1St Main Road Subedarpalya N H Colony K N Extn (Both Side) In W-45 |
248 |
045-13-000078 |
|
Construction Of Rcc Drain And Improvements To Foothpath At 6Th Cross From Triveni Road To 1St Main Road Subedarpalya N H Colony K N Extn (Both Side) In W-45 |
249 |
045-13-000079 |
|
Drilling Of Borewell And Providing Pumping Machinery And Pipeline At Karimandi Slum Pipeline Road In W-45 |
250 |
045-13-000080 |
|
Drilling Of Borewell And Providing Pumping Machinery And Pipeline At Siddartha Slum 6Th Cross Triveni Road In W-45 |
251 |
045-13-000081 |
|
Drilling Of Borewell And Providing Pumping Machinery And Pipeline At 3Rd Cross 1St Main Road Subedarpalya Yeshwanthpur In W-45 |
252 |
045-13-000082 |
|
Drilling Of Borewell And Providing Pumping Machinery And Pipeline At Byrahanmaiah Slum In In W-45 |
253 |
045-13-000083 |
|
Drilling Of Borewell And Providing Pumping Machinery And Pipeline At Nanjappa Reddy Colony In W-45 |
254 |
045-13-000084 |
|
Improvements To Drain And Foothpath At Triveni Road From 3Rd Cross Swd Drain Gokula 1St Stage 2Nd Phase (Western Side) In W-45 |
255 |
045-14-000001 |
|
Drilling of borwell and providing water supply scheme to 5th cross 3rd main near Mangal nursing home in W-45 |
256 |
045-14-000002 |
|
Drilling of borwell and providing water supply scheme to 8th cross 7th main gokula 1st stage 2nd phase in W-45 |
257 |
045-14-000003 |
|
Drilling of borwell and providing water supply scheme to 9th cross 2nd main K N Extn in W-45 |
258 |
045-14-000004 |
|
Drilling of borwell and providing water supply scheme to 9th main 3rd cross gokula 1st stage 2nd phase in W-45 |
259 |
045-14-000005 |
|
Drilling of borwell and providing water supply scheme to Subedarpalya 1st main road in W-45 |
260 |
045-14-000006 |
|
Removing of debries by side of NH4 from YPR circle in ward no 45 |
261 |
045-14-000007 |
|
Desilting of drain at Shariff slum at Yeshwanthapura in ward no 45 Malleshwaram |
262 |
045-14-000008 |
|
Construction of drain at Gokula 1st stage 4th phase Balance portion in ward no.45 |
263 |
045-14-000009 |
|
Construction of footpath and providing Grill in NH4 opp. to Saralapuria Apartments in ward no.45 |
264 |
045-14-000010 |
|
Desilting of drain and maintenance of footpath Subedharpalya 1st main road from S C Road to MSR road (Bothside) in ward no.45 |
265 |
045-14-000011 |
|
Emergency works in Gokula 1st stage 4th phase and adjoining Area in ward no.45 |
266 |
045-14-000012 |
|
Emergency works in K N Extension and adjoining Area in ward no.45 |
267 |
045-14-000013 |
|
Emergency works in Malleshwaram Area in ward no.45 |
268 |
045-14-000014 |
|
Emergency works in Subedhar palya and adjoining Area in ward no.45 |
269 |
045-14-000015 |
|
Improvements to drain and footpath in 4th cross from Triveni road to 1st main road in ward no.45 |
270 |
045-14-000016 |
|
Mainteance of Ward (including Debries Removal) in ward no.45 From 2nd shift 200PM to 10.00PM |
271 |
045-14-000017 |
|
Mainteance of Ward (including Debries Removal) in ward no.45 From Ist shift 6.00AM to 2.00PM |
272 |
045-14-000018 |
|
Pothole filling in ward no.45 |
273 |
045-14-000019 |
|
Providing and Installing Shudder and cutter in ward no.45 |
274 |
045-14-000020 |
|
Providing Concreting all Gallies at Shariff slum Yeshwanthpur ward no.45 |
275 |
045-14-000021 |
|
Providing concreting to damaged road (road cut portion done by BWSSB) in ward no.45 |
276 |
045-14-000022 |
|
Providing Rainwater harvesting in ward no.45 |
277 |
045-14-000023 |
|
Providing Water connection to (Including BWSSB meter) colonies and Vataras in ward no.45 |
278 |
045-14-000024 |
|
Removal of Silt and Maintenance of footpath at Malleshwaram in ward no.45 |
279 |
045-14-000025 |
|
Repairs to Borewells in ward no.45 |
280 |
045-14-000026 |
|
Repairs to Damaged culverts in Malleshwaram ward no.45 |
281 |
045-14-000027 |
|
Construction of Dry Waste Collection and Segregation centre at Yeshwanthapura Circle in ward no 45 (Malleshwaram) |
282 |
045-14-000028 |
|
Maintenance of Park at Yashavanthapura Police Station road Balasubramanyam Park in W-45 |
283 |
045-14-000029 |
|
Repair and Maintenance of Borewell, pumpset at Park in Ward No. 45 |
284 |
045-14-000030 |
|
Providing LED lights to 8th main Malleswaram from YPR circle to 15th cross in Ward No.45 |
285 |
045-14-000031 |
|
Supplying and Fixing of timer Swithch and Connected Accessories to Malleswaram in ward No.45 |
286 |
045-14-000032 |
|
AMC of lifts no 2 in Yeshwanthpura shopping complex in W-45 |
287 |
045-14-000033 |
|
Providing electrical maintenance of furnance DG set motors etc complet at Mediagrahara electric cremarorium in W-45 |
288 |
045-14-000034 |
|
AMC of lifts no 2 in Yeshwanthpura shopping complex in W-45 |
289 |
045-14-000035 |
|
Maintenance of drain and footpath at Triveni road from Yeshwanthpur circle to 4th cross (both side) in ward no 45 |
290 |
045-14-000036 |
|
Repairs to Damaged culverts in Subedar palya in ward no 45 |
291 |
045-14-000037 |
|
Providing concreting to damaged road in ward no 45 |
292 |
045-14-000038 |
|
Restoration of road cut portion done by BWSSB by Providing Wet mix in ward no 45 |
293 |
045-14-000039 |
|
Removal of Silt and Maintenance of footpath at Malleshwaram in ward no 45 |
294 |
045-15-000001 |
|
Construction of New drain at 15th A cross from 6th main to 7th main Malleshwaram in ward no.45 |
295 |
045-15-000002 |
|
Construction of New drain below Railway under pass at Yeshwanthpur (from NH4 to S.C. Road) in ward no.45 |
296 |
045-15-000003 |
|
Emergency works in Gokula 1st stage 4th phase and adjoining Area in ward no.45 |
297 |
045-15-000004 |
|
Emergency works in K N Extension and adjoining Area in ward no.45 |
298 |
045-15-000005 |
|
Emergency works in Malleshwaram Area in ward no.45 |
299 |
045-15-000006 |
|
Emergency works in Subedhar palyaand adjoining Area in ward no.45 |
300 |
045-15-000007 |
|
Improvements to drain and footpath in 2nd main from 6th cross to 9th cross K.N. Extn., in ward no.45 (Eastern side) |
301 |
045-15-000008 |
|
Improvements to drain and footpath in 2nd main from 6th cross to 9th cross K.N. Extn., in ward no.45 (Western side) |
302 |
045-15-000009 |
|
Improvements to drain and footpath in 3rd main from 6th cross to 5th cross and surrounding area K.N. Extn., in ward no.45 (Both side) |
303 |
045-15-000010 |
|
Improvements to drain and footpath in 5th cross from 7th main to 11th main and surrounding area Gokula 1st stage 2nd phase in ward no.45 (Both side) |
304 |
045-15-000011 |
|
Improvements works at Malleshwaram area Ward no.45 |
305 |
045-15-000012 |
|
Mainteance of Ward (including Debries Removal) in ward no.45 From 2nd shift 200PM to 10.00PM |
306 |
045-15-000013 |
|
Mainteance of Ward (including Debries Removal) in ward no.45 From Ist shift 6.00AM to 2.00PM |
307 |
045-15-000014 |
|
Pothole filling in ward no.45 |
308 |
045-15-000015 |
|
Providing Asphalting to 13th main from 15th cross to 17th cross Malleshwaram in ward no.45 |
309 |
045-15-000016 |
|
Providing Electrical maintenance of Yeswanthpura shopping including motors, pumpsets, D.G sets, batteries and connected accessories in ward no 45 |
310 |
033-11-N-W-B-B-FO-016 |
|
CONST OF INDIVIDUAL HOUSES UNDER 22.75% GRANTS AT JABBAR BLK ARAMANENGR IN W-33
|
311 |
033-11-N-W-B-B-FO-018 |
|
CONST OF INDIVIDUAL HOUSES UNDER 22.75% GRANTS AT BHARATH MATHA BLK PACKAGE -02 IN ARAMANENGR IN W-33
|
312 |
033-11-N-W-B-B-FO-020 |
|
CONST OF INDIVIDUAL HOUSES UNDER 22.75% GRANTS AT ANM BLK PACKAGE -02 IN ARAMANENGR IN W-33
|
313 |
035-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.35
|
314 |
000-10-M-G-E-O-MI-002 |
|
ENGAGING ON HIRE BASIS JCB EXCAVATOR AT FLOOD AFFECTED ON DAILY BASIS PERTAINING TO ASST. EXECUTIVE ENGINEER PADMANABHANAGAR JURISDICTION FOR A PERIOD UP TO 31-OCTOBER-09 IN WARD NO 55 & 56
|
315 |
035-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.35
|
316 |
035-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.35
|
317 |
036-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.36
|
318 |
036-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.36
|
319 |
036-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.36
|
320 |
036-11-N-W-B-C-FO-001 |
|
CONST OF APPROACH RAMP & OTHER WORKS FOR RCC BRIDGE ACROSS SWD FOR JAYARAM SLUM M/R & PIPE LINE RD IN W NO 4 (36) MATHIKERE
|
321 |
036-11-N-W-B-C-FO-003 |
|
036-11-N-W-B-C-FO-003 CONST OF ALLIED WORKS TO RCC BRIDGE ACROSS SWD FOR JAYARAMA SLUM M/R & PIPE LINE RD IN W NO 4 (36) MATHIKERE
|
322 |
045-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.45
|
323 |
045-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.45
|
324 |
045-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.45
|
325 |
064-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.64
|
326 |
064-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.64
|
327 |
064-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.64
|
328 |
065-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.65
|
329 |
065-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.65
|
330 |
065-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.65
|
331 |
066-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.66
|
332 |
066-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.66
|
333 |
066-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.66
|
334 |
076-11-M-G-E-D-DB-001 |
|
REMOVAL OF DEBRIS/SILT/OTHER MATERIALS FROM ROAD/ FOOTPATH / VACCANT SITES ETC., BY DEPLOYING TRACTOR AND GANG IN WARD NO.76
|
335 |
076-11-M-G-E-D-DD-001 |
|
DESILTING OF DRAINS IN WARD NO.76
|
336 |
076-11-M-G-E-R-PF-001 |
|
POT FILLING IN ALL ROADS IN WARD NO.76
|